NASA Awards $3.4M Contract for Center-Wide Electrical System Repairs to Anna Lisa Luna Construction
Contract Overview
Contract Amount: $3,409,312 ($3.4M)
Contractor: Anna Lisa Luna Construction, Inc.
Awarding Agency: National Aeronautics and Space Administration
Start Date: 2025-06-04
End Date: 2026-07-15
Contract Duration: 406 days
Daily Burn Rate: $8.4K/day
Competition Type: FULL AND OPEN COMPETITION AFTER EXCLUSION OF SOURCES
Number of Offers Received: 2
Pricing Type: FIRM FIXED PRICE
Sector: Construction
Official Description: REPAIR OF CENTER WIDE ELECTRICAL SYSTEMS
Place of Performance
Location: EDWARDS, KERN County, CALIFORNIA, 93523
Plain-Language Summary
National Aeronautics and Space Administration obligated $3.4 million to ANNA LISA LUNA CONSTRUCTION, INC. for work described as: REPAIR OF CENTER WIDE ELECTRICAL SYSTEMS Key points: 1. The contract value of $3.4 million is for essential infrastructure repair. 2. Competition was full and open after exclusion of sources, suggesting a competitive process. 3. The firm fixed price contract type helps mitigate cost overrun risks. 4. The sector is Commercial and Institutional Building Construction, a critical area for facility maintenance.
Value Assessment
Rating: good
The contract value of $3.4 million appears reasonable for comprehensive electrical system repairs across a facility. Benchmarking against similar large-scale building maintenance contracts would provide further validation.
Cost Per Unit: N/A
Competition Analysis
Competition Level: full-and-open
The contract was awarded under full and open competition after exclusion of sources. This method generally promotes competitive pricing and ensures the government receives the best value.
Taxpayer Impact: Taxpayer funds are being used for essential infrastructure maintenance, ensuring operational continuity and safety.
Public Impact
Ensures continued operation of critical NASA facilities. Supports infrastructure resilience and safety for personnel. Invests in the long-term viability of research and development capabilities.
Waste & Efficiency Indicators
Waste Risk Score: 50 / 10
Warning Flags
- Potential for unforeseen issues during repair of aging electrical systems.
- Dependence on a single contractor for critical repairs.
Positive Signals
- Firm fixed price contract limits cost uncertainty.
- Full and open competition generally leads to better pricing.
- Essential infrastructure maintenance ensures operational continuity.
Sector Analysis
This contract falls within the Commercial and Institutional Building Construction sector, focusing on essential facility maintenance. Spending in this area is crucial for maintaining government operational capabilities and infrastructure integrity.
Small Business Impact
The awardee, Anna Lisa Luna Construction, Inc., is not indicated as a small business. Further analysis would be needed to determine if small business participation was sought or achieved through subcontracting.
Oversight & Accountability
The contract is managed by the National Aeronautics and Space Administration (NASA), which has established oversight mechanisms for procurement and project execution. Monitoring progress and adherence to specifications will be key.
Related Government Programs
- Commercial and Institutional Building Construction
- National Aeronautics and Space Administration Contracting
- National Aeronautics and Space Administration Programs
Risk Flags
- Potential for unforeseen conditions in aging infrastructure.
- Contract duration extends over a year, requiring sustained oversight.
- Reliance on a single entity for critical system repairs.
Tags
commercial-and-institutional-building-co, national-aeronautics-and-space-administr, ca, delivery-order, 1m-plus
Frequently Asked Questions
What is this federal contract paying for?
National Aeronautics and Space Administration awarded $3.4 million to ANNA LISA LUNA CONSTRUCTION, INC.. REPAIR OF CENTER WIDE ELECTRICAL SYSTEMS
Who is the contractor on this award?
The obligated recipient is ANNA LISA LUNA CONSTRUCTION, INC..
Which agency awarded this contract?
Awarding agency: National Aeronautics and Space Administration (National Aeronautics and Space Administration).
What is the total obligated amount?
The obligated amount is $3.4 million.
What is the period of performance?
Start: 2025-06-04. End: 2026-07-15.
What is the historical performance record of Anna Lisa Luna Construction, Inc. on similar government contracts?
A review of Anna Lisa Luna Construction, Inc.'s past performance on similar government contracts is crucial. This includes examining their track record for on-time completion, adherence to budget, quality of work, and any past disputes or contract modifications. Positive historical performance would increase confidence in their ability to successfully execute this project.
Are there any specific environmental or safety risks associated with repairing aging electrical systems in a NASA facility?
Repairing aging electrical systems can present risks such as potential asbestos or lead paint disturbance, hazardous material handling, and electrical shock hazards. NASA's protocols likely include stringent safety measures, environmental assessments, and specialized training for workers to mitigate these risks effectively during the repair process.
How will the effectiveness of the electrical system repairs be measured and verified post-completion?
Effectiveness will be measured through rigorous testing and commissioning of the repaired systems, including load testing, fault simulation, and performance monitoring against baseline data. Independent verification by NASA engineers and potentially third-party inspectors will ensure the repairs meet all technical specifications and enhance system reliability and safety.
Industry Classification
NAICS: Construction › Nonresidential Building Construction › Commercial and Institutional Building Construction
Product/Service Code: MAINT, REPAIR, ALTER REAL PROPERTY › MAINT, ALTER, REPAIR NONBUILDINGS
Competition & Pricing
Extent Competed: FULL AND OPEN COMPETITION AFTER EXCLUSION OF SOURCES
Solicitation Procedures: SUBJECT TO MULTIPLE AWARD FAIR OPPORTUNITY
Solicitation ID: 80AFRC25B0009
Offers Received: 2
Pricing Type: FIRM FIXED PRICE (J)
Evaluated Preference: NONE
Contractor Details
Address: 1250 CRUZERO ST, OJAI, CA, 93023
Business Categories: 8(a) Program Participant, Category Business, Corporate Entity Not Tax Exempt, Economically Disadvantaged Women Owned Small Business, Minority Owned Business, Other Minority Owned Business, Self-Certified Small Disadvantaged Business, Small Business, Special Designations, U.S.-Owned Business, Woman Owned Business, Women Owned Small Business
Financial Breakdown
Contract Ceiling: $3,409,312
Exercised Options: $3,409,312
Current Obligation: $3,409,312
Contract Characteristics
Commercial Item: COMMERCIAL PRODUCTS/SERVICES PROCEDURES NOT USED
Cost or Pricing Data: NO
Parent Contract
Parent Award PIID: 80AFRC19D0016
IDV Type: IDC
Timeline
Start Date: 2025-06-04
Current End Date: 2026-07-15
Potential End Date: 2026-07-15 00:00:00
Last Modified: 2026-03-31
More Contracts from Anna Lisa Luna Construction, Inc.
- Construct Munitions Igloos B672 and B734 - 183511 — $11.0M (Department of Defense)
View all Anna Lisa Luna Construction, Inc. federal contracts →
Other National Aeronautics and Space Administration Contracts
- International Space Station — $22.4B (THE Boeing Company)
- TAS::80 0124::TAS Design, Development, Test&evaluation of Project Orion — $15.5B (Lockheed Martin Corp)
- Provide Developmental Hardware and Test Articles, and Manufacture and Assemble Ares I Upper Stages. the Upper Stage (US) Element IS an Integral Part of the Ares I Launch Vehicle and Provides the Second Stage of Flight. the US Element IS Responsible for the Roll Control During the First Stage Burn and Separation; and Will Provide the Guidance and Navigation, Command and Data Handling, and Other Avionics Functions for the Ares I During ALL Phases of the Ascent Flight. the US Element IS a NEW Design That Emphasizes Safety, Operability, and Minimum Life Cycle Cost. the Overall Design, Development, Test and Evaluation (ddt&e), Production, and Sustaining Engineering Efforts Include Activities Performed by Three Organizations; the Nasa Design Team (NDT), the Upper Stage Production Contractor (uspc) and the Instrument Unit Production Contractor (iupc). for Clarity, the Uspc Will BE Referred to AS the Contractor Throughout This Document. Nasa IS Responsible for the Integration of the Primary Elements of the Ares I Launch Vehicle Including: the First Stage, US Including Instrument Unit (IU), and US Engine; and Will Also Integrate the Ares I Launch Vehicle AT the Launch Site. Nasa IS Responsible for the Ddt&e, Including Technical and Programmatic Integration of the US Subsystems and Government-Furnished Property. Nasa Will Lead the Effort to Develop the Requirements and Specifications of the US Element, the Development Plan and Testing Requirements, and ALL Design Documentation, Initial Manufacturing and Assembly Process Planning, Logistics Planning, and Operations Support Planning. Development, Qualification, and Acceptance Testing Will BE Conducted by Nasa and the Contractor to Satisfy Requirements and for Risk Mitigation. Nasa IS Responsible for the Overall Upper Stage Verification and Validation Process and Will Require Support From the Contractor. the Contractor IS Responsible for the Manufacture and Assembly of the Upper Stage Test Flight and Operational Upper Stage Units Including the Installation of Upper Stage Instrument Unit, the Government-Furnished US Engine, Booster Separation Motors, and Other Government-Furnished Property. a Description of the Nasa Managed and Performed Efforts IS Contained in the US Work Packages and Will BE Made Available to the Contractor to Ensure Their Understanding of the Roles and Responsibilities of the NDT, Iupc, and Contractor During the Design, Development, and Operation of the US Element. the US Conceptual Design Described in the Uso-Clv-Se-25704 US Design Definition Document (DDD) IS the Baseline Design for This Contract. the Contractors Early Role Will BE to Provide Producibility Engineering Support to Nasa VIA the Established US Office Structure and to Provide Inputs Into the Final Design Configuration, Specifications, and Standards. Nasa Will Transition the Manufacturing and Assembly, Logistics Support Infrastructure, Configuration Management, and the Sustaining Engineering Functions to the Contractor AT the KEY Points During the Development and Implementation of the Program Currently Planned to Occur NO Later Than 90 Days After the Completion of the Following Major Milestones: Manufacturing and Assembly US Preliminary Design Review (PDR) Logistics Support Infrastructure US PDR Configuration Management US Critical Design Review CDR) Sustaining Engineering US Design Certification Review (DCR) After the Completion of an Orderly Transition of Roles and Responsibilities to the Contractor, Nasa Will Assume an Insight Role Into the Contractors Production, Sustaining Engineering, and Operations Support of the Ares I US Test Program and Flight Hardware. After DCR, the Contractor Will BE Responsible for Sustaining Engineering PER SOW Section 4.7, AS Necessary to Maintain and Support the US Configuration and for Production and Operations Support — $10.5B (THE Boeing Company)
- Space Program Operations Contract (spoc) — $8.5B (United Space Alliance, LLC)
- Joint Us/Russian Human Space Flight Activities — $4.7B (Russia Space Agency)
View all National Aeronautics and Space Administration contracts →