Kiewit Infrastructure West CO Contracts in Hawaii
Federal contract operations by Kiewit Infrastructure West CO performed in Hawaii (HI)
Overview
Total Contract Value: $412,754,918
Contract Count: 11
Average Contract Size: $37.5M
Sole Source Rate: 0%
Small Business Rate: 0%
Awarding Agencies
- Department of Defense — $402.7M (10 contracts)
- Department of Transportation — $10.1M (1 contracts)
Spending by Sector
- Other: $412.8M (11 contracts)
Contracts
- FY18 MCON PROJECT P-704 SEWER LIFT STATION AND RELIEF SEWER LINES JOINT BASE PEARL HARBOR-HICKAM, HAWAII — $67.1M
- 200512!500406!2100!W9128A!USA ENGR DISTR PACIFIC OCEAN !W9128A04D0005 !A!N! !N!0002 ! !20050621!20070708!868643537!154549877!070729517!N!KIEWIT PACIFIC CO !1001 KAMOKILA BLVD , SUITE!KAPOLEI !HI!96707!69050!003!15!SCHOFIELD BARRACKS !HONOLULU !HAWAII !+000043500000!N!N!000000000000!Y152!MAINTENANCE BUILDINGS !C2 !CONSTRUCTION !000 !* !236210!E! !5!B!M! !A! !20200930!B! ! !A! !A!Y!J!2!013!B! !D!N!C! ! !N!C!N! ! ! !Z!Z!A!A!000!A!B!Y! !N! ! ! ! !0001! ! — $57.3M
- FY22 MCA PN93672 ROTARY WING PARKING APRON PHASE 2, WHEELER ARMY AIRFIELD, OAHU, HAWAII — $54.5M
- POH004- ROTARY WING PARKING APRON WHEELER ARMY AIRFIELD, HAWAII — $46.2M
- FY06MCA PN58815 DRUM RD UPGR PH II, HMR — $38.9M
- WON 1574357/1582944 FY21 REPLACE UNDERGROUND SALT WATER DISTRIBUTION LINES AND 12-INCH WATER LINE ALONG LAKE ERIE ST., VARIOUS LOCATIONS IN THE PHNSY AND WATERFRONT, JBPHH, HAWAII — $37.6M
- C0120-PN57197 BATTLE AREA CPX CONTRACT P — $33.6M
- RM17-1635 REPAIR ROADS AND EROSION CONTROL, RED HILL, JOINT BASE PEARL HARBOR-HICKAM, HAWAII — $27.5M
- KIKIAOLA LIGHT DRAFT HARBOR PROJECT, KEKAHA, ISLAND OF KAUAI, HI — $20.7M
- RM21-1095 DRY DOCK 1 (DD1) DISCHARGE THIMBLE AND RM17-2222 WR152413 DD1 MAIN PUMP #2 REPLACEMENT, JBPHH, HI — $19.2M
- GRADING, DRAINAGE, AND AGRICULTURAL FENCING ON 3.23 MILES - HI A-AD 6(2) & EMP 6(1A), SADDLE ROAD AND PALILA MITIGATION SITE FENCING. — $10.1M
Frequently Asked Questions
How many contracts does Kiewit Infrastructure West CO have in Hawaii?
Kiewit Infrastructure West CO has 11 contracts performed in Hawaii worth a combined $412.8M.
What is the average contract size for Kiewit Infrastructure West CO in Hawaii?
The average contract size is $37.5M.