Federal contract operations by Manson Construction CO performed in California (CA)
Overview
Total Contract Value: $756,505,948
Contract Count: 15
Average Contract Size: $50.4M
Sole Source Rate: 0%
Small Business Rate: 0%
Awarding Agencies
- Department of Defense — $719.2M (14 contracts)
- Department of the Interior — $37.3M (1 contracts)
Spending by Sector
- Other: $756.5M (15 contracts)
Contracts
- P327 DEMOLITION AND REPLACEMENT OF PIER 12 AND UPGRADE TO PIER 13, NAVAL BASE SAN DIEGO, SAN DIEGO, CA — $117.4M
- P508: FLOATING DRY DOCK MOORING FACILITY — $110.9M
- P443 DB CONSTRUCTION PIER 6 REPLACEMENT NBSD — $108.9M
- CONSTRUCTION CONTRACT FOR P440 — $96.3M
- IGF::OT::IGF DREDGING 1ST CYC-CHANNEL ISLANDS, VENTURA COUNTY, CA — $50.9M
- TAS::96 3134::TAS ARRA::YES::ARRA RECOVERYPROJECT#::105152::RP# PORT OF LONG BEACH (DEEPENING) AND OTHER LONG BEACH PROJECTS, SAN PEDRO BAY, LOS ANGELES COUNTY, CA THE PROJECT CONSISTS OF FILLING THE NORTHERN PORTION OF THE SLIP G AREA TO CREATE LAND. THIS WORK INCLUDES CONSTRUCITON OF ROCK DIKE, DREDGING, FILL OPERATIONS, WICK DRAIN INSTALLATION, SETTLEMENT MONITORING, ETC. ALSO DEEPENING OF THE PORT OF LONG BEACH (POLB) TRUNING BASIN TO - 76 FT. APPROXIMATELY 600,00 CUBIC YARDS — $39.9M
- GOLDEN GATE NATIONAL RECREATION AREA - STABILIZE ALCATRAZ WHARF THIS PROJECT WILL MAKE CRITICAL REPAIRS TO AND SEISMICALLY STRENGTHEN THE CONCRETE WHARF ON ALCATRAZ ISLAND, A CONTRIBUTING FEATURE OF THE ALCATRAZ ISLAND NATIONAL HISTORIC LANDMARK D — $37.3M
- DREDGING, FIRST CYCLE — $31.6M
- IGF::OT::IGF MAINTENANCE DREDGING NBSD — $29.8M
- IGF::OT::IGF DREDGING FIRST CYCLE CHANNEL ISLANDS, VENTURA COUNTY, CALIFORNIA — $28.2M
- 1ST CYC DREDG CHAN ISL -B,C,D,G -1ST 1M — $27.8M
- MAINTENANCE DREDGING OCEANSIDE HARBOR, SAN DIEGO COUNTY, CALIFORNIA FIRST CYCLE FY22 — $23.3M
- THE WORK INCLUDES ANNUAL MAINTENANCE DREDGING OF THE OAKLAND INNER AND OUTER HARBOR CHANNEL TO -50-FT (MLLW) PLUS 1-FT OF PAID OVER-DEPTH AND TRANSPORTING OF THE DREDGED MATERIAL PER THE REQUIREMENTS IN SPECIFICATION SECTION 00 10 00 — $23.1M
- RICHMOND INNER HARBOR FY25 MAINTENANCE DREDGING — $16.9M
- DREDGING, PLACEMENT AT SURFSIDE — $14.1M
Frequently Asked Questions
How many contracts does Manson Construction CO have in California?
Manson Construction CO has 15 contracts performed in California worth a combined $756.5M.
What is the average contract size for Manson Construction CO in California?
The average contract size is $50.4M.