Ross Group Construction Corporation, LLC Contracts in Arkansas
Federal contract operations by Ross Group Construction Corporation, LLC performed in Arkansas (AR)
Overview
Total Contract Value: $57,642,867
Contract Count: 2
Average Contract Size: $28.8M
Sole Source Rate: 0%
Small Business Rate: 0%
Awarding Agencies
- Department of Defense — $57.6M (2 contracts)
Spending by Sector
- Other: $57.6M (2 contracts)
Contracts
- DESIGN BUILD FOR A C-130 H/J FUSELAGE TRAINER FACILITY AT THE LITTLE ROCK AIR FORCE BASE — $36.1M
- IGF::OT::IGF C-130J FUELS SYSTEMS MAINTENANCE HANGAR AT LRAFB, AR. DESIGN AND CONSTRUCT A TWO-BAY FUELS MAINTENANCE HANGAR WITH REINFORCED CONCRETE DRILLED PIER FOUNDATION AND STRUCTURAL SLAB ON GRADE. STRUCTURAL STEEL SUPERSTRUCTURE INSULATED METAL SIDING WITH SLOPED-STANDING SEAM METAL ROOF. DIRTY LOCKER ROOMS AND CLEAN LOCKER ROOMS WITH SHOWERS IN BETWEEN. OTHER PERSONNEL SPACE INCLUDES OFFICES TRAINING ROOMS AND BREAK ROOMS. ALL INTERIOR FINISHES, PLUMBING FIXTURES/EQUIPMENT, MECHANICAL SYSTEMS, ELECTRICAL EQUIPMENT/DISTRIBUTION, COMMUNICATION SYSTEMS, LIGHTING SYSTEMS, FIRE PROTECTION SYSTEMS, AND FUEL VAPOR SENSING, ALARM AND EXHAUST SYSTEM, FALL PROTECTION, WASH DOWN DRAINAGE TRENCHES, MONORAIL HOIST SYSTEM AND NECESSARY SUPPORT/WORK ASSOCIATED WITH THIS PROJECT. ROOM FOR MAINTENANCE AND REPAIR OF FUEL TANKS AND BLADDERS, ROOM FOR CTK AND RAILS. INCLUDES PAVEMENTS FOR 70 PARKING SPACES, SITE UTILITIES, AND SITE IMPROVEMENTS. ALSO INCLUDES DEMOLITION OF TWO SUBSTANDARD B-58 HUSTLER NOSE DOCKS, TWO SMALL BUILDINGS, 50 PARKING SPACES, MOVE A PAVILION, AND MOVEMENT OF A DE-ICER STORAGE FACILITY. PROVIDES TEMPORARY FACILITY FOR CTK/RAILS UNTIL HANGAR IS COMPLETED. PROJECT INCLUDES MINIMUM DOD FORCE PROTECTION, LEADERSHIP IN ENERGY AND ENVIRONMENTAL DESIGN (LEED) STANDARDS AND A STORM WATER RETENTION SYSTEM. THE PROJECT INCLUDES DEMOLITION OF TWO SUBSTANDARD B-58 HUSTLER NOSE DOCKS, TWO SMALL BUILDINGS, 50 PARKING SPACES, MOVEMENT OF A PAVILION, AND MOVEMENT OF A DE-ICER STORAGE FACILITY. ENVIRONMENTAL CLEAN-UP MAY BE REQUIRED BY OTHERS AND WILL NEED TO BE EVALUATED AND COORDINATED. IN ADDITION, THE PROJECT IS REQUIRED TO PROVIDE TEMPORARY FACILITIES FOR CTK/RAILS UNTIL HANGAR IS COMPLETED. INFRASTRUCTURE REQUIREMENTS MUST BE COORDINATED PRIOR TO AWARD AND PHYSICAL CONSTRUCTION BEGINNING ON THIS PROJECT. THE PROJECT WILL BE DESIGNED AND CERTIFIED TO THE LEED SILVER IN ACCORDANCE WITH THE U.S. GREEN BUILDING COUNCIL (USGBC) PROGRAM REQUIREMENTS. IN ADDITION, THE PROJECT HAS BEEN SELECTED BY THE AIR FORCE AS A POTENTIAL DEMONSTRATION PROJECT FOR A ZERO NET ENERGY (ZNE) FACILITY. — $21.6M
Frequently Asked Questions
How many contracts does Ross Group Construction Corporation, LLC have in Arkansas?
Ross Group Construction Corporation, LLC has 2 contracts performed in Arkansas worth a combined $57.6M.
What is the average contract size for Ross Group Construction Corporation, LLC in Arkansas?
The average contract size is $28.8M.