Government Contract Spending in Pennsylvania
State Overview
Total Obligated: $43,039,801,065,033
Contract Count: 31833
Top Contractors in Pennsylvania
- Fluor Marine Propulsion, LLC — $28.2B
- Bechtel Marine Propulsion Corporation — $20.6B
- Bechtel Plant Machinery, Inc. — $17.2B
- BAE Systems Land & Armaments L.P. — $14.5B
- THE Boeing Company — $12.2B
- Bechtel Bettis Incorporated — $7.7B
- Merck Sharp & Dohme Corp. — $6.2B
- BAE Systems Land and Armaments L.P. — $5.8B
- Lockheed Martin Corp — $5.7B
- Pfizer Inc. — $5.2B
Top Federal Agencies in Pennsylvania
- Department of Defense — $89.8B
- Department of Energy — $27.8B
- Department of Health and Human Services — $16.0B
- Department of Veterans Affairs — $831.5M
Spending by Sector
- Other: $134.5B
Recent Contracts
- MANAGEMENT AND OPERATION OF THE NAVAL NUCLEAR LABORATORY AND NAVAL NUCLEAR PROPULSION PROGRAM SUPPORT — $14.8B
- NAVAL NUCLEAR LABORATORY — $13.4B
- NUCLEAR REACTOR WORK AT THE BETTIS AND KNOLLS ATOMIC POWER LABORATORIES — $10.9B
- MANAGEMENT AND OPERATION OF THE BETTIS ATOMIC POWER LABORATORY AND THE KNOLLS ATOMIC POWER LABORATORY — $9.7B
- CH-47F CARGO HELICOPTER MULTIYEAR II. 34 NEW BUILD HELICOPTERS AND 121 RENEW HELICOPTERS. — $4.9B
- GLOBAL POSITIONING SYSTEM (GPS) IIIA — $4.5B
- CH-47F MULTI-YEAR CONTRACT FOR NEW BUILD AND REMANUFACTURE AIRCRAFTS — $4.4B
- 199905!1700!1304!BZ004!NAVAL SEA SYSTEMS COMMAND !N0002498C4064 !A!*!P00001 !19990128!20040131!089176176!094878980!094878980!N!15307!BECHTEL NATIONAL, INC !45 FREMONT ST !SAN FRANCISCO !CA!94105!83512!003!42!WEST MIFFLIN !ALLEGHENY !PENN !0001!+000107440000!N!N!000000000000!M181!OPERATION/GOVT-OWNED CONTRACTOR-OPERATED R&D FAC !A3 !SHIPS !2000!NOT DISCERNABLE OR CLASSIFIED !7371!3!*!*!C!B!A!*!A !N!U!2!002!B!* !Z!N!Z!* !* !N!C!*!A!A!A!A!A!*!* !*!N!A!C!N!*!*!*!*!*! — $4.3B
- 199705!1700!1266!BZ004!NAVAL SEA SYSTEMS COMMAND !N0002497F4011 !A!*!* !19961105!20060930!087689394!161906078!161906193!Y!0C2Y9!ENERGY, UNITED STATES DEPT OF !1000 INDEPENDENCE AVE SW !WASHINGTON !DC!20585!50000!001!11!WASHINGTON !DISTRICT OF COLUMBIA !D.C. !0001!+000182497810!N!N!000000000000!4470!NUCLEAR REACTORS !A3 !SHIPS !2SDN!SUBMARINE NUCLEAR-SSN !3443!8!*!*!*!B!*!*!B !*!*!0!000!*!* !*!*!*!* !* !*!*!*!*!*!*!*!*!*!* !*!*!*!*!*!*!*!*!*!*! — $4.0B
- IGF::OT::IGF — $3.7B
- NAVAL REACTORS — $3.4B
- — $3.4B
- S1B — $3.0B
- LETTER CONTRACT FOR EARLY PROCUREMENT MATERIAL TO SUPPORT THE M109A7/M992A3 VEHICLE PRODUCTION. — $2.9B
- NAVAL REACTORS — $2.7B
- S9G — $2.5B
- EARLY ORDER MATERIAL IN SUPPORT OF THE FUTURE PURCHASE OF 197 AMPVS AND FACILITY CAPACITY EXPANSION EFFORTS TO INCREASE THE AMPV PRODUCTION RATE TO 197 VEHICLES PER YEAR. SUPPORTS UKRAINE EFFORTS. — $2.5B
- S1B — $2.0B
- THIS ACTION IS COST PLUS INCENTIVE-FEE (CPIF) 52 MONTH ENGINEERING AND MANUFACTURING DEVELOPMENT CONTRACT, WITH THREE FIXED PRICE INCENTIVE (SUCCESSIVE TARGETS) (FPI(S)) OPTION YEARS OF LOW RATE INITIAL PRODUCTION (LRIP) FOR THE ARMORED MULTI-PURPOSE VEHICLE (AMPV) REQUIREMENT. THE AMPV FAMILY OF VEHICLES (FOV) IS A MATERIEL SOLUTION REPLACEMENT FOR THE M113 FOV TO MITIGATE CURRENT AND FUTURE CAPABILITY GAPS IN FORCE PROTECTION, MOBILITY, RELIABILITY, AND INTEROPERABILITY BY MISSION ROLE VARIANT TO SUPPORT THE ARMORED BRIGADE COMBAT TEAM (ABCT) ACROSS THE SPECTRUM OF CONFLICT. THE AMPV FOV WILL REPLACE THE FIVE MISSION ROLES CURRENTLY PERFORMED BY THE M113 FOV BY TRANSFERRING THE CURRENT M113 MISSION EQUIPMENT PACKAGES (MEP) TO A NEW VEHICLE PLATFORM. THE AMPV VEHICLE FLEET WILL CONSIST OF THE FOLLOWING FIVE VARIANTS TAILORED TO SPECIFIC MISSION ROLES WITHIN ABCT: GENERAL PURPOSE (GP) VEHICLE; MISSION COMMAND (MCMD) VEHICLE; MORTAR CARRIER (MC) VEHICLE; MEDICAL EVACUATION (ME) VEHICLE; AND MEDICAL TREATMENT (MT) VEHICLE. A TOTAL QUANTITY OF 29 VEHICLES WILL BE DELIVERED DURING EMD (INCLUDING SYSTEM SUPPORT PACKAGES, SPECIAL TOOLS AND TEST EQUIPMENT, AND BALLISTIC HULLS), WITH 52 (LRIP OPTION YEAR 1), 105 (LRIP OPTION YEAR 2), AND 130 (LRIP OPTION YEAR 3) VEHICLES ANTICIPATED DURING THE LRIP OPTION YEARS. RANGE PRICING IS INCLUDED IN THE CONTRACT FOR OPTION PERIODS 2 AND 3. — $2.0B
- — $1.6B