University of California, LOS Angeles Contracts with National Aeronautics and Space Administration
Relationship Overview
Total Contract Value: $73,515,071
Contract Count: 3
Average Contract Size: $24.5M
Sole Source Rate: 0%
Small Business Rate: 0%
Spending by Sector
- Other: $73.5M (3 contracts)
Contracts
- DIVINER LUNAR RADIOMETER EXPERIMENT (DLRE), UNIVERSITY OF CALIFORNIA-LOS ANGELES (UCLA) SEGMENT, PHASE D/E EFFORT UNDER THE LRO PROJECT — $32.1M
- TAS::80 0120::TAS DAWN DISCOVERY MISSION PHASE C/D THE FOLLOWING TASKS SHALL BE PERFORMED BY THE PRINCIPAL INVESTIGATOR AT THE UNIVERSITY OF CALIFORNIA, LOS ANGELES FOR THE DAWN PROJECT PHASE C/D. BASED ON THE PHASE B EFFORTS, THE UNIVERSITY OF CALIFORNIA, LOS ANGELES WILL CONTINUE TO PROVIDE SUPPORT TO THE DAWN PI, IN HIS PERFORMANCE OF THE FOLLOWING TASKS DURING THE DESIGN, DEVELOPMENT, FABRICATION, ASSEMBLY, INTEGRATION, TEST AND LAUNCH PHASE OF THE DAWN MISSION IMPLEMENTATION, INCLUDING: 1. PROVIDE CONTINUING OVERALL LEADERSHIP, MANAGEMENT, AND OVERSIGHT OF THE DAWN PROJECT. 2. CONTINUE TO CHAIR THE DAWN SCIENCE TEAM. 3. UPDATE, AS NECESSARY, THE SCIENCE MANAGEMENT PLAN, AND OVERSEE ALL PLANNING, SOFTWARE DEVELOPMENT, AND PROCUREMENT ACTIVITIES REQUIRED TO PREPARE THE MISSION OPERATIONS CENTER (MOC), SCIENCE DATA CENTER, AND SCIENCE OPERATIONS CENTER (SOC) TO SUPPORT MISSION OPERATIONS, SCIENCE DATA RETRIEVAL AND VALIDATION, AND DELIVERY OF VALIDATED DATA TO PUBLIC AREAS. 4. SUPPORT MISSION PLANNING ACTIVITIES IN PREPARATION FOR LAUNCH. 5. OVERSEE DAWN E/PO ACTIVITIES AND PARTICIPATE IN REGULAR MEETINGS OF THE DAWN E/PO PARTNERS. 6. LEAD THE INVESTIGATION IMPLEMENTATION TASKS. 7. DEVELOP THE DAWN SCIENCE DATA ANALYSIS AND ARCHIVE PLAN. 8. LEAD THE PREPARATION OF A PLAN FOR THE PUBLICATION OF DAWN SCIENTIFIC RESULTS IN REFERRED JOURNALS. 9. LEAD THE PREPARATION OF A PLAN FOR THE TIMELY DISSEMINATION OF DAWN DATA AND SCIENTIFIC FINDINGS. 10. WITHIN THE FIRST 30 DAYS AFTER LAUNCH, OVERSEE INITIAL ENGINEERING AND SCIENCE CHECKOUT AND VERIFICATION OF SPACECRAFT IN FLIGHT OPERATION INCLUDING ACTIVATION AND CHECKOUT OF THE PAYLOAD. 11. PROVIDE MANAGEMENT AND OVERSIGHT OF SUBCONTRACTS TO CO-INVESTIGATOR AND EDUCATION/PUBLIC OUTREACH TEAM MEMBER INSTITUTION FOR THEIR PARTICIPATION IN DAWN PROJECT. 12. CONTINUE DAILY MANAGEMENT AND ADMINISTRATION OF PHASE C/D IMPLEMENTATION ACTIVITIES. MONTHLY STATUS REPORTING ON ALL ASPECTS OF SCIENCE AND IMPLEMENTATION SHALL BE PERFORMED AND SUBMITTED TO THE DISCOVERY PROGRAM MANAGER ON TECHNICAL, SCHEDULE, AND FISCAL PROGRESS. PREPARATION AND PLANNING FOR PHASE E ACTIVITIES SHALL BE PERFORMED IN ACCORDANCE WITH THE PROJECT MASTER SCHEDULE, SUBCONTRACTING PLANS AND DOCUMENTATION, RISK ASSESSMENT LIST, AND DETAILED TASK DESCRIPTIONS AND COST ESTIMATED FOR PHASE E CONTRACTING. — $25.4M
- THE GOAL OF NEO SURVEYOR IS TO FIND, TRACK, AND CHARACTERIZE THE ASTEROIDS AND COMETS THAT COULD POTENTIALLY THREATEN THE EARTH. — $16.1M
Frequently Asked Questions
How many contracts does University of California, LOS Angeles have with National Aeronautics and Space Administration?
University of California, LOS Angeles has 3 contracts with National Aeronautics and Space Administration worth a combined $73.5M.
What is the average contract size between University of California, LOS Angeles and National Aeronautics and Space Administration?
The average contract size is $24.5M.
What percentage of University of California, LOS Angeles's contracts with National Aeronautics and Space Administration are sole-source?
0% of the contracts are sole-source awards.