DoD's $13.6M Auxiliary Support Complex Contract Awarded to Triton Marine Construction Corp
Contract Overview
Contract Amount: $13,629,536 ($13.6M)
Contractor: Triton Marine Construction Corp.
Awarding Agency: Department of Defense
Start Date: 2007-09-29
End Date: 2009-10-16
Contract Duration: 748 days
Daily Burn Rate: $18.2K/day
Competition Type: FULL AND OPEN COMPETITION
Number of Offers Received: 2
Pricing Type: FIRM FIXED PRICE
Sector: Construction
Official Description: MCON P-980, AUXILIARY SUPPORT COMPLEX
Place of Performance
Location: SILVERDALE, KITSAP County, WASHINGTON, 98315
Plain-Language Summary
Department of Defense obligated $13.6 million to TRITON MARINE CONSTRUCTION CORP. for work described as: MCON P-980, AUXILIARY SUPPORT COMPLEX Key points: 1. The contract, valued at $13.6 million, was awarded to Triton Marine Construction Corp. 2. Awarded by the Department of the Navy, this project falls under Industrial Building Construction. 3. The contract utilized full and open competition, suggesting a competitive bidding process. 4. The duration of the contract was 748 days, ending in October 2009.
Value Assessment
Rating: fair
The contract value of $13.6 million for industrial building construction appears within a reasonable range for a project of this scope and duration. Benchmarking against similar DoD construction contracts would provide a more precise assessment.
Cost Per Unit: N/A
Competition Analysis
Competition Level: full-and-open
The use of full and open competition indicates that multiple contractors had the opportunity to bid, which typically drives competitive pricing. The award to Triton Marine Construction Corp. suggests they offered the best value under the established criteria.
Taxpayer Impact: Full and open competition generally leads to better value for taxpayers by ensuring a competitive market and preventing inflated prices.
Public Impact
Supports naval operations by providing necessary auxiliary facilities. The construction project likely created jobs in the Washington state area. Ensures the Department of the Navy has adequate infrastructure for its missions.
Waste & Efficiency Indicators
Waste Risk Score: 50 / 10
Warning Flags
- Potential for cost overruns in fixed-price contracts if unforeseen issues arise.
- Long-term maintenance and operational costs of the new complex are not detailed.
Positive Signals
- Utilized full and open competition, promoting market efficiency.
- Awarded to a single contractor, potentially streamlining project management.
Sector Analysis
This contract falls under the Industrial Building Construction sector, a significant area of spending for the Department of Defense. Benchmarks for similar construction projects vary widely based on location, complexity, and specific requirements.
Small Business Impact
The data does not indicate whether small businesses were involved as subcontractors or partners in this contract. Further analysis would be needed to determine the extent of small business participation.
Oversight & Accountability
The contract was awarded by the Department of the Navy, implying oversight from this agency. The fixed-price nature of the contract provides some cost control, but monitoring for scope creep and adherence to specifications is crucial.
Related Government Programs
- Industrial Building Construction
- Department of Defense Contracting
- Department of the Navy Programs
Risk Flags
- Lack of detailed scope of work for value assessment.
- No information on potential cost overruns or change orders.
- Absence of data on small business participation.
- Limited insight into contractor performance and potential disputes.
Tags
industrial-building-construction, department-of-defense, wa, dca, 10m-plus
Frequently Asked Questions
What is this federal contract paying for?
Department of Defense awarded $13.6 million to TRITON MARINE CONSTRUCTION CORP.. MCON P-980, AUXILIARY SUPPORT COMPLEX
Who is the contractor on this award?
The obligated recipient is TRITON MARINE CONSTRUCTION CORP..
Which agency awarded this contract?
Awarding agency: Department of Defense (Department of the Navy).
What is the total obligated amount?
The obligated amount is $13.6 million.
What is the period of performance?
Start: 2007-09-29. End: 2009-10-16.
What was the specific scope of work for the Auxiliary Support Complex, and how did it align with the awarded price?
The specific scope of work for the Auxiliary Support Complex is not detailed in the provided data. However, the contract was for Industrial Building Construction. Understanding the exact requirements, such as square footage, specialized facilities, and site preparation, is crucial for assessing if the $13.6 million price was appropriate and reflected fair market value for the services rendered.
Were there any performance issues or disputes during the contract's execution, and how were they resolved?
The provided data does not contain information regarding performance issues or disputes during the contract's execution. A thorough review of contract performance reports, payment histories, and any formal communications between the Department of the Navy and Triton Marine Construction Corp. would be necessary to identify and assess any such challenges and their resolutions.
How does the cost per square foot or per unit of this construction project compare to similar facilities built for the DoD or other government agencies?
Without specific details on the size (e.g., square footage) or key functional units of the Auxiliary Support Complex, a direct cost per unit comparison is not possible. To benchmark effectively, one would need to identify comparable construction projects with similar functionalities and geographic locations, then analyze their contract values relative to their physical or functional scale.
Industry Classification
NAICS: Construction › Nonresidential Building Construction › Industrial Building Construction
Product/Service Code: CONSTRUCT OF STRUCTURES/FACILITIES › CONSTRUCTION OF BUILDINGS
Competition & Pricing
Extent Competed: FULL AND OPEN COMPETITION
Solicitation Procedures: TWO STEP
Solicitation ID: N4425507R0005
Offers Received: 2
Pricing Type: FIRM FIXED PRICE (J)
Evaluated Preference: NONE
Contractor Details
Address: 2181 CHICO WAY N.W., BREMERTON, WA, 06
Business Categories: Category Business, Small Business, Special Designations, U.S.-Owned Business
Financial Breakdown
Contract Ceiling: $14,289,938
Exercised Options: $13,629,536
Current Obligation: $13,629,536
Contract Characteristics
Cost or Pricing Data: NO
Timeline
Start Date: 2007-09-29
Current End Date: 2009-10-16
Potential End Date: 2009-10-16 00:00:00
Last Modified: 2011-09-13
More Contracts from Triton Marine Construction Corp.
- Repair to Pier 4 AT Pnbc Annex, Philadelphia PA — $39.3M (Department of Defense)
- Poseidon Wharf Repairs, Notu, Cape Canaveral, FL — $38.2M (Department of Defense)
- , P 308 Commercial Power Connection, Cutler ME — $30.6M (Department of Defense)
- RM09-1948 Strcutural Repairs to Piers 2&15 Navsubase NL, Groton, CT — $26.5M (Department of Defense)
- N40085-11-C-7221 Drydock #1 Concrete and Wall Repairs — $21.1M (Department of Defense)
View all Triton Marine Construction Corp. federal contracts →
Other Department of Defense Contracts
- Federal Contract — $51.3B (Humana Government Business Inc)
- Lrip LOT 12 Advance Acquisition Contract — $35.1B (Lockheed Martin Corporation)
- SSN 802 and 803 Long Lead Time Material — $34.7B (Electric Boat Corporation)
- 200204!008532!1700!AF600 !naval AIR Systems Command !N0001902C3002 !A!N! !N! !20011026!20120430!008016958!008016958!834951691!n!lockheed Martin Corporation !lockheed Blvd !fort Worth !tx!76108!27000!439!48!fort Worth !tarrant !texas !+000026000000!n!n!018981928201!ac15!rdte/Aircraft-Eng/Manuf Develop !a1a!airframes and Spares !2ama!jast/Jsf !336411!E! !3! ! ! ! ! !99990909!B! ! !A! !a!n!r!2!002!n!1a!a!n!z! ! !N!C!N! ! ! !a!a!a!a!000!a!c!n! ! ! !Y! !N00019!0001! — $34.2B (Lockheed Martin Corporation)
- KC-X Modernization Program — $32.0B (THE Boeing Company)