Niking Corp Contracts in Hawaii
Federal contract operations by Niking Corp performed in Hawaii (HI)
Overview
Total Contract Value: $70,976,476
Contract Count: 2
Average Contract Size: $35.5M
Sole Source Rate: 0%
Small Business Rate: 0%
Awarding Agencies
- Department of Defense — $71.0M (2 contracts)
Spending by Sector
- Other: $71.0M (2 contracts)
Contracts
- C2F, PHASE 1 — $55.1M
- TAS::17 1805::TAS RECOVERYPROJECT#::RM09-1363::RP# INSTALL PHOTOVOLTAIC SYSTEMS, OAHU, HI THIS PROJECT WILL CONSIST OF DESIGN-BUILD OF GRID-TIED PHOTOVOLTAIC POWER SYSTEMS ON THE ROOF TOP OF BUILDINGS 150, 1684, 654, 631 AND 617. THE DESIGN LIFE OF THE SYSTEM SHALL BE AT LEAST 20 YEARS IN CORROSIVE ENVIRONMENT. THE PV POWER SYSTEMS SHALL PRODUCE A MINIMUM AGGREGATED ENERGY OUTPUT OF 3.4 GWH DURING THE FIRST FULL YEAR OF OPERATION AND SHALL PRODUCE AGGREGATED ANNUAL OUTPUT EQUAL TO AND AT LEAST 80% OF THE FIRST YEAR TARGET FOR THE REMAINDER OF ITS TWENTY-YEAR LIFE. IT IS ANTICIPATED THAT THE AGGREGATED SYSTEM WILL CONTAIN PV PANELS/MODULES WITH OUTPUT CAPACITY OF AT LEAST 2.47 MWP DC BASED ON STANDARD TEST CONDITION (STC) AND WILL PROVIDE AT LEAST 1.85 MW AC OF CONTINUOUS POWER DURING PEAK DAYLIGHTS HOURS PECULIAR TO THE CRNH LOCATIONS. THE OUTPUT FROM EACH OF THE PV POWER SYSTEMS SHALL BE DESIGNED TO BE THE SAME AC VOLTAGE, WAVEFORM, AND FREQUENCY AS, AND WILL BE DISTRIBUTED VIA ISOLATION TRANSFORMER TO, THE NEAREST FACILITY GRID POWER PANEL. THE PV POWER SYSTEMS SHALL MEET ALL CURRENT NEC AND UL REQUIREMENTS, AND DESIGNED IN ACCORDANCE WITH THE CURRENT NAVAL FACILITIES ENGINEERING COMMAND HAWAII (NAVFAC-HI) PUBLIC WORKS UTILITIES CRITERIA. COMPLETE THE ENTIRE WORK READY FOR USE 545 CALENDAR DAYS AFTER THE NOTICE TO PROCEED. — $15.9M
Frequently Asked Questions
How many contracts does Niking Corp have in Hawaii?
Niking Corp has 2 contracts performed in Hawaii worth a combined $71.0M.
What is the average contract size for Niking Corp in Hawaii?
The average contract size is $35.5M.