CDM Constructors Inc. Contracts with Department of Defense
Relationship Overview
Total Contract Value: $589,548,878
Contract Count: 12
Average Contract Size: $49.1M
Sole Source Rate: 0%
Small Business Rate: 0%
Spending by Sector
- Other: $589.5M (12 contracts)
Contracts
- DESIGN BUILD - EDR WATER TREATMENT AND SYSTEM DESIGN AND CONSTRUCTION ACTIVITIES INCLUDING BUT NOT LIMITED TO THE DESIGN BUILD OF A 6.0 MILLION GALLONS PER DAY (MGD) EDR WATER TREATMENT PLANT. THE PLANT WILL TREAT ALL CONTAMINANTS FOUND IN FORT IRWIN'S GROUND WATER IN ACCORDANCE WITH (IAW) FEDERAL AND STATE REQUIREMENTS (I.E.: ARSENIC, FLUORIDE, AND TOTAL DISSOLVED SOLIDS). THE PLANT WILL INCLUDE AN ELECTRO-DIALYSIS REVERSAL (EDR) SYSTEM AS PRIMARY TREATMENT. THE PROJECT ALSO INCLUDES THE CONSTRUCTION OF THE EDR FACILITY WITH PUMPS, EDR STACKS, FILTERS, AND AN EDR WASTE EQUALIZATION TANK. THE PLANT ALSO INCLUDES TREATMENT OF THE WASTE STREAM TO ACHIEVE 99.8% POTABLE WATER RECOVERY RATE WITH REJECT DISCHARGE TO EVAPORATION PONDS. CONSTRUCTION ALSO INCLUDES A 1 MILLION GALLON (MG) PRETREATMENT TANK AND A 1 MG CLEAR WELL TANK. PROJECT ALSO INCLUDES CONTROL BUILDING, CHEMICAL BUILDING, TREATED WATER PUMP STATION, PROCESS DRAIN PUMP STATION, STANDBY GENERATOR, PROCESS PIPING, AND SCADA. THE PROJECT INCLUDES SUPPORTING UTILITIES AND INFRASTRUCTURE UPGRADES TO THE WATER PLANT INCLUDE ELECTRIC SERVICE, SITE IMPROVEMENTS, COMMUNICATIONS, WATER, SEWER, GAS, STORM WATER DRAINAGE AND ANTITERRORISM MEASURES. COMMISSIONING OF THE WATER TREATMENT PLANT IS ALSO INCLUDED. THE WATER SYSTEM IMPROVEMENTS INCLUDE PIPELINES CONNECTING THE WATER PLANT TO BICYCLE LAKE BOOSTER STATION, REPLACEMENT OF EXPIRED PIPE AND EQUIPMENT, AND WATER SUPPLY /DISTRIBUTION SYSTEM EXPANSION. OTHER SYSTEM IMPROVEMENTS INCLUDE IMPROVEMENT OF FIRE FLOW, INSTALLATION OF A NEW WATER WELL AT LANGFORD LAKE AND CONNECTING IRWIN BASIN WELLS TO RAW WATER TRANSMISSION LINES. TANK CONSTRUCTION INCLUDES REHABILITATION OF EXISTING WELDED STEEL WATER STORAGE TANKS AND REPAIR/REPLACEMENT OF A 1 MG ABOVE GROUND WATER STORAGE TANK. SUSTAINABLE DESIGN AND DEVELOPMENT (SDD), ENERGY INDEPENDENCE AND SECURITY ACT (EISA) OF 2007, AND ENERGY POLICY ACT OF 2005 (EPACT05) FEATURES WILL BE INCLUDED. — $102.9M
- IGF::OT::IGF SHEP DISSOLVED OXYGEN INJECTION SYSTEM — $99.9M
- SOFA: CONTRACT FOR SITE 13853-416 IN ISRAEL — $91.8M
- IGF::OT::IGF DESIGN-BUILD OF A `CLASS A WASTE WATER TREATMENT PLANT (WWTP) WITH NUTRIENT REMOVAL, TO INCLUDE REDUNDANT PROCESS EQUIPMENT WHILE APPLYING AN ACTIVATED SLUDGE SYSTEM EMPLOYING NUTRIENT REMOVAL WITH TERTIARY MEMBRANE FILTRATION, SUPPORTING A PROJECTED TOTAL POPULATION OF 100,000 PEOPLE AT JOINT BASE LEWIS-MCCHORD, WA. — $82.3M
- IGF::OT::IGF P-192 POTABLE WATER TREATMENT PLANT — $52.1M
- BASE BID (AWARDED), ADDITIVE NO. 1 (AWARDED), ADDITIVE NO. 2 (AWARDED) — $37.1M
- THE PROJECT INVOLVES THE DESIGN-BID-BUILD (DBB) OF A CONSTRUCTION PROJECT (KNOWN AS PROJECT 20117) IN ISRAEL FOR THE MOD AND ISRAEL AIR FORCE (IAF) FOR USE BY THE IAF. — $32.9M
- SOFA: SITE 13850 AND 13851, ISRAEL — $27.4M
- IGF::OT::IGF WATER DISTRIBUTION SYSTEM — $26.8M
- ST BERNARD PUMP STATIONS 2, 3 & 5 — $20.4M
- CONSTRUCTION OF INFIRMARY IN ISRAEL. — $13.0M
- RUNWAY REPAIR FOR SITE 20162 — $2.9M
Frequently Asked Questions
How many contracts does CDM Constructors Inc. have with Department of Defense?
CDM Constructors Inc. has 12 contracts with Department of Defense worth a combined $589.5M.
What is the average contract size between CDM Constructors Inc. and Department of Defense?
The average contract size is $49.1M.
What percentage of CDM Constructors Inc.'s contracts with Department of Defense are sole-source?
0% of the contracts are sole-source awards.