Government Contract Spending in Colorado
State Overview
Total Obligated: $35,701,692,331,278
Contract Count: 21789
Top Contractors in Colorado
- Lockheed Martin Corp — $30.1B
- United Launch Services, LLC — $21.2B
- Alliance for Energy Innovation, LLC — $10.6B
- Raytheon Company — $6.7B
- Bechtel National, Inc. — $5.4B
- Kaiser-Hill Company, LLC — $4.2B
- L3harris Technologies, Inc. — $4.0B
- Vectrus Systems LLC — $3.8B
- Lockheed Martin Commercial Launch Services, Inc. — $3.3B
- Lockheed Martin Corporation — $3.2B
Top Federal Agencies in Colorado
- Department of Defense — $65.3B
- National Aeronautics and Space Administration — $17.5B
- Department of Energy — $16.6B
- Department of Commerce — $2.2B
- Department of Veterans Affairs — $1.3B
- Office of Personnel Management — $622.2M
Spending by Sector
- Other: $103.5B
Recent Contracts
- TAS::80 0124::TAS DESIGN, DEVELOPMENT, TEST&EVALUATION OF PROJECT ORION — $15.5B
- AWARD OF CONTRACT TO MANAGE AND OPERATE THE NATIONAL RENEWABLE ENERGY LABORATORY — $10.6B
- IGF::CT::IGF EELV FY13 + PHASE I BUY — $9.5B
- RESTRUCTURED CONTRACT TO FACILITATE A CONTRACTUAL VEHICLE FOR THE LIFE OF THE DAAA09-02-D-0025 CONTRACT FROM SYSTEMIZATION THROUGH CLOSURE. THIS IS SEEN AS AN ADMINISTRATIVE CHANGE TO DAAA09-02-D-0025 — $4.5B
- GPS ADVANCED CONTROL SEGMENT (OCX) PHASE B BLOCKS 1 AND 2 — $4.5B
- ROCKY FLATS CLOSURE CONTRACT — $4.2B
- GLOBAL POSITIONING SYSTEMS III FOLLOW-ON — $4.0B
- IR CPS WS DEVELOPMENT AND INTEGRATION — $3.9B
- 200610!000002!5700!FA8816!SMC/EVK !FA881606C0002 !A!N! !N! ! !20060228!20070930!926784042!834951691!834951691!N!LOCKHEED MARTIN CORPORATION !12257 HIGHWAY 121 !LITTLETON !CO!80125!45255!005!08!LITTLETON !ARAPAHOE !COLORADO !+000335912412!N!N!000815040082!1810!SPACE VEHICLES !A2 !MISSILE AND SPACE SYSTEMS !176 !EELV !336414!E! !3! ! ! ! ! !99990909!B! ! !A! !D!N!R!1!001!N!1G!Z!Y!Z! ! !N!C!N! ! ! !A!A!A!A!000!A!C!Y! ! ! !Y! ! !0001! ! — $3.6B
- SURVIVABLE AIRBORNE OPERATIONS CENTER (SAOC) — $2.6B
- 199707!5700!0051!GZ74 !SMC/PKV2 !F0470196C0001 !A!*!P00051 !19970401!20030930!080372998!080372998!834951691!N!04236!LOCKHEED MARTIN CORPORATION !12999 W DEER CREEK CANYON !LITTLETON !CO!80127!20000!031!08!DENVER !DENVER !COLORADO !0001!+000000998348!N!N!000000000000!AC25!RDTE/MISSILE AND SPACE SYSTEMS-ENG/MANUF DEVEL !A2 !MISSILE AND SPACE SYSTEMS !3CPA!TITAN IV LAUNCH VEH PROGRAM !3671!3!*!*!*!B!A!*!C !N!R!1!001!N!1A!A!Y!Z!* !* !N!C!*!A!A!A!A!A!*!* !*!N!A!C!N!*!*!*!*!*! — $2.4B
- 200204!000024!5700!GV59 !ESC/NDK !F1962802C0010 !A!N! !N! !20020130!20020930!052819732!052819732!001216845!N!ITT INDUSTRIES, INC , SYSTEMS !4410 E FOUNTAIN BLVD !COLORADO SPRIN !CO!80916!16000!041!08!COLORADO SPRINGS !EL PASO !COLORADO !+000003175920!N!N!000519009204!J099!MAINT & REPAIR OF EQ/MISCELLANEOUS EQUIPMENT !A7 !ELECTRONICS AND COMMUNICATION !3GWQ!474L BMEWS !541512!E! !3! ! ! ! ! !99990909!B! ! !B! !A!N!R!2!002!B! !Z!N!Z! ! !N!C!N! ! ! !A!A!A!A!000!A!D!N! ! ! ! ! ! !0001! — $2.2B
- — $2.1B
- THE GOVERNMENT IS PROCURING THE NEXT-GENERATION GEOSTATIONARY OPERATIONAL ENVIRONMENTAL SATELLITES (GOES) SERIES TO CONTINUE ITS MISSION THROUGH NEW REQUIREMENTS SPECIFIED IN THE GOES-R LEVEL I REQUIREMENTS DOCUMENT AND MISSION REQUIREMENTS DOCUMENT (MRD). THE FIRST SATELLITE OF THIS NEW SERIES, DESIGNATED AS GOES-R, WILL PROVIDE THE FIRST MAJOR IMPROVEMENT IN INSTRUMENT TECHNOLOGY SINCE GOES-I LAUNCHED IN 1994. THE GOES-R SERIES WILL INTRODUCE OTHER NEW TECHNOLOGIES IN BOTH THE SPACE AND GROUND SEGMENTS. THESE ADVANCES WILL IMPROVE THE NATION'S ABILITY TO MONITOR AND FORECAST WEATHER AND ENVIRONMENTAL PHENOMENA WITH A SIGNIFICANT INCREASE IN THE NUMBER OF PRODUCTS. ONE OF NOAA'S PRINCIPAL MISSIONS IS TO PROVIDE FORECASTS AND WARNINGS FOR THE UNITED STATES, ITS TERRITORIES, ADJACENT WATERS AND OCEAN AREA FOR THE PROTECTION OF LIFE AND PROPERTY AND ENHANCEMENT OF THE NATIONAL ECONOMY. THIS MISSION REQUIRES THE CAPABILITY TO ACQUIRE, PROCESS, AND DISSEMINATE ENVIRONMENTAL DATA ON AN EXTENSIVE SPATIAL RANGE (GLOBAL, REGIONAL AND LOCAL) ON A VARIETY OF TIME SCALES. THESE DATA INCLUDE, BUT ARE NOT LIMITED TO: GLOBAL IMAGERY; CLOUD AND PRECIPITATION PARAMETERS; ATMOSPHERIC PROFILES OF TEMPERATURE, MOISTURE, WINDS, AEROSOLS, AND OZONE; SURFACE CONDITIONS CONCERNING ICE, SNOW AND VEGETATION; OCEAN PARAMETERS AND SEA-SURFACE TEMPERATURE; AND SOLAR AND IN-SITU SPACE ENVIRONMENT CONDITIONS. THE STATEMENT OF WORK (SOW) DEFINES THOSE TASKS TO DESIGN, ANALYZE, VALIDATE, DEVELOP, FABRICATE, ASSEMBLE, INTEGRATE, TEST, VERIFY, EVALUATE, DELIVER GOES-R SERIES SATELLITES AND SUPPORT LAUNCH AND POST LAUNCH, SUPPLY AND MAINTAIN THE GROUND SUPPORT EQUIPMENT (GSE), AND SUPPORT THE NOAA SATELLITE OPERATIONS CONTROL CENTER (SOCC). THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, FACILITIES, AND OTHER RESOURCES TO DESIGN, VALIDATE, FABRICATE, ASSEMBLE, INTEGRATE, TEST, VERIFY, AND DELIVER GOES-R SERIES SATELLITES AND PROVIDE PRE-LAUNCH, LAUNCH, AND POST-LAUNCH SUPPORT AND TRAINING UNDER THE BASIC CONTRACT, AND OPTIONS WHEN EXERCISED BY THE GOVERNMENT. — $2.0B
- RESERVED — $2.0B
- AWARD OF MRI CONTRACT — $1.8B
- DELTA IV HEAVY LAUNCH SERVICES — $1.7B
- ENGINEERING SERVICES AND DEVELOPMENT LEADING TO THE DELIVERY OF THE JPSS COMMON GROUND SYSTEM INSTRUMENT AND SUPPORT. — $1.6B
- LETTER CONTRACT FOR MUOS-2, WGS-6, NROL-65 — $1.4B
- BUY 3 BOEING LAUNCH SERVICES — $1.3B