I-564 Intermodal Connector Project Awarded for $119M, Enhancing Naval Access and Infrastructure
Contract Overview
Contract Amount: $119,029,701 ($119.0M)
Contractor: Cherry Hill Construction Inc
Awarding Agency: Department of Transportation
Start Date: 2014-02-10
End Date: 2023-12-31
Contract Duration: 3,611 days
Daily Burn Rate: $33.0K/day
Competition Type: FULL AND OPEN COMPETITION
Number of Offers Received: 8
Pricing Type: FIRM FIXED PRICE
Sector: Transportation
Official Description: IGF::OT::IGF THE I-564 INTERMODAL CONNECTOR LIMITS ARE LOCATED FROM EXISTING INTERSTATE 564 IN THE AREA OF TERMINAL BLVD ON THE EAST TO THE NAVAL STATION NORFOLK (SECOND STREET)AND NORFOLK INTERNATIONAL TERMINALS ON THE WEST, REPRESENTING APPROXIMATELY 2.82 MILES OF NEW FOUR-LANE LIMITED ACCESS HIGHWAY, AND A RECONFIGURED COMMERCIAL VEHICLE INSPECTION STATION FOR NAVAL STATION NORFOLK. PROPOSED IMPROVEMENTS INCLUDE, BUT ARE NOT LIMITED TO, CONSTRUCTION OF I-564 INTERCHANGE, BRIDGES AND LOCAL CONNECTORS, STORMWATER MANAGEMENT AREAS AND OTHER INFRASTRUCTURE ASSOCIATED WITH THE I-564 INTERMODAL CONNECTOR. IN ADDITION, THE PROJECT INCLUDES IMPROVEMENTS ON NAVAL STATION NORFOLK, NAVAL SUPPORT ACTIVITY HAMPTON ROADS AND NORFOLK INTERNATIONAL TERMINALS. ADJUSTMENTS AND TIE-INS WILL ALSO BE REQUIRED AT THE INTERFACE WITH NORFOLK INTERNATIONAL TERMINALS AND NORFOLK SOUTHERN RAILROAD. COE: TIM BROWN
Place of Performance
Location: NORFOLK, NORFOLK CITY County, VIRGINIA, 23502
State: Virginia Government Spending
Plain-Language Summary
Department of Transportation obligated $119.0 million to CHERRY HILL CONSTRUCTION INC for work described as: IGF::OT::IGF THE I-564 INTERMODAL CONNECTOR LIMITS ARE LOCATED FROM EXISTING INTERSTATE 564 IN THE AREA OF TERMINAL BLVD ON THE EAST TO THE NAVAL STATION NORFOLK (SECOND STREET)AND NORFOLK INTERNATIONAL TERMINALS ON THE WEST, REPRESENTING APPROXIMATELY 2.82 MILES OF NEW FOUR-LANE… Key points: 1. The project aims to improve access to Naval Station Norfolk and Norfolk International Terminals, a critical military and commercial hub. 2. Awarded under full and open competition, suggesting a competitive bidding process for the $119M contract. 3. The contract duration is extensive (over 3600 days), indicating a complex, multi-year infrastructure development. 4. The project involves significant construction, including new highway, bridges, and reconfigured inspection stations, impacting regional transportation.
Value Assessment
Rating: fair
The contract value of $119M for 2.82 miles of limited-access highway and associated infrastructure appears within a reasonable range for major transportation projects. However, without specific cost breakdowns for bridges, interchanges, and stormwater management, a precise benchmark is difficult.
Cost Per Unit: N/A
Competition Analysis
Competition Level: full-and-open
The contract was awarded through full and open competition, which typically fosters competitive pricing and allows for a wide range of contractors to bid. This method is expected to lead to a more efficient price discovery process.
Taxpayer Impact: The investment in critical infrastructure is intended to improve logistical efficiency for naval operations and commercial traffic, potentially leading to long-term economic benefits and cost savings for the government and region.
Public Impact
Improved transportation links for military personnel and equipment to Naval Station Norfolk. Enhanced efficiency for commercial vehicles accessing Norfolk International Terminals, boosting regional trade. Potential for job creation in the construction sector within the Hampton Roads area. Modernized infrastructure may reduce traffic congestion and improve safety on surrounding roadways.
Waste & Efficiency Indicators
Waste Risk Score: 50 / 10
Warning Flags
- Long contract duration increases risk of cost overruns and schedule delays.
- Complexity of integrating new infrastructure with existing naval facilities requires careful coordination.
- Potential for unforeseen environmental or geological challenges during construction.
Positive Signals
- Full and open competition likely secured a competitive price.
- Project addresses critical infrastructure needs for national security and regional economy.
- Firm Fixed Price contract provides cost certainty for the government.
Sector Analysis
This project falls within the Highway, Street, and Bridge Construction sector, a significant area of federal spending. Benchmarks for similar large-scale transportation infrastructure projects vary widely based on scope, location, and complexity, but $119M for 2.82 miles of limited-access highway with extensive associated work is substantial.
Small Business Impact
While the primary contractor is Cherry Hill Construction Inc., the contract details do not specify any subcontracting goals or participation by small businesses. Further investigation would be needed to determine the extent of small business involvement.
Oversight & Accountability
The Federal Highway Administration, under the Department of Transportation, is responsible for overseeing this contract. The extensive duration and scope suggest a need for robust oversight to ensure adherence to timelines, budget, and quality standards.
Related Government Programs
- Highway, Street, and Bridge Construction
- Department of Transportation Contracting
- Federal Highway Administration Programs
Risk Flags
- Extensive project duration (over 9 years).
- Significant scope involving multiple infrastructure components.
- Potential for coordination challenges with naval base operations.
- Reliance on a single definitive contract for a large sum.
Tags
highway-street-and-bridge-construction, department-of-transportation, va, definitive-contract, 100m-plus
Frequently Asked Questions
What is this federal contract paying for?
Department of Transportation awarded $119.0 million to CHERRY HILL CONSTRUCTION INC. IGF::OT::IGF THE I-564 INTERMODAL CONNECTOR LIMITS ARE LOCATED FROM EXISTING INTERSTATE 564 IN THE AREA OF TERMINAL BLVD ON THE EAST TO THE NAVAL STATION NORFOLK (SECOND STREET)AND NORFOLK INTERNATIONAL TERMINALS ON THE WEST, REPRESENTING APPROXIMATELY 2.82 MILES OF NEW FOUR-LANE LIMITED ACCESS HIGHWAY, AND A RECONFIGURED COMMERCIAL VEHICLE INSPECTION STATION FOR NAVAL STATION NORFOLK. PROPOSED IMPROVEMENTS INCLUDE, BUT ARE NOT LIMITED TO, CONSTRUCTION OF I-564 INTERCHANGE, BRIDGES AND LOCAL CON
Who is the contractor on this award?
The obligated recipient is CHERRY HILL CONSTRUCTION INC.
Which agency awarded this contract?
Awarding agency: Department of Transportation (Federal Highway Administration).
What is the total obligated amount?
The obligated amount is $119.0 million.
What is the period of performance?
Start: 2014-02-10. End: 2023-12-31.
What is the projected economic impact of the I-564 Intermodal Connector on regional trade and military logistics?
The project is expected to significantly enhance the efficiency of military logistics by providing direct access to Naval Station Norfolk and Norfolk International Terminals. For regional trade, improved connectivity for commercial vehicles is anticipated to reduce transit times and costs, potentially boosting economic activity and competitiveness in the Hampton Roads area.
What are the primary risks associated with the long duration and complexity of this highway construction project?
The primary risks include potential cost escalations due to inflation over the extended period, unforeseen site conditions (e.g., soil, environmental), and potential delays caused by weather, material availability, or coordination issues with multiple stakeholders. Managing these risks requires proactive planning, contingency budgeting, and strong project management.
How effectively does the firm-fixed-price contract mitigate cost uncertainty for this large infrastructure project?
A firm-fixed-price contract is highly effective in mitigating cost uncertainty for the government, as it locks in the price regardless of contractor cost overruns. However, it places the risk of cost overruns on the contractor, which can incentivize them to be highly efficient or potentially lead to disputes if unforeseen issues arise.
Industry Classification
NAICS: Construction › Highway, Street, and Bridge Construction › Highway, Street, and Bridge Construction
Product/Service Code: CONSTRUCT OF STRUCTURES/FACILITIES › CONSTRUCTION OF BUILDINGS
Competition & Pricing
Extent Competed: FULL AND OPEN COMPETITION
Solicitation Procedures: TWO STEP
Solicitation ID: DTFH7113R00015
Offers Received: 8
Pricing Type: FIRM FIXED PRICE (J)
Evaluated Preference: NONE
Contractor Details
Parent Company: Tutor Perini Corporation
Address: 8211 WASHINGTON BLVD, JESSUP, MD, 20794
Business Categories: Category Business, Corporate Entity Not Tax Exempt, Not Designated a Small Business, Special Designations, U.S.-Owned Business
Financial Breakdown
Contract Ceiling: $119,029,701
Exercised Options: $119,029,701
Current Obligation: $119,029,701
Actual Outlays: $16,013,769
Contract Characteristics
Commercial Item: COMMERCIAL PRODUCTS/SERVICES PROCEDURES NOT USED
Cost or Pricing Data: NO
Timeline
Start Date: 2014-02-10
Current End Date: 2023-12-31
Potential End Date: 2025-11-16 00:00:00
Last Modified: 2023-04-27
More Contracts from Cherry Hill Construction Inc
- Design/Build a Road From US Route 1 on the Southern Terminus and State Route 7 — $111.5M (Department of Transportation)
- Design-Build 9TH Street Bridge in DC — $58.5M (Department of Transportation)
Other Department of Transportation Contracts
- Dafis UDO Reconstruct W/O Advance — $3.8B (Lockheed Martin Services, LLC)
- THE Purpose of This Delivery Order Award IS to ADD Funding for FTI Telecommunications Services — $1.9B (Harris Corporation)
- Provide Funding for Clin 302 for Pre-Flight and In-Flight Services. Contract Number Dtfawa-05-C-00031, Lockheed Martin. POP 01/16/08-03/31/08 — $1.9B (Leidos, Inc.)
- Center for Advanced Aviation Development (caasd) Ffrdc Mitre — $1.7B (THE Mitre Corporation)
- Dafis UDO Reconstruct W/O Advance — $1.5B (Harris Corporation)