Neumann Brothers, Inc. Contracts in Iowa
Federal contract operations by Neumann Brothers, Inc. performed in Iowa (IA)
Overview
Total Contract Value: $87,219,652
Contract Count: 3
Average Contract Size: $29.1M
Sole Source Rate: 0%
Small Business Rate: 0%
Awarding Agencies
- Department of Defense — $59.0M (2 contracts)
- General Services Administration — $28.3M (1 contracts)
Spending by Sector
- Other: $87.2M (3 contracts)
Contracts
- DESIGN-BUILD AFRC — $33.7M
- RECOVERY: BUILDING #IA0112ZZ, NEAL SMITH FEDERAL BUILDING ARRA PROJECT (PROJECT #IIA00013), 210 WALNUT STREET, DES MOINES, IA. CONTRACT AWARD - WORK TO BE DELIVERED UNDER THIS TASK ORDER INCLUDES, BUT IS NOT LIMITED TO THE FOLLOWING: CHANGE OUT EXISTING ELECTRICAL AND MECHANICAL SYSTEMS TO UPGRADE PERFORMANCE OF ELECTRICAL AND HVAC SYSTEMS. AS OPTIONS, THE FOLLOWING ITEMS WILL BE INCLUDED IN THE SCOPE OF WORK: A. OPTION NO. 1 - CONSTRUCTION PHASE SERVICES: OPTION #1: A) ARRA REQUIRED PROJECTS-PROVIDE AND INSTALL ADVANCED METERING ON GAS AND WATER BUILDING SERVICE ENTRANCES; AND UPGRADES TO THE EXISTING ENERGY MANAGEMENT CONTROL SYSTEM (EMCS); B) ENERGY CONSERVATION MEASURES-PROVIDE AND INSTALL ENERGY SAVING LAMPS; OFFICE LIGHTING AND SWITCHING REVISIONS; DAYLIGHTING ENHANCEMENTS; PUBLIC AREA TIME OF DAY CONTROLS; COOLING TOWER SEWER ABATEMENT; BOILER AUTOMATIC BLOWDOWN; TIME OF DAY CONTROLS FOR EXISTING AIR HANDLING UNITS AND EXHAUST FANS; RESET DUAL DUCT MIXING BOX STATIC PRESSURE SENSORS; CHILLER CONTROL OPTIMIZATION; REPLACE EXISTING AIR HANDLING UNITS (ONE FOR ONE). B. OPTION #2: REMOVE BUILDING'S EXISTING PERIMETER INDUCTION UNITS. PROVIDE AND INSTALL A NEW PERIMETER RADIANT HEAT SYSTEM, INCLUDING A NEW VENTILATION AIR SYSTEM. C. OPTION #3: REMOVE BUILDING'S EXISTING ELECTRICAL POWER TRANSFORMERS. PROVIDE AND INSTALL NEW HIGHER EFFICIENCY TRANSFORMERS. D. OPTION #4: PROVIDE AND INSTALL NEW MOTORIZED AND CONTROLLED WINDOW BLIND SYSTEM AND NEW HIGHLY REFLECTIVE CEILING SYSTEM. E. OPTION #5: REMODEL THE EXISTING RESTROOMS ON FLOORS 2 THROUGH 10. PROVIDE AND INSTALL NEW EFFICIENT PLUMBING AND ELECTRICAL FIXTURES, INCLUDING UPGRADES ON FINISHES AND ADA COMPLIANCE. F. OPTION #6: REMODEL THE EXISTING RESTROOMS ON THE FIRST FLOOR. PROVIDE AND INSTALL NEW EFFICIENT PLUMBING AND ELECTRICAL FIXTURES, INCLUDING UPGRADES ON FINISHES AND ADA COMPLIANCE. LOCATION OF THE RESTROOMS MAY CHANGE. G. OPTION #7: REMODEL THE EXISTING KITCHEN. PROVIDE AND INSTALL NEW EFFICIENT FOOD SERVICE EQUIPMENT, HVAC UPGRADES, PLUMBING AND ELECTRICAL FIXTURES, INCLUDING NEW FINISHES. H. OPTION #8: REMOVE THE EXISTING TWO-CELL COOLING TOWER. PROVIDE AND INSTALL A NEW FOUR-CELL COOLING TOW. — $28.3M
- MIDDLETOWN AFRC - BRAC — $25.2M
Frequently Asked Questions
How many contracts does Neumann Brothers, Inc. have in Iowa?
Neumann Brothers, Inc. has 3 contracts performed in Iowa worth a combined $87.2M.
What is the average contract size for Neumann Brothers, Inc. in Iowa?
The average contract size is $29.1M.