Poseidon Wharf Repairs Cost $38.2M Under Full and Open Competition
Contract Overview
Contract Amount: $38,218,335 ($38.2M)
Contractor: Triton Marine Construction Corp.
Awarding Agency: Department of Defense
Start Date: 2019-09-27
End Date: 2022-04-29
Contract Duration: 945 days
Daily Burn Rate: $40.4K/day
Competition Type: FULL AND OPEN COMPETITION
Number of Offers Received: 3
Pricing Type: FIRM FIXED PRICE
Sector: Construction
Official Description: POSEIDON WHARF REPAIRS, NOTU, CAPE CANAVERAL, FL
Place of Performance
Location: CAPE CANAVERAL, BREVARD County, FLORIDA, 32920
State: Florida Government Spending
Plain-Language Summary
Department of Defense obligated $38.2 million to TRITON MARINE CONSTRUCTION CORP. for work described as: POSEIDON WHARF REPAIRS, NOTU, CAPE CANAVERAL, FL Key points: 1. Contract awarded to Triton Marine Construction Corp. for $38.2 million. 2. Project falls under 'Other Heavy and Civil Engineering Construction' sector. 3. Full and open competition was utilized. 4. Contract duration was 945 days. 5. No small business participation noted.
Value Assessment
Rating: fair
The awarded amount of $38.2 million for heavy civil engineering construction appears within a reasonable range for a project of this scope and duration. Benchmarking against similar wharf repair contracts would provide a more precise assessment.
Cost Per Unit: N/A
Competition Analysis
Competition Level: full-and-open
The contract was awarded through full and open competition, suggesting a robust price discovery process. This method typically leads to competitive pricing as multiple bidders vie for the contract.
Taxpayer Impact: The use of full and open competition is generally favorable for taxpayers, as it aims to secure the best value through market forces.
Public Impact
Ensures operational readiness of naval facilities at Cape Canaveral. Supports critical infrastructure for national defense. Potential for economic impact through local labor and material sourcing.
Waste & Efficiency Indicators
Waste Risk Score: 40 / 10
Warning Flags
- Lack of small business participation.
- Long contract duration (945 days) may indicate potential for cost overruns or scope creep.
Positive Signals
- Awarded under full and open competition.
- Firm fixed price contract type limits cost risk to the government.
Sector Analysis
This contract falls within the heavy and civil engineering construction sector, which is vital for maintaining and upgrading critical infrastructure. Spending benchmarks in this sector can vary significantly based on project complexity and location.
Small Business Impact
The data indicates no small business participation in this contract. Efforts to include small businesses in future large-scale construction projects could enhance economic opportunities and competition.
Oversight & Accountability
The contract was awarded by the Department of the Navy, part of the Department of Defense. Oversight would typically involve contract management teams ensuring adherence to terms and quality standards.
Related Government Programs
- Other Heavy and Civil Engineering Construction
- Department of Defense Contracting
- Department of the Navy Programs
Risk Flags
- No small business participation.
- Long contract duration.
- Limited detail on scope of work.
- No indication of cost comparison to estimates/bids.
Tags
other-heavy-and-civil-engineering-constr, department-of-defense, fl, definitive-contract, 10m-plus
Frequently Asked Questions
What is this federal contract paying for?
Department of Defense awarded $38.2 million to TRITON MARINE CONSTRUCTION CORP.. POSEIDON WHARF REPAIRS, NOTU, CAPE CANAVERAL, FL
Who is the contractor on this award?
The obligated recipient is TRITON MARINE CONSTRUCTION CORP..
Which agency awarded this contract?
Awarding agency: Department of Defense (Department of the Navy).
What is the total obligated amount?
The obligated amount is $38.2 million.
What is the period of performance?
Start: 2019-09-27. End: 2022-04-29.
What was the specific scope of work for the Poseidon Wharf repairs?
The provided data does not detail the specific scope of work for the Poseidon Wharf repairs. Further investigation into contract documents would be necessary to understand the exact nature of the repairs, such as dredging, structural reinforcement, or utility upgrades, which would inform a more precise value assessment.
Were there any performance issues or contract modifications during the 945-day duration?
The provided data does not indicate any performance issues or contract modifications. A review of contract performance reports and modification history would be required to assess if the project stayed on schedule and within budget, or if any issues necessitated changes to the original terms.
How does the final cost compare to the initial bid or estimated cost?
The data shows the awarded amount ($38.2 million) but does not provide the initial bid or estimated cost. Comparing the final awarded price to the initial estimates or the range of bids received during the full and open competition would be crucial for evaluating cost-effectiveness and the success of the price discovery process.
Industry Classification
NAICS: Construction › Other Heavy and Civil Engineering Construction › Other Heavy and Civil Engineering Construction
Product/Service Code: MAINT, REPAIR, ALTER REAL PROPERTY › MAINT, ALTER, REPAIR NONBUILDINGS
Competition & Pricing
Extent Competed: FULL AND OPEN COMPETITION
Solicitation Procedures: NEGOTIATED PROPOSAL/QUOTE
Solicitation ID: N6945019R0906
Offers Received: 3
Pricing Type: FIRM FIXED PRICE (J)
Evaluated Preference: NONE
Contractor Details
Address: 5405 CONSTANCE DR SW, BREMERTON, WA, 98312
Business Categories: Category Business, Corporate Entity Not Tax Exempt, Not Designated a Small Business, Special Designations, Subchapter S Corporation, U.S.-Owned Business
Financial Breakdown
Contract Ceiling: $38,218,335
Exercised Options: $38,218,335
Current Obligation: $38,218,335
Contract Characteristics
Commercial Item: COMMERCIAL PRODUCTS/SERVICES PROCEDURES NOT USED
Cost or Pricing Data: NO
Timeline
Start Date: 2019-09-27
Current End Date: 2022-04-29
Potential End Date: 2022-04-29 00:00:00
Last Modified: 2022-08-23
More Contracts from Triton Marine Construction Corp.
- Repair to Pier 4 AT Pnbc Annex, Philadelphia PA — $39.3M (Department of Defense)
- , P 308 Commercial Power Connection, Cutler ME — $30.6M (Department of Defense)
- RM09-1948 Strcutural Repairs to Piers 2&15 Navsubase NL, Groton, CT — $26.5M (Department of Defense)
- N40085-11-C-7221 Drydock #1 Concrete and Wall Repairs — $21.1M (Department of Defense)
- Base BID / Option 1/ Option 2 — $17.6M (Department of Defense)
View all Triton Marine Construction Corp. federal contracts →
Other Department of Defense Contracts
- Federal Contract — $51.3B (Humana Government Business Inc)
- Lrip LOT 12 Advance Acquisition Contract — $35.1B (Lockheed Martin Corporation)
- SSN 802 and 803 Long Lead Time Material — $34.7B (Electric Boat Corporation)
- 200204!008532!1700!AF600 !naval AIR Systems Command !N0001902C3002 !A!N! !N! !20011026!20120430!008016958!008016958!834951691!n!lockheed Martin Corporation !lockheed Blvd !fort Worth !tx!76108!27000!439!48!fort Worth !tarrant !texas !+000026000000!n!n!018981928201!ac15!rdte/Aircraft-Eng/Manuf Develop !a1a!airframes and Spares !2ama!jast/Jsf !336411!E! !3! ! ! ! ! !99990909!B! ! !A! !a!n!r!2!002!n!1a!a!n!z! ! !N!C!N! ! ! !a!a!a!a!000!a!c!n! ! ! !Y! !N00019!0001! — $34.2B (Lockheed Martin Corporation)
- KC-X Modernization Program — $32.0B (THE Boeing Company)