DoD Awards $16.5M Engineering Services Contract to Northrop Grumman, Sole-Source
Contract Overview
Contract Amount: $16,532,478 ($16.5M)
Contractor: Northrop Grumman Systems Corporation
Awarding Agency: Department of Defense
Start Date: 2007-06-08
End Date: 2017-09-30
Contract Duration: 3,767 days
Daily Burn Rate: $4.4K/day
Competition Type: NOT COMPETED
Number of Offers Received: 1
Pricing Type: TIME AND MATERIALS
Sector: Defense
Official Description: ENGLBR '08
Place of Performance
Location: SAINT AUGUSTINE, SAINT JOHNS County, FLORIDA, 32095
State: Florida Government Spending
Plain-Language Summary
Department of Defense obligated $16.5 million to NORTHROP GRUMMAN SYSTEMS CORPORATION for work described as: ENGLBR '08 Key points: 1. Significant contract value of $16.5 million awarded. 2. Sole-source award raises questions about competition and potential cost savings. 3. Long contract duration of 3767 days (over 10 years) suggests a critical, ongoing need. 4. Engineering services sector is vital for defense operations.
Value Assessment
Rating: questionable
The contract was awarded on a Time and Materials basis, which can lead to cost overruns if not managed tightly. Without competitive bidding, it's difficult to assess if the pricing is optimal compared to market rates for similar engineering services.
Cost Per Unit: N/A
Competition Analysis
Competition Level: sole-source
The contract was not competed, indicating a sole-source award. This limits price discovery and potentially leads to higher costs for taxpayers as there was no market pressure to offer the best price.
Taxpayer Impact: The lack of competition may result in higher spending than if the contract had been awarded through a competitive process.
Public Impact
Taxpayers may be paying a premium due to the absence of competitive bidding. The long-term nature of the contract suggests a sustained reliance on Northrop Grumman for these engineering services. Oversight is crucial to ensure the necessity and cost-effectiveness of the services provided over the contract's lifespan.
Waste & Efficiency Indicators
Waste Risk Score: 50 / 10
Warning Flags
- Sole-source award
- Time and Materials pricing
- Long contract duration
Positive Signals
- Awarded to a known defense contractor
- Supports critical defense needs
Sector Analysis
This contract falls within the Engineering Services sector, which is crucial for the Department of Defense's operational capabilities. Spending in this sector can vary widely based on specific project needs and technological advancements.
Small Business Impact
The data does not indicate any involvement of small businesses in this contract, suggesting it was awarded directly to a large corporation.
Oversight & Accountability
Given the sole-source nature and long duration, robust oversight by the Defense Contract Management Agency is essential to monitor performance, costs, and ensure the continued necessity of the services.
Related Government Programs
- Engineering Services
- Department of Defense Contracting
- Defense Contract Management Agency Programs
Risk Flags
- Lack of competition
- Potential for cost overruns
- Limited transparency on pricing
- Long-term commitment without clear performance benchmarks
Tags
engineering-services, department-of-defense, fl, delivery-order, 10m-plus
Frequently Asked Questions
What is this federal contract paying for?
Department of Defense awarded $16.5 million to NORTHROP GRUMMAN SYSTEMS CORPORATION. ENGLBR '08
Who is the contractor on this award?
The obligated recipient is NORTHROP GRUMMAN SYSTEMS CORPORATION.
Which agency awarded this contract?
Awarding agency: Department of Defense (Defense Contract Management Agency).
What is the total obligated amount?
The obligated amount is $16.5 million.
What is the period of performance?
Start: 2007-06-08. End: 2017-09-30.
What specific engineering services are being provided under this contract, and why was a sole-source award deemed necessary?
The specific engineering services are categorized under NAICS code 541330 (Engineering Services). A sole-source award typically occurs when only one responsible source can provide the required services, often due to unique capabilities, proprietary technology, or urgent needs. Further justification from the agency would be required to understand the rationale.
How does the Time and Materials pricing structure impact the overall cost and risk for the government?
Time and Materials (T&M) contracts can pose a higher cost risk to the government as they are not capped and can escalate if not closely monitored. The government pays for the actual labor hours and material costs incurred by the contractor, plus a markup. Effective oversight and clear task definitions are critical to control spending under T&M.
What mechanisms are in place to ensure the effectiveness and value for money of these engineering services over the 10-year period?
Mechanisms for ensuring effectiveness and value include regular performance reviews, milestone tracking, and potentially contract modifications or termination clauses if performance is unsatisfactory. The long duration necessitates ongoing dialogue and potential adjustments to ensure the services remain relevant and cost-effective as defense needs evolve.
Industry Classification
NAICS: Professional, Scientific, and Technical Services › Architectural, Engineering, and Related Services › Engineering Services
Product/Service Code: AEROSPACE CRAFT COMPONENTS AND ACCESSORIES
Competition & Pricing
Extent Competed: NOT COMPETED
Solicitation Procedures: ONLY ONE SOURCE
Offers Received: 1
Pricing Type: TIME AND MATERIALS (Y)
Evaluated Preference: NONE
Contractor Details
Parent Company: Northrop Grumman Corporation (UEI: 967356127)
Address: 5000 US HIGHWAY 1 N, SAINT AUGUSTINE, FL, 32095
Business Categories: Category Business, Not Designated a Small Business
Financial Breakdown
Contract Ceiling: $17,505,828
Exercised Options: $16,532,478
Current Obligation: $16,532,478
Contract Characteristics
Commercial Item: COMMERCIAL ITEM PROCEDURES NOT USED
Cost or Pricing Data: NO
Parent Contract
Parent Award PIID: N0018907DZ031
IDV Type: IDC
Timeline
Start Date: 2007-06-08
Current End Date: 2017-09-30
Potential End Date: 2017-09-30 00:00:00
Last Modified: 2017-02-07
More Contracts from Northrop Grumman Systems Corporation
- 200506!000026!5700!fa8214!oo-Alc/Pkme/Lmke !F4261098C0001 !A!N! !Y! !p01502!20041213!20050701!001563738!004179453!016435559!n!northrop Grumman Space & Missi!888 S 2000 E !clearfield !ut!84015!13850!011!49!clearfield !davis !utah !-000001960000!n!n!000000000000!l014!tech REP Svcs/Guided Missiles !A2 !missile and Space Systems !302 !minuteman III GRP !541330!E! !3! ! !C! ! !20200930!B! ! !A! !a!n!l!2!002!b! !Z!Y!Z! ! !N!C!N! ! ! !a!a!a!a!000!a!c!n! ! ! ! ! ! !0001! ! — $10.0B (Department of Defense)
- E-2D Advanced Hawkeye Aircraft (FRP-7) — $8.5B (Department of Defense)
- E-2D Advanced Hawkeye Aircraft (FRP-2) — $5.4B (Department of Defense)
- First DDT and E, Ares I-X, and Flight Tests. First Stage Will BE a Five Segment, Solid Rocket Booster Derived From the Space Shuttle Program (SSP) Solid Rocket Booster (srb)/Reusable Solid Rocket Motor (rsrm). the Contractor Shall Furnish the Necessary Management, Engineering, Labor, Facilities, Tools, Equipment, and Materials Required for First Stage Development, Qualification, Certification and Acceptance Program. Activities Include: Redesign and Testing of the Motor to Incorporate the Fifth Segment and Production of Five Full Scale Ground Static Test Motors: TWO Development Motors (dms)-And Three Qualification Motors (QMS); Structural Test Article (STA), Ground Vibration Test Motors (gvtms) and Other Development Testing; Redesign of the Avionics, Deceleration, Separation, and Flight Termination System (FTS) Subsystems; Ares I-X: Simulated Ares I Outer Mold Line/Mass Properties Using Modified Srb/Rsrm; and Three Flight Test Vehicles. TAS::80 0124::TAS — $4.4B (National Aeronautics and Space Administration)
- Federal Contract — $4.4B (Department of Defense)
View all Northrop Grumman Systems Corporation federal contracts →
Other Department of Defense Contracts
- Federal Contract — $51.3B (Humana Government Business Inc)
- Lrip LOT 12 Advance Acquisition Contract — $35.1B (Lockheed Martin Corporation)
- SSN 802 and 803 Long Lead Time Material — $34.7B (Electric Boat Corporation)
- 200204!008532!1700!AF600 !naval AIR Systems Command !N0001902C3002 !A!N! !N! !20011026!20120430!008016958!008016958!834951691!n!lockheed Martin Corporation !lockheed Blvd !fort Worth !tx!76108!27000!439!48!fort Worth !tarrant !texas !+000026000000!n!n!018981928201!ac15!rdte/Aircraft-Eng/Manuf Develop !a1a!airframes and Spares !2ama!jast/Jsf !336411!E! !3! ! ! ! ! !99990909!B! ! !A! !a!n!r!2!002!n!1a!a!n!z! ! !N!C!N! ! ! !a!a!a!a!000!a!c!n! ! ! !Y! !N00019!0001! — $34.2B (Lockheed Martin Corporation)
- KC-X Modernization Program — $32.0B (THE Boeing Company)