Cherry Hill Construction Inc Contracts with Department of Transportation
Relationship Overview
Total Contract Value: $289,037,211
Contract Count: 3
Average Contract Size: $96.3M
Sole Source Rate: 0%
Small Business Rate: 0%
Spending by Sector
- Other: $289.0M (3 contracts)
Contracts
- IGF::OT::IGF THE I-564 INTERMODAL CONNECTOR LIMITS ARE LOCATED FROM EXISTING INTERSTATE 564 IN THE AREA OF TERMINAL BLVD ON THE EAST TO THE NAVAL STATION NORFOLK (SECOND STREET)AND NORFOLK INTERNATIONAL TERMINALS ON THE WEST, REPRESENTING APPROXIMATELY 2.82 MILES OF NEW FOUR-LANE LIMITED ACCESS HIGHWAY, AND A RECONFIGURED COMMERCIAL VEHICLE INSPECTION STATION FOR NAVAL STATION NORFOLK. PROPOSED IMPROVEMENTS INCLUDE, BUT ARE NOT LIMITED TO, CONSTRUCTION OF I-564 INTERCHANGE, BRIDGES AND LOCAL CONNECTORS, STORMWATER MANAGEMENT AREAS AND OTHER INFRASTRUCTURE ASSOCIATED WITH THE I-564 INTERMODAL CONNECTOR. IN ADDITION, THE PROJECT INCLUDES IMPROVEMENTS ON NAVAL STATION NORFOLK, NAVAL SUPPORT ACTIVITY HAMPTON ROADS AND NORFOLK INTERNATIONAL TERMINALS. ADJUSTMENTS AND TIE-INS WILL ALSO BE REQUIRED AT THE INTERFACE WITH NORFOLK INTERNATIONAL TERMINALS AND NORFOLK SOUTHERN RAILROAD. COE: TIM BROWN — $119.0M
- DESIGN/BUILD A ROAD FROM US ROUTE 1 ON THE SOUTHERN TERMINUS AND STATE ROUTE 7. — $111.5M
- DESIGN-BUILD 9TH STREET BRIDGE IN DC — $58.5M
Frequently Asked Questions
How many contracts does Cherry Hill Construction Inc have with Department of Transportation?
Cherry Hill Construction Inc has 3 contracts with Department of Transportation worth a combined $289.0M.
What is the average contract size between Cherry Hill Construction Inc and Department of Transportation?
The average contract size is $96.3M.
What percentage of Cherry Hill Construction Inc's contracts with Department of Transportation are sole-source?
0% of the contracts are sole-source awards.