Action Facilities Management Inc Contracts in New York
Federal contract operations by Action Facilities Management Inc performed in New York (NY)
Overview
Total Contract Value: $42,111,905
Contract Count: 28
Average Contract Size: $1.5M
Sole Source Rate: 0%
Small Business Rate: 0%
Awarding Agencies
- General Services Administration — $42.1M (28 contracts)
Spending by Sector
- Other: $42.1M (28 contracts)
Contracts
- TED WEISS FEDERAL BUILDING AND ELEVATOR OPERATIONS AND MAINTENANCE SERVICES. — $20.7M
- O&M AND VERTICAL TRANSPORATION SERVICES 799 UNITED NATIONS PLAZA, NY, NY 6 MONTH BASE YEAR CONTRACT, EFFECTIVE 10/1/23 - 3/31/24. — $10.0M
- EO14042: NEW CLAUSE FOR ENSURING ADEQUATE COVID-19 SAFETY PROTOCOLS FOR FEDERAL CONTRACTORS — $6.7M
- THIS CONTRACT IS FOR FACILITIES ENGINEERING SERVICES AT THE KEATING FEDERAL BUILDING IN ROCHESTER, NY WITH OPTIONAL SERVICES AT THE JACKSON U.S. COURTHOUSE IN BUFFALO, NY. — $3.9M
- THE CONTRACTOR WILL PROVIDE LABOR AND MATERIALS TO MODERNIZE LOBBY LIGHTING, RETROFIT ROOM 411 TO FIRE RATING STANDARDS, AND INSULATE PIPING FOR THE COOLING TOWER. — $342.4K
- BORDER FUEL - 01 OCTOBER 2025 THROUGH 28 FEBRUARY 2026 EAST @ CARGO BUILDING, 237 WEST SERVICE ROAD, CHAMPLAIN, NY 12919-4440 — $76.5K
- EXISTING CONTROLS AND VAVS REPAIR ON AC1 AT JAMES T FOLEY US COURTHOUSE — $48.9K
- LABOR AND MATERIALS TO MAKE REPAIRS AND REPLACEMENTS, INCLUDING REMOVING CEILINGS IN BATHROOMS FOR ACCESS TO HOT WATER HEATERS ISOLATE HOT WATER HEATERS AND DRAIN ORIGINAL UNITS AND REMOVE OLD UNITS AND INSTALL 2 BRAND NEW HOT WATER HEATERS. — $48.5K
- LABOR AND MATERIALS FOR THE O&M COMPANY, AFM, TO MAKE HOT WATER HEATER REPLACEMENTS WITH TANKLESS UNITS IN SECURE AREAS OF 20TH & 21ST FLOORS. THESE NEW UNITS REQUIRE UPGRADED ELECTRICAL AND INSTALLATION OF AN ACCESS PANEL. — $34.3K
- PROJECT NY0350ZZ - ELEVATOR ALTERNATE FLOOR RECALL REPROGRAMMING FOR NY0350ZZ TED WEISS FEDERAL BUILDING — $31.9K
- BASEMENT CEILING TILE REPAIR AND REPLACE PROJECT LEO BRIEN FED BLDG — $24.8K
- PROJECT CIT -URGENT REPAIR OF EMERGENCY LIGHTS DISCONNECTION FROM SWITCHGEAR TO RISER - NY0282ZZ FOR NY0282ZZ JACOB K. JAVITZ FEDERAL BUILDING — $22.0K
- PROJECT NY0282ZZ - OSH ITEM FIREPROOFING PATCH IN 5 FBI ROOMS FOR NY0282ZZ JACOB K. JAVITS FEDERAL BUILDING — $19.9K
- NY0282ZZ - OVERHAUL SECONDARY PUMPS #5 AND #6 - IDL #130 @ NY0282ZZ JACOB K. JAVITZ FEDERAL BUILDING — $18.5K
- MEZZANINE RESTROOMS REPAIRS AT THE JAMES T. FOLEY COURTHOUSE — $17.3K
- THE CONTRACTOR SHALL PROVIDE ALL LABOR AND MATERIALS TO MANUFACTURE AND INSTALL REPLACEMENT WAYFINDING SIGNAGE IN BOTH STAIRWELLS, ON EACH FLOOR, TO DIRECT ONSITE PERSONNEL AT 799 UN PLAZA, NY 10017. — $17.3K
- NY0350ZZ- P0225200 REPINING OF THE MID-RISE ELEVATOR DOOR ON THE 2ND FLOOR — $12.8K
- 8TH FLOOR DRAIN PIPE REPAIR AT 26 FEDERAL PLAZA. — $12.7K
- THE JACKSON USCH- OUTSIDE AIR UNIT FLOW STATION UPGRADES- IDL ITEM CONTRACT AWARD LOCATED IN BUFFALO, NY TO AFM TOTALING $9,274.90 FOR THE WORK DESCRIBED IN THE SOW DATED 3/27/26. THE POP IS 4/8/26 - 7/7/26. — $9.3K
- THE AWARD FOR THE KEATING 2026 ELEVATOR CAT5 LOAD TESTING PROJECT IS FOR $7,897.12 TO AFM LOCATED IN ROCHESTER, NY FOR THE WORK DESCRIBED IN THE SOW DATED 3/26/26. THE PERIOD OF PERFORMANCE IS FROM 4/7/26 TO 7/6/26. — $7.9K
Frequently Asked Questions
How many contracts does Action Facilities Management Inc have in New York?
Action Facilities Management Inc has 28 contracts performed in New York worth a combined $42.1M.
What is the average contract size for Action Facilities Management Inc in New York?
The average contract size is $1.5M.