DoD Awards $24.9M for 120-Ton Bridge Crane to Advanced Crane Technologies LLC
Contract Overview
Contract Amount: $24,909,886 ($24.9M)
Contractor: Advanced Crane Technologies LLC
Awarding Agency: Department of Defense
Start Date: 2023-12-30
End Date: 2026-09-19
Contract Duration: 994 days
Daily Burn Rate: $25.1K/day
Competition Type: FULL AND OPEN COMPETITION AFTER EXCLUSION OF SOURCES
Number of Offers Received: 2
Pricing Type: FIRM FIXED PRICE
Sector: Other
Official Description: 120 TON BRIDGE CRANE
Place of Performance
Location: POTTSTOWN, MONTGOMERY County, PENNSYLVANIA, 19464
Plain-Language Summary
Department of Defense obligated $24.9 million to ADVANCED CRANE TECHNOLOGIES LLC for work described as: 120 TON BRIDGE CRANE Key points: 1. Contract awarded to Advanced Crane Technologies LLC for a 120-ton bridge crane. 2. The contract falls under the Overhead Traveling Crane, Hoist, and Monorail System Manufacturing industry. 3. Competition was full and open after exclusion of sources, suggesting a specific reason for source exclusion. 4. The contract type is a definitive contract with a firm fixed price. 5. The total value is $24,909,886, with a duration of 994 days.
Value Assessment
Rating: fair
The contract value of $24.9 million for a 120-ton bridge crane appears to be within a reasonable range for specialized industrial equipment. Benchmarking against similar large-scale crane procurements would be necessary for a definitive assessment.
Cost Per Unit: N/A
Competition Analysis
Competition Level: full-and-open
The contract was awarded under 'Full and Open Competition After Exclusion of Sources.' This indicates that while the competition was initially open, certain sources were excluded, potentially due to specific technical requirements or prior performance issues. The pricing mechanism is firm fixed price, which shifts risk to the contractor.
Taxpayer Impact: The firm fixed price contract aims to control costs, but the exclusion of sources could limit competitive pressure, potentially impacting the final price paid by taxpayers.
Public Impact
Ensures critical infrastructure for naval operations with a high-capacity bridge crane. Supports manufacturing and maintenance capabilities within the Department of the Navy. The procurement process aims for a balance between competition and specialized needs. Potential for long-term operational benefits through reliable equipment.
Waste & Efficiency Indicators
Waste Risk Score: 50 / 10
Warning Flags
- Exclusion of sources in a full and open competition warrants further investigation.
- Lack of specific details on the crane's application and performance requirements.
- Firm fixed price contracts can sometimes lead to higher initial costs if not carefully scoped.
Positive Signals
- Clear contract type (firm fixed price) and award value.
- Defined delivery timeline and contract duration.
- Awarded to a company specializing in crane manufacturing.
Sector Analysis
The procurement falls within the industrial machinery manufacturing sector, specifically for overhead traveling cranes and hoists. Spending in this sector is often driven by defense, infrastructure, and heavy industry needs. Benchmarks for similar large-capacity crane systems can vary significantly based on customization and technical specifications.
Small Business Impact
The data indicates that small businesses were not directly involved in this specific prime contract award. Further analysis would be needed to determine if small businesses are participating as subcontractors.
Oversight & Accountability
The contract is a definitive contract, suggesting it is a formal agreement with defined terms. Oversight will focus on adherence to the firm fixed price, delivery schedule, and technical specifications to ensure accountability and value for taxpayer funds.
Related Government Programs
- Overhead Traveling Crane, Hoist, and Monorail System Manufacturing
- Department of Defense Contracting
- Department of the Navy Programs
Risk Flags
- Potential for limited competition due to source exclusion.
- High contract value requires careful monitoring.
- Dependence on a single contractor for a critical piece of equipment.
- Lack of transparency regarding specific technical requirements driving the procurement.
Tags
overhead-traveling-crane-hoist-and-monor, department-of-defense, pa, definitive-contract, 10m-plus
Frequently Asked Questions
What is this federal contract paying for?
Department of Defense awarded $24.9 million to ADVANCED CRANE TECHNOLOGIES LLC. 120 TON BRIDGE CRANE
Who is the contractor on this award?
The obligated recipient is ADVANCED CRANE TECHNOLOGIES LLC.
Which agency awarded this contract?
Awarding agency: Department of Defense (Department of the Navy).
What is the total obligated amount?
The obligated amount is $24.9 million.
What is the period of performance?
Start: 2023-12-30. End: 2026-09-19.
What were the specific reasons for excluding certain sources in the 'Full and Open Competition After Exclusion of Sources' process, and how did this impact the final price?
The exclusion of sources typically occurs when specific technical capabilities, past performance, or unique requirements are necessary, and only a limited number of vendors can meet them. While this can sometimes reduce competition, it ensures the government procures equipment that precisely meets its needs. The impact on price depends on the remaining competition and the negotiation process. A thorough review of the source selection documentation would clarify the rationale and its pricing implications.
How does the $24.9 million cost for this 120-ton bridge crane compare to industry benchmarks for similar specialized equipment, considering its intended military application?
Benchmarking this $24.9 million contract requires detailed comparison with similar large-capacity bridge cranes procured for industrial or defense applications. Factors like lifting capacity, span, duty cycle, environmental resilience, and specific naval integration requirements significantly influence cost. Without these specifics, a direct comparison is difficult, but the price appears substantial, necessitating validation against specialized industry pricing data for comparable systems.
What are the key performance metrics and oversight mechanisms in place to ensure the effectiveness and longevity of this bridge crane for the Department of the Navy?
Effectiveness and longevity are typically ensured through stringent technical specifications, quality assurance provisions, and acceptance testing outlined in the contract. Oversight mechanisms would include regular progress reviews, site inspections, and performance monitoring against defined metrics. The firm fixed price structure incentivizes the contractor to deliver a compliant product, while the government's quality assurance team verifies adherence to standards throughout the manufacturing and delivery process.
Industry Classification
NAICS: Manufacturing › Other General Purpose Machinery Manufacturing › Overhead Traveling Crane, Hoist, and Monorail System Manufacturing
Product/Service Code: MATERIALS HANDLING EQPT
Competition & Pricing
Extent Competed: FULL AND OPEN COMPETITION AFTER EXCLUSION OF SOURCES
Solicitation Procedures: NEGOTIATED PROPOSAL/QUOTE
Solicitation ID: N6247020R1001
Offers Received: 2
Pricing Type: FIRM FIXED PRICE (J)
Evaluated Preference: NONE
Contractor Details
Address: 300 OLD READING PIKE, STOWE, PA, 19464
Business Categories: Category Business, Limited Liability Corporation, Manufacturer of Goods, Partnership or Limited Liability Partnership, Small Business, Special Designations, U.S.-Owned Business
Financial Breakdown
Contract Ceiling: $24,909,886
Exercised Options: $24,909,886
Current Obligation: $24,909,886
Contract Characteristics
Commercial Item: COMMERCIAL PRODUCTS/SERVICES PROCEDURES NOT USED
Cost or Pricing Data: NO
Timeline
Start Date: 2023-12-30
Current End Date: 2026-09-19
Potential End Date: 2026-09-19 00:00:00
Last Modified: 2025-10-06
Other Department of Defense Contracts
- Federal Contract — $51.3B (Humana Government Business Inc)
- Lrip LOT 12 Advance Acquisition Contract — $35.1B (Lockheed Martin Corporation)
- SSN 802 and 803 Long Lead Time Material — $34.7B (Electric Boat Corporation)
- 200204!008532!1700!AF600 !naval AIR Systems Command !N0001902C3002 !A!N! !N! !20011026!20120430!008016958!008016958!834951691!n!lockheed Martin Corporation !lockheed Blvd !fort Worth !tx!76108!27000!439!48!fort Worth !tarrant !texas !+000026000000!n!n!018981928201!ac15!rdte/Aircraft-Eng/Manuf Develop !a1a!airframes and Spares !2ama!jast/Jsf !336411!E! !3! ! ! ! ! !99990909!B! ! !A! !a!n!r!2!002!n!1a!a!n!z! ! !N!C!N! ! ! !a!a!a!a!000!a!c!n! ! ! !Y! !N00019!0001! — $34.2B (Lockheed Martin Corporation)
- KC-X Modernization Program — $32.0B (THE Boeing Company)