Nobis Engineering Inc Contracts with Environmental Protection Agency
Relationship Overview
Total Contract Value: $30,553,647
Contract Count: 6
Average Contract Size: $5.1M
Sole Source Rate: 0%
Small Business Rate: 0%
Spending by Sector
- Other: $30.6M (6 contracts)
Contracts
- TAS::68 8195::TAS THIS TASK ORDER OBLIGATES $115,451 FOR PREPARATION OF A WORK PLAN AND COST ESTIMATE FOR WORK TO BE PERFORMED AT THE SILRESIM CHEMICAL CORP. (SILRESIM) SUPERFUND SITE IN LOWELL, MA. ONCE THE WORK PLAN AND COST ESTIMATE ARE APPROVED, ADDITIONAL RECOVERY FUNDS WILL BE OBLIGATED FOR COMPLETION OF THE EFFORT. THE PURPOSE OF THIS TASK ORDER IS TO IMPLEMENT A REMEDIAL ACTION (RA) AT THE SILRESIM SUPERFUND SITE. THE CONTRACTOR WILL HAVE OVERALL RESPONSIBILITY FOR CONSTRUCTION OF A FINAL ENGINEERED BARRIER OVER A PORTION OF THE SILRESIM PROPERTY AND IMPLEMENTING THERMALLY-ENHANCED SOIL-VAPOR EXTRACTION (SVE) FOR THE REDUCTION OF VOLATILE ORGANIC COMPOUNDS (VOCS) IN SHALLOW SOIL AND GROUNDWATER. ELECTRICAL RESISTANCE HEATING (ERH) WILL BE USED FOR VOC REDUCTION. ERH IS A "THERMALLY-ENHANCED" VARIATION OF SVE THAT EMPLOYS ELECTRICAL CURRENT TO HEAT BOTH THE UNDERLYING SOIL AND GROUNDWATER; THE HEATED CONTAMINATED MEDIA LIBERATES SUBSTANTIALLY MORE CONTAMINATION WHICH CAN THEN BE CAPTURED, TREATED AND/OR DESTROYED. THE PERIOD OF PERFORMANCE IS FROM 11 MAY 2009 THROUGH 30 APRIL 2011. THE TASK ORDER HAS BEEN ISSUED UNDER THE REGION 1 SMALL BUSINESS REMEDIAL ACTION CONTRACT 2 (RAC2) ON 11 MAY 2009, AND IS TASK ORDER NUMBER 045-RARA-0122. ARRA::YES::ARRA — $16.1M
- CREESE AND COOK RA SUPPORT (DES). AWARD AND FUNDING FOR RA001 AND RA002. — $4.6M
- REMEDIAL ACQUISITION FRAMEWORK (RAF), DESIGN AND ENGINEERING SERVICES (DES). ISSUANCE OF TASK ORDER FOR THE MICROFAB SUPERFUND SITE. — $3.4M
- DES PIKE HILL COPPER MINES SUPERFUND SITE RA OVERSIGHT — $2.2M
- SHAFER/ARBUCKLE CREEK AREA SITE - REMEDIAL ACQUISITION FRAMEWORK (RAF), DESIGN AND ENGINEERING SERVICES (DES) THE PURPOSE OF THIS TASK ORDER (TO) IS FOR THE CONTRACTOR TO PERFORM REMEDIAL INVESTIGATION AND FEASIBILITY STUDY (RI/FS) SUPPORT SERVICES — $2.2M
- REGION 3 MULTI-SITE FIELD SERVICES SUPPORT THE PURPOSE OF THIS TASK ORDER IS TO PROVIDE THE ENVIRONMENTAL PROTECTION AGENCY (EPA) WITH FIELD — $2.1M
Frequently Asked Questions
How many contracts does Nobis Engineering Inc have with Environmental Protection Agency?
Nobis Engineering Inc has 6 contracts with Environmental Protection Agency worth a combined $30.6M.
What is the average contract size between Nobis Engineering Inc and Environmental Protection Agency?
The average contract size is $5.1M.
What percentage of Nobis Engineering Inc's contracts with Environmental Protection Agency are sole-source?
0% of the contracts are sole-source awards.