Gilbane Federal Contracts with Department of Defense
Relationship Overview
Total Contract Value: $2,970,242,356
Contract Count: 57
Average Contract Size: $52.1M
Sole Source Rate: 0%
Small Business Rate: 0%
Spending by Sector
- Other: $3.0B (57 contracts)
Contracts
- IGF::OT::IGF "SOFA" TO CONSTRUCT USFK OPS CTR&PHASE III FACILITY, USAG-HUMPHREY, SCIF PORTION — $198.7M
- REPAIR OF RUNWAY FACILITIES 6666/667 OFUTT AFB NE — $170.1M
- IGF::OT::IGF F15 FLEET MODERNIZATION, KING KHALID AB, SAUDI ARABIA — $168.6M
- THE CONTRACTOR MUST CONSTRUCT A NEW MULTI-BAY AIRCRAFT HANGAR OF APPROXIMATELY 130,000 SQUARE FEET, SITED OVER THE CURRENT FOOTPRINT OF BUILDINGS 1043, 1042, 1004, AND 104 AT BEALE AIR FORCE BASE. — $142.8M
- TACMOR UTILITIES AND INFRASTRUCTURE — $119.3M
- MIGRATED DATA VALUE UNKNOWN — $107.3M
- PN 88724 SCI TRAINING, RESEARCH&NETWORK CENTER, FORT GORDON, GEORGIA — $99.4M
- IGF:CL: IGF FFP/SATOC SAUDI ARABIA DESIGN-BUILD FACILITIES-KING ABDULAZIZ AB-DHAHRAN — $98.9M
- THE CONTRACTOR SHALL PERFORM CONSTRUCTION EFFORTS IN ACCORDANCE WITH THE TERMS AND CONDITIONS OF THE BASIC WEC CONTRACT AND THE SOW FOR THE STC AND CONTROLLED ASSETS STORAGE PROJECT AT KING ABDULAZIZ AIR BASE, KINGDOM OF SAUDI ARABIA. — $98.1M
- IGF::OT::IGF RENOVATION OF BUILDING 7000 FOR THE JSPOC CONSOLIDATION AT VANDENBERG AFB, CA. FOR PROJECT: XUMU131054B1 — $82.5M
- CONSTRUCTION AFGHAN NATIONAL DETENTION FACILITY EXPANSION POL-E-CHARKI AFGHANISTAN — $71.9M
- CONSTRUCTION OF PHASE II NAVY IGLOOS MUNITIONS STORAGE AREAS AT KING SAUD AIR BASE (KSAB), AL JOUF AIR BASE (AJAB), KING FAHAD AIR BASE (KFDAB) AND PRINCE SULTAN AIR BASE (PSAB), KINGDOM OF SAUDI ARABIA. — $70.5M
- IGF::OT::IGF STANDOFF WEAPONS ECM STORAGE AT PSAB AND KKAB PROJECT NUMBERS: PSAB-16-0001, KKAB-16-00 — $70.1M
- CONTRACT W912GB-14-C-0018 PROJECT DESCRIPTION AND LOCATION CAN NOT BE INCLUDED DUE TO SECURITY CLASSIFICATION OF THE PROJECT. — $63.6M
- P407 LITTORAL INNOVATION AND PROTOTYPING FACILITY — $60.7M
- PHASE I NAVAL IGLOOS AT KING ABDULAZIZ AIR BASE AND KING FAISAL AIR BASE, F-15 MODERNIZATION PROGRAM ROYAL SAUDI AIR FORCE — $60.7M
- MEC REMOVAL AND REMEDIATION, FT ORD, CA ON BORROWED CONTRACT FROM HUNTSVILLE CALLED THE WERS. ITSI CAN NO LONGER BE REPORTED AS A SMALL BUSINESS. — $59.8M
- IGF::OT::IGF CONSTRUCTION OF AFGHANISTAN MINISTRY OF DEFENSE COMPLEX IN KABUL, AFGHANISTAN — $59.0M
- REPAIR AIRFIELD APRONS, TAXIWAY K, AND TAXIWAY M ON KING SALMON AIR STATION. — $53.9M
- CONSTRUCTION, SHAIBAN LOGISTICS BASE, IRAQ — $51.0M
Frequently Asked Questions
How many contracts does Gilbane Federal have with Department of Defense?
Gilbane Federal has 57 contracts with Department of Defense worth a combined $3.0B.
What is the average contract size between Gilbane Federal and Department of Defense?
The average contract size is $52.1M.
What percentage of Gilbane Federal's contracts with Department of Defense are sole-source?
0% of the contracts are sole-source awards.