Government Contract Spending in Utah
State Overview
Total Obligated: $11,042,534,736,676
Contract Count: 4251
Top Contractors in Utah
- Northrop Grumman Systems Corporation — $14.7B
- Northrop Grumman Systems Corp — $11.7B
- ATK Launch Systems LLC — $4.2B
- L3 Technologies, Inc. — $2.0B
- EG&G Defense Materials, Inc. — $1.8B
- Balfour Beatty/Dpr/Big-D, a Joint Venture — $1.3B
- THE Boeing Company — $756.9M
- Management & Training Corporation — $686.1M
- Advantaged Solutions, LLC — $660.0M
- North Wind Portage, Inc. — $519.3M
Top Federal Agencies in Utah
- Department of Defense — $30.1B
- National Aeronautics and Space Administration — $8.5B
- General Services Administration — $861.3M
- Department of Energy — $767.3M
- Department of Labor — $562.6M
- Department of Justice — $123.5M
- Department of the Interior — $113.3M
Spending by Sector
- Other: $41.1B
Recent Contracts
- GROUND-BASED STRATEGIC DETERRENT (GBSD) ENGINEERING AND MANUFACTURING DEVELOPMENT (EMD) AND EARLY PRODUCTION AND DEPLOYMENT (P&D) — $11.7B
- 200506!000026!5700!FA8214!OO-ALC/PKME/LMKE !F4261098C0001 !A!N! !Y! !P01502!20041213!20050701!001563738!004179453!016435559!N!NORTHROP GRUMMAN SPACE & MISSI!888 S 2000 E !CLEARFIELD !UT!84015!13850!011!49!CLEARFIELD !DAVIS !UTAH !-000001960000!N!N!000000000000!L014!TECH REP SVCS/GUIDED MISSILES !A2 !MISSILE AND SPACE SYSTEMS !302 !MINUTEMAN III GRP !541330!E! !3! ! !C! ! !20200930!B! ! !A! !A!N!L!2!002!B! !Z!Y!Z! ! !N!C!N! ! ! !A!A!A!A!000!A!C!N! ! ! ! ! ! !0001! ! — $10.0B
- FIRST DDT AND E, ARES I-X, AND FLIGHT TESTS. FIRST STAGE WILL BE A FIVE SEGMENT, SOLID ROCKET BOOSTER DERIVED FROM THE SPACE SHUTTLE PROGRAM (SSP) SOLID ROCKET BOOSTER (SRB)/REUSABLE SOLID ROCKET MOTOR (RSRM). THE CONTRACTOR SHALL FURNISH THE NECESSARY MANAGEMENT, ENGINEERING, LABOR, FACILITIES, TOOLS, EQUIPMENT, AND MATERIALS REQUIRED FOR FIRST STAGE DEVELOPMENT, QUALIFICATION, CERTIFICATION AND ACCEPTANCE PROGRAM. ACTIVITIES INCLUDE: REDESIGN AND TESTING OF THE MOTOR TO INCORPORATE THE FIFTH SEGMENT AND PRODUCTION OF FIVE FULL SCALE GROUND STATIC TEST MOTORS: TWO DEVELOPMENT MOTORS (DMS)-AND THREE QUALIFICATION MOTORS (QMS); STRUCTURAL TEST ARTICLE (STA), GROUND VIBRATION TEST MOTORS (GVTMS) AND OTHER DEVELOPMENT TESTING; REDESIGN OF THE AVIONICS, DECELERATION, SEPARATION, AND FLIGHT TERMINATION SYSTEM (FTS) SUBSYSTEMS; ARES I-X: SIMULATED ARES I OUTER MOLD LINE/MASS PROPERTIES USING MODIFIED SRB/RSRM; AND THREE FLIGHT TEST VEHICLES. TAS::80 0124::TAS — $4.4B
- SPACE SHUTTLE REUSABLE SOLID ROCKET MOTORS — $4.1B
- — $1.8B
- UTAH DATA CENTER, CAMP WILLIAMS, UT — $1.3B
- IGF::CT::IGF THE PURPOSE OF THIS CONTRACT IS TO PROVIDE ENGINEERING SERVICES FOR THE GUIDANCE SYSTEM OF THE MINUTEMAN III MISSILE. — $629.6M
- ERP CLOUD HOSTING — $518.1M
- PURCHASE OF 538 EA E-ROVERS — $401.1M
- — $395.7M
- — $289.6M
- REMEDIATION OF MOAB CLEAN UP SITE IN MOAB, UTAH — $247.9M
- AVIONICS IT BASED SOFTWARE SUPPORT — $246.8M
- IGF::OT::IGF THIS A FIXED PRICE AND FIXED UNIT RATE TASK ORDER WITH A COST REIMBURSABLE CLIN FOR EQUIPMENT AND VEHICLES FOR ENVIRONMENTAL REMEDIATION AT THE DEPARTMENT OF ENERGY'S MOAB SITE IN MOAB, UTAH. THIS TASK ORDER IS BEING ISSUED UNDER THE ENVIRONMENTAL MANAGEMENT NATIONWIDE IDIQ SET ASIDE CONTRACT DEEM0000842 AND IS FOR THE PURPOSE OF OPERATING AND MAINTAINING THE DOE MOAB AND CRESCENT JUNCTION SITES. OPERATING ACTIVITIES INCLUDE: EXCAVATING RESIDUAL RADIOACTIVE MATERIAL AT THE MOAB SITE AND TRANSPORTING THE RRM VIA RAIL TO THE DOE CRESCENT JUNCTION SITE FOR PLACEMENT, COMPACTION AND DISPOSAL. THIS TASK ORDER IS ALSO FOR THE PURPOSE OF CONTINUOUS PLACEMENT OF INTERIM COVER, EXCAVATION AND CONSTRUCTION OF THE PHASE 3 DISPOSAL CELL AT THE DOE CRESCENT JUNCTION SITE, AND THE REMEDIATION OF THE FINAL VICINITY PROPERTY. — $210.2M
- IGF::OT::IGF - OPTION YEARS 3 AND 4 FOR AVIONICS GST0810BP0059 001 — $188.9M
- AWARD OF TASK ORDER 0006 FOR COMMON DATA LINK SATELLITE COMMUNICATIONS SUPPORT SERVICES. — $185.2M
- MIDS JTRS TERMINAL PRODUCTION — $182.2M
- CMC DESIGN PHASE SERVICES AND CONSTRUCTION OF U.S. DISTRICT COURTHOUSE SALT LAKE CITY, UT. — $180.9M
- BASE TASK ORDER AWARD FOR THE DLA ERP SAP MIGRATION — $178.2M
- SCOPE OF TASK ORDER 89303323FEM400390 INCLUDES COMPLETION OF THE MILL TAILINGS PILE REMEDIATION AT A RATE OF SPEED REFLECTING ESTABLISHED PRODUCTION CAPACITY UNDER SAFE WORKING CONDITIONS. — $171.1M