NASA Awards $26M for Long Lead Parts Storage to Calnetix Technologies LLC
Contract Overview
Contract Amount: $25,968 ($26.0K)
Contractor: Calnetix Technologies LLC
Awarding Agency: National Aeronautics and Space Administration
Start Date: 2025-11-25
End Date: 2026-04-30
Contract Duration: 156 days
Daily Burn Rate: $166/day
Competition Type: NOT COMPETED UNDER SAP
Pricing Type: FIRM FIXED PRICE
Sector: Other
Official Description: LONG LEAD PARTS STORAGE
Place of Performance
Location: CERRITOS, LOS ANGELES County, CALIFORNIA, 90703
Plain-Language Summary
National Aeronautics and Space Administration obligated $25,967.93 to CALNETIX TECHNOLOGIES LLC for work described as: LONG LEAD PARTS STORAGE Key points: 1. Contract awarded for long lead parts storage, a critical component for future projects. 2. Calnetix Technologies LLC, a specialist in motor and generator manufacturing, is the sole awardee. 3. The contract value is $25,967,930, with a performance period extending into April 2026. 4. This award falls under the Motor and Generator Manufacturing sector, indicating specialized needs.
Value Assessment
Rating: fair
The contract value of $25.97 million for long lead parts storage appears reasonable given the specialized nature of the components and the extended delivery timeline. Benchmarking against similar storage contracts is difficult without more specific details on the items stored and their criticality.
Cost Per Unit: N/A
Competition Analysis
Competition Level: sole-source
The contract was not competed under Simplified Acquisition Procedures (SAP) and is listed as 'NOT COMPETED UNDER SAP'. This suggests a sole-source or limited competition approach, potentially due to the specialized nature of the parts or the vendor's unique capabilities. The lack of broad competition may limit price discovery.
Taxpayer Impact: Without competitive bidding, taxpayers may not be receiving the lowest possible price for this storage service. The justification for sole-source procurement needs to be robust to ensure value for money.
Public Impact
Ensures availability of critical components for future NASA missions, potentially preventing delays. Supports the specialized manufacturing sector, particularly in motor and generator production. The long duration of the contract (156 days) suggests significant storage requirements.
Waste & Efficiency Indicators
Waste Risk Score: 50 / 10
Warning Flags
- Sole-source award limits competition and potential cost savings.
- Lack of detailed justification for sole-source procurement.
- Potential for overpayment due to limited price discovery.
Positive Signals
- Ensures availability of critical long-lead parts.
- Supports specialized manufacturing capabilities.
- Long-term storage solution for NASA's needs.
Sector Analysis
This contract falls within the Motor and Generator Manufacturing sector, specifically for the storage of long lead parts. Spending in this area is often driven by the complex and lengthy production cycles of advanced aerospace components, requiring specialized storage solutions to maintain part integrity and availability.
Small Business Impact
There is no indication that small businesses were involved in this contract, either as prime contractors or subcontractors. The award to Calnetix Technologies LLC, a specific entity, suggests a focus on specialized capabilities rather than broad set-aside opportunities.
Oversight & Accountability
The contract's sole-source nature warrants close oversight to ensure the pricing is fair and reasonable and that the storage services meet NASA's stringent requirements. Accountability for the proper management and security of these long lead parts is crucial.
Related Government Programs
- Motor and Generator Manufacturing
- National Aeronautics and Space Administration Contracting
- National Aeronautics and Space Administration Programs
Risk Flags
- Sole-source award
- Lack of competition
- Potential for inflated pricing
- Limited transparency on specific parts stored
Tags
motor-and-generator-manufacturing, national-aeronautics-and-space-administr, ca, delivery-order, under-100k
Frequently Asked Questions
What is this federal contract paying for?
National Aeronautics and Space Administration awarded $25,967.93 to CALNETIX TECHNOLOGIES LLC. LONG LEAD PARTS STORAGE
Who is the contractor on this award?
The obligated recipient is CALNETIX TECHNOLOGIES LLC.
Which agency awarded this contract?
Awarding agency: National Aeronautics and Space Administration (National Aeronautics and Space Administration).
What is the total obligated amount?
The obligated amount is $25,967.93.
What is the period of performance?
Start: 2025-11-25. End: 2026-04-30.
What specific long lead parts are being stored, and what is their criticality to upcoming NASA missions?
The specific long lead parts are not detailed in the provided data. However, their classification as 'long lead' implies they have extended manufacturing times and are essential for the assembly or operation of complex systems, such as spacecraft propulsion, power generation, or scientific instruments. Their criticality is likely high, as delays in their procurement or manufacturing could significantly impact mission timelines and budgets.
What is the justification for awarding this contract on a sole-source basis, and how was the price determined to be fair and reasonable?
The justification for a sole-source award typically stems from unique capabilities, proprietary technology, or the need for compatibility with existing systems. Without further details, it's presumed Calnetix Technologies LLC possesses specialized expertise or facilities required for storing these specific long lead parts. The determination of a fair and reasonable price would likely involve cost analysis, comparison to historical data (if available), and negotiation based on the vendor's proposed costs and profit margins.
What are the risks associated with storing these long lead parts, and what mitigation strategies are in place?
Risks include degradation of parts due to improper storage conditions, obsolescence, loss or damage, and security breaches. Mitigation strategies would involve stringent environmental controls (temperature, humidity), regular inspections, secure storage facilities, and robust inventory management systems. NASA's oversight would ensure Calnetix Technologies LLC adheres to all contractual requirements for maintaining the integrity and security of the stored components.
Industry Classification
NAICS: Manufacturing › Electrical Equipment Manufacturing › Motor and Generator Manufacturing
Product/Service Code: RESEARCH AND DEVELOPMENT › Space R&D Services
Competition & Pricing
Extent Competed: NOT COMPETED UNDER SAP
Solicitation Procedures: SIMPLIFIED ACQUISITION
Pricing Type: FIRM FIXED PRICE (J)
Evaluated Preference: NONE
Contractor Details
Parent Company: Calnetix, Inc.
Address: 16323 SHOEMAKER AVE, CERRITOS, CA, 90703
Business Categories: Category Business, Limited Liability Corporation, Partnership or Limited Liability Partnership, Small Business, Special Designations, U.S.-Owned Business
Financial Breakdown
Contract Ceiling: $25,968
Exercised Options: $25,968
Current Obligation: $25,968
Actual Outlays: $19,941
Contract Characteristics
Commercial Item: COMMERCIAL PRODUCTS/SERVICES
Cost or Pricing Data: NO
Parent Contract
Parent Award PIID: 80JSC021D0009
IDV Type: IDC
Timeline
Start Date: 2025-11-25
Current End Date: 2026-04-30
Potential End Date: 2026-04-30 00:00:00
Last Modified: 2026-04-01
More Contracts from Calnetix Technologies LLC
- Clin 0001 Services for Contract Year (CY) 5 Extended Quarter 1 — $38.1K (National Aeronautics and Space Administration)
Other National Aeronautics and Space Administration Contracts
- International Space Station — $22.4B (THE Boeing Company)
- TAS::80 0124::TAS Design, Development, Test&evaluation of Project Orion — $15.5B (Lockheed Martin Corp)
- Provide Developmental Hardware and Test Articles, and Manufacture and Assemble Ares I Upper Stages. the Upper Stage (US) Element IS an Integral Part of the Ares I Launch Vehicle and Provides the Second Stage of Flight. the US Element IS Responsible for the Roll Control During the First Stage Burn and Separation; and Will Provide the Guidance and Navigation, Command and Data Handling, and Other Avionics Functions for the Ares I During ALL Phases of the Ascent Flight. the US Element IS a NEW Design That Emphasizes Safety, Operability, and Minimum Life Cycle Cost. the Overall Design, Development, Test and Evaluation (ddt&e), Production, and Sustaining Engineering Efforts Include Activities Performed by Three Organizations; the Nasa Design Team (NDT), the Upper Stage Production Contractor (uspc) and the Instrument Unit Production Contractor (iupc). for Clarity, the Uspc Will BE Referred to AS the Contractor Throughout This Document. Nasa IS Responsible for the Integration of the Primary Elements of the Ares I Launch Vehicle Including: the First Stage, US Including Instrument Unit (IU), and US Engine; and Will Also Integrate the Ares I Launch Vehicle AT the Launch Site. Nasa IS Responsible for the Ddt&e, Including Technical and Programmatic Integration of the US Subsystems and Government-Furnished Property. Nasa Will Lead the Effort to Develop the Requirements and Specifications of the US Element, the Development Plan and Testing Requirements, and ALL Design Documentation, Initial Manufacturing and Assembly Process Planning, Logistics Planning, and Operations Support Planning. Development, Qualification, and Acceptance Testing Will BE Conducted by Nasa and the Contractor to Satisfy Requirements and for Risk Mitigation. Nasa IS Responsible for the Overall Upper Stage Verification and Validation Process and Will Require Support From the Contractor. the Contractor IS Responsible for the Manufacture and Assembly of the Upper Stage Test Flight and Operational Upper Stage Units Including the Installation of Upper Stage Instrument Unit, the Government-Furnished US Engine, Booster Separation Motors, and Other Government-Furnished Property. a Description of the Nasa Managed and Performed Efforts IS Contained in the US Work Packages and Will BE Made Available to the Contractor to Ensure Their Understanding of the Roles and Responsibilities of the NDT, Iupc, and Contractor During the Design, Development, and Operation of the US Element. the US Conceptual Design Described in the Uso-Clv-Se-25704 US Design Definition Document (DDD) IS the Baseline Design for This Contract. the Contractors Early Role Will BE to Provide Producibility Engineering Support to Nasa VIA the Established US Office Structure and to Provide Inputs Into the Final Design Configuration, Specifications, and Standards. Nasa Will Transition the Manufacturing and Assembly, Logistics Support Infrastructure, Configuration Management, and the Sustaining Engineering Functions to the Contractor AT the KEY Points During the Development and Implementation of the Program Currently Planned to Occur NO Later Than 90 Days After the Completion of the Following Major Milestones: Manufacturing and Assembly US Preliminary Design Review (PDR) Logistics Support Infrastructure US PDR Configuration Management US Critical Design Review CDR) Sustaining Engineering US Design Certification Review (DCR) After the Completion of an Orderly Transition of Roles and Responsibilities to the Contractor, Nasa Will Assume an Insight Role Into the Contractors Production, Sustaining Engineering, and Operations Support of the Ares I US Test Program and Flight Hardware. After DCR, the Contractor Will BE Responsible for Sustaining Engineering PER SOW Section 4.7, AS Necessary to Maintain and Support the US Configuration and for Production and Operations Support — $10.5B (THE Boeing Company)
- Space Program Operations Contract (spoc) — $8.5B (United Space Alliance, LLC)
- Joint Us/Russian Human Space Flight Activities — $4.7B (Russia Space Agency)
View all National Aeronautics and Space Administration contracts →