General Dynamics OTS (wilkes Barre), LLC Contracts in Pennsylvania
Federal contract operations by General Dynamics OTS (wilkes Barre), LLC performed in Pennsylvania (PA)
Overview
Total Contract Value: $2,968,779,716
Contract Count: 26
Average Contract Size: $114.2M
Sole Source Rate: 0%
Small Business Rate: 0%
Awarding Agencies
- Department of Defense — $3.0B (26 contracts)
Spending by Sector
- Other: $3.0B (26 contracts)
Contracts
- MANUFACTURE, ASSEMBLY, INSPECTION, PACKAGE, AND DELIVERY OF THE 155MM ARTILLERY M795 PROJECTILE BODY ASSEMBLY IN SUPPORT OF UKRAINE. — $700.1M
- 155MM CAPACITY EXPANSION PROJECT FOR M795 AND M1128 TO 65K/MONTH — $356.4M
- M795 METAL PARTS — $230.4M
- PRODUCTION BASE SUPPORT PROJECT FOR UNIVERSAL ARTILLERY PROJECTILE LINE AT SCAAP — $180.2M
- PURCHASE OF M795 AND 120MM LARGE CALIBER METAL PARTS — $177.7M
- REQUIREMENTS FOR MANUFACTURE,INSPECTION,AND DELIVERY OF 60MM&81MM MORTAR PROJECTILE (SHELL BODIES). THIS INCLUDES SEVEN SHELL BODY TYPES WHICH ARE COMPRISED OF THE FOLLOWING: M769, PAINTED BODY, M720A1, BODY ASSEMBLY FOR PROJECTILE 60MM , HE , M720 HIGH EXPLOSIVE, M879A1, 81MM PRACTICE ROUND, M821, 81MM, HIGH EXPLOSIVE, M879A1, 81MM PRACTICE ROUND, M722, SMOKE ROUND. ALL SHELL BODIES PRODUCED UNDER THIS EFFORT WILL SUPPORT THE LOAD/ ASSEMBLE/PACK (LAP) OF 60MM&81MM FORGED HIGH EXPLOSIVE, M879, 81MM PRACTICE ROUNDS , AND WHITE PHOSPHORUS (WP) SMOKE ROUNDS. — $159.3M
- PRODUCTION BASE SUPPORT PROJECT FOR UNIVERSAL ARTILLERY PROJECTILE LINE B AWARDED AS A UCA — $156.3M
- SCAAP PRODUCTION BASED SUPPORT FOR UNIVERSAL ARTILLERY PROJECTILE LINE C AWARDED AS A UCA — $150.5M
- MANUFACTURE, PRODUCE, AND DELIVER 155MM M795 METAL PARTS IN SUPPORT OF UKRAINE DOD STOCK REPLENISHMENT. — $125.7M
- 120MM HE/FRP/SMOKE MORTAR CARTRIDGE SHELL BODIES — $113.0M
- PURCHASE OF M795 METAL PARTS. — $94.8M
- MANUFACTURE AND DELIVERY OF 155MM M795 METAL PARTS FOR DOD STOCKPILE REPLENISHMENT OF UKRAINE SUPPLIES. — $87.1M
- FY22 FUNDED ORDERING PERIOD FOUR FOR SURGE FACILITIZATION — $55.7M
- DELIVERY ORDER 0006 FOR THE PURCHASE OF 126,810 155MM M795 METAL PARTS UNDER ORDERING PERIOD 4. — $52.4M
- XM1113/XM1210 PRODUCTION LINE PROJECT — $45.6M
- XM1128 PRODUCTION LINE BUILD PROJECT — $42.6M
- MANUFACTURE, PRODUCTION, AND DELIVERY OF 120MM MORTAR SHELL BODIES. — $36.2M
- 120MM DELIVERY ORDER — $35.7M
- THE PURPOSE OF THIS DELIVERY ORDER IS TO MANUFACTURE, PRODUCE, AND DELIVERY 60,486 155MM HIGH EXPLOSIVE M795 METAL PARTS IN SUPPORT OF PROJECT MANAGER, COMBAT AMMUNITION SYSTEMS. — $32.7M
- GDOTS DELIVERY ORDER #1 120MM MORTAR SHELL BODIES — $27.7M
Frequently Asked Questions
How many contracts does General Dynamics OTS (wilkes Barre), LLC have in Pennsylvania?
General Dynamics OTS (wilkes Barre), LLC has 26 contracts performed in Pennsylvania worth a combined $3.0B.
What is the average contract size for General Dynamics OTS (wilkes Barre), LLC in Pennsylvania?
The average contract size is $114.2M.