DoD Awards $14.6M for DDG-51 Class Integrated Bridge Controls to Green Expert Technology Inc
Contract Overview
Contract Amount: $14,601,391 ($14.6M)
Contractor: Green Expert Technology Inc
Awarding Agency: Department of Defense
Start Date: 2024-05-24
End Date: 2026-11-21
Contract Duration: 911 days
Daily Burn Rate: $16.0K/day
Competition Type: FULL AND OPEN COMPETITION
Number of Offers Received: 1
Pricing Type: COST PLUS FIXED FEE
Sector: Defense
Official Description: INTEGRATED BRIDGE CONTROLS (IBC): DDG-51 CLASS
Place of Performance
Location: PHILADELPHIA, PHILADELPHIA County, PENNSYLVANIA, 19112
Plain-Language Summary
Department of Defense obligated $14.6 million to GREEN EXPERT TECHNOLOGY INC for work described as: INTEGRATED BRIDGE CONTROLS (IBC): DDG-51 CLASS Key points: 1. Contract awarded to Green Expert Technology Inc. for Integrated Bridge Controls on DDG-51 class vessels. 2. The contract falls under Engineering Services (NAICS 541330). 3. Awarded via Full and Open Competition, indicating a competitive bidding process. 4. The contract type is Cost Plus Fixed Fee, which can lead to cost overruns if not managed carefully.
Value Assessment
Rating: fair
The Cost Plus Fixed Fee contract type allows for flexibility but carries inherent risk of cost escalation. Benchmarking against similar engineering service contracts for naval systems is necessary to assess value.
Cost Per Unit: N/A
Competition Analysis
Competition Level: full-and-open
The contract was awarded through full and open competition, suggesting a robust price discovery process. However, the Cost Plus Fixed Fee structure requires diligent oversight to ensure fair pricing.
Taxpayer Impact: Taxpayer funds are utilized for engineering services on naval vessels. The competitive award aims for efficiency, but the contract type necessitates careful monitoring to prevent excessive costs.
Public Impact
Enhances operational capabilities of the DDG-51 class destroyers. Supports the U.S. Navy's fleet readiness and modernization efforts. Potential for follow-on work or similar contracts for other naval platforms.
Waste & Efficiency Indicators
Waste Risk Score: 50 / 10
Warning Flags
- Cost Plus Fixed Fee contract type increases risk of cost overruns.
- Limited information on specific performance metrics or deliverables.
- Potential for scope creep in engineering services contracts.
Positive Signals
- Awarded through full and open competition.
- Supports critical naval defense systems.
- Long-term contract duration allows for project continuity.
Sector Analysis
This contract falls within the Defense sector, specifically for engineering services related to naval vessels. Spending benchmarks for similar complex engineering projects on military platforms are typically high due to specialized requirements and stringent quality standards.
Small Business Impact
The awardee, Green Expert Technology Inc., is not explicitly identified as a small business. Analysis is needed to determine if small business participation was encouraged or achieved through subcontracting.
Oversight & Accountability
The Department of the Navy is responsible for oversight. The Cost Plus Fixed Fee structure requires rigorous financial and performance monitoring to ensure accountability and prevent waste.
Related Government Programs
- Engineering Services
- Department of Defense Contracting
- Department of the Navy Programs
Risk Flags
- Cost Plus Fixed Fee contract type.
- Potential for cost overruns.
- Limited visibility into specific performance metrics.
- Engineering services can be prone to scope creep.
- No explicit mention of small business subcontracting goals.
Tags
engineering-services, department-of-defense, pa, delivery-order, 10m-plus
Frequently Asked Questions
What is this federal contract paying for?
Department of Defense awarded $14.6 million to GREEN EXPERT TECHNOLOGY INC. INTEGRATED BRIDGE CONTROLS (IBC): DDG-51 CLASS
Who is the contractor on this award?
The obligated recipient is GREEN EXPERT TECHNOLOGY INC.
Which agency awarded this contract?
Awarding agency: Department of Defense (Department of the Navy).
What is the total obligated amount?
The obligated amount is $14.6 million.
What is the period of performance?
Start: 2024-05-24. End: 2026-11-21.
What is the estimated total cost if the fixed fee is applied to the base contract value, and how does this compare to similar projects?
The contract is Cost Plus Fixed Fee, meaning the government pays the actual costs plus a predetermined fixed fee. Without knowing the fixed fee percentage or the actual costs incurred, a precise total cost is unknown. Benchmarking against similar DDG-51 class upgrades or naval engineering services contracts is crucial to assess if the projected costs are reasonable and competitive.
What are the specific risks associated with the Cost Plus Fixed Fee structure for this Integrated Bridge Controls project?
The primary risk with Cost Plus Fixed Fee is that the contractor has less incentive to control costs since their fee is fixed regardless of the final cost. This can lead to cost overruns if the government does not maintain strict oversight of expenditures and project scope. Scope creep is also a significant risk, where additional requirements are added without corresponding adjustments to the fee or schedule.
How will the effectiveness of the Integrated Bridge Controls be measured and ensured throughout the contract lifecycle?
Effectiveness will likely be measured through a combination of technical performance metrics, successful integration testing, operational readiness evaluations, and user feedback from the Navy crew. The contract should define clear acceptance criteria and milestones. Regular progress reviews and adherence to stringent quality assurance protocols by the Department of the Navy are essential to ensure the delivered system meets performance and reliability standards.
Industry Classification
NAICS: Professional, Scientific, and Technical Services › Architectural, Engineering, and Related Services › Engineering Services
Product/Service Code: SUPPORT SVCS (PROF, ADMIN, MGMT) › PROFESSIONAL SERVICES
Competition & Pricing
Extent Competed: FULL AND OPEN COMPETITION
Solicitation Procedures: SUBJECT TO MULTIPLE AWARD FAIR OPPORTUNITY
Solicitation ID: N6449824R3012
Offers Received: 1
Pricing Type: COST PLUS FIXED FEE (U)
Evaluated Preference: NONE
Contractor Details
Address: 30 WASHINGTON AVE, HADDONFIELD, NJ, 08033
Business Categories: Category Business, Corporate Entity Not Tax Exempt, Small Business, Special Designations, Subchapter S Corporation, U.S.-Owned Business
Financial Breakdown
Contract Ceiling: $67,669,637
Exercised Options: $26,267,103
Current Obligation: $14,601,391
Actual Outlays: $69,664
Contract Characteristics
Commercial Item: COMMERCIAL PRODUCTS/SERVICES PROCEDURES NOT USED
Cost or Pricing Data: NO
Parent Contract
Parent Award PIID: N0017819D7732
IDV Type: IDC
Timeline
Start Date: 2024-05-24
Current End Date: 2026-11-21
Potential End Date: 2029-05-23 00:00:00
Last Modified: 2025-12-30
More Contracts from Green Expert Technology Inc
- This Amendment Serves to Create Slins Under Clins 2200,2400,2600,2800,3200,3400,3600,3800 in Order for Offerors to Input Their Proposed Costs for Option Years — $27.3M (Department of Defense)
- Condition Assessment, Fleet Support and Sustainment — $12.7M (Department of Defense)
- Code 41 Engineering Services Award — $2.0M (Department of Defense)
Other Department of Defense Contracts
- Federal Contract — $51.3B (Humana Government Business Inc)
- Lrip LOT 12 Advance Acquisition Contract — $35.1B (Lockheed Martin Corporation)
- SSN 802 and 803 Long Lead Time Material — $34.7B (Electric Boat Corporation)
- 200204!008532!1700!AF600 !naval AIR Systems Command !N0001902C3002 !A!N! !N! !20011026!20120430!008016958!008016958!834951691!n!lockheed Martin Corporation !lockheed Blvd !fort Worth !tx!76108!27000!439!48!fort Worth !tarrant !texas !+000026000000!n!n!018981928201!ac15!rdte/Aircraft-Eng/Manuf Develop !a1a!airframes and Spares !2ama!jast/Jsf !336411!E! !3! ! ! ! ! !99990909!B! ! !A! !a!n!r!2!002!n!1a!a!n!z! ! !N!C!N! ! ! !a!a!a!a!000!a!c!n! ! ! !Y! !N00019!0001! — $34.2B (Lockheed Martin Corporation)
- KC-X Modernization Program — $32.0B (THE Boeing Company)