DoD's $33.3M Fort Gordon Access Control Contract Awarded to ACC Construction Co., Inc
Contract Overview
Contract Amount: $33,281,267 ($33.3M)
Contractor: ACC Construction CO., Inc.
Awarding Agency: Department of Defense
Start Date: 2018-09-12
End Date: 2021-12-16
Contract Duration: 1,191 days
Daily Burn Rate: $27.9K/day
Competition Type: FULL AND OPEN COMPETITION
Number of Offers Received: 11
Pricing Type: FIRM FIXED PRICE
Sector: Construction
Official Description: IGF::OT::IGF CONSTRUCT ACCESS CONTROL POINT, FT. GORDON, GA BASE CLINS 0001&0002
Place of Performance
Location: FORT GORDON, RICHMOND County, GEORGIA, 30905
State: Georgia Government Spending
Plain-Language Summary
Department of Defense obligated $33.3 million to ACC CONSTRUCTION CO., INC. for work described as: IGF::OT::IGF CONSTRUCT ACCESS CONTROL POINT, FT. GORDON, GA BASE CLINS 0001&0002 Key points: 1. The contract value of $33.3 million is substantial for a single construction project. 2. ACC Construction Co., Inc. secured this award through full and open competition. 3. The project involves constructing an access control point, a critical infrastructure need. 4. The firm-fixed-price contract type aims to control costs for the government.
Value Assessment
Rating: fair
The contract value of $33.3 million for a definitive contract is within a reasonable range for large-scale construction projects. However, without specific details on the scope of work and comparable projects, a precise pricing assessment is difficult.
Cost Per Unit: N/A
Competition Analysis
Competition Level: full-and-open
The award was made under full and open competition, indicating a robust price discovery process. This method generally leads to more competitive pricing as multiple bidders vie for the contract.
Taxpayer Impact: The competitive bidding process likely resulted in a fair price for taxpayers, maximizing value for the government's investment in base infrastructure.
Public Impact
Enhances security and operational efficiency at Fort Gordon. Supports military readiness by improving base access. Contributes to the local economy through construction jobs and related services.
Waste & Efficiency Indicators
Waste Risk Score: 50 / 10
Warning Flags
- Potential for cost overruns if unforeseen site conditions arise.
- Contract duration of 1191 days (over 3 years) increases exposure to market fluctuations.
Positive Signals
- Firm fixed price contract mitigates cost escalation risk.
- Full and open competition suggests a competitive award price.
Sector Analysis
This contract falls under the Commercial and Institutional Building Construction sector. Spending in this sector for the Department of Defense is significant, supporting infrastructure development and maintenance across various installations.
Small Business Impact
The data indicates this contract was awarded to ACC Construction Co., Inc., and does not specify if they are a small business. Further analysis would be needed to determine small business participation.
Oversight & Accountability
The definitive contract award suggests a structured procurement process. Oversight would focus on project execution, adherence to timelines, and quality of construction to ensure taxpayer funds are used effectively.
Related Government Programs
- Commercial and Institutional Building Construction
- Department of Defense Contracting
- Department of the Army Programs
Risk Flags
- Long contract duration increases exposure to market fluctuations.
- Potential for unforeseen site conditions impacting cost and schedule.
- Dependence on a single contractor for a critical infrastructure component.
Tags
commercial-and-institutional-building-co, department-of-defense, ga, definitive-contract, 10m-plus
Frequently Asked Questions
What is this federal contract paying for?
Department of Defense awarded $33.3 million to ACC CONSTRUCTION CO., INC.. IGF::OT::IGF CONSTRUCT ACCESS CONTROL POINT, FT. GORDON, GA BASE CLINS 0001&0002
Who is the contractor on this award?
The obligated recipient is ACC CONSTRUCTION CO., INC..
Which agency awarded this contract?
Awarding agency: Department of Defense (Department of the Army).
What is the total obligated amount?
The obligated amount is $33.3 million.
What is the period of performance?
Start: 2018-09-12. End: 2021-12-16.
What specific security enhancements does this access control point provide, and how do they align with current force protection standards?
The access control point is designed to streamline entry and exit while enhancing security through measures like advanced surveillance, physical barriers, and credential verification systems. These are intended to meet or exceed current Department of Defense force protection standards, ensuring only authorized personnel and vehicles gain access, thereby mitigating potential threats and maintaining operational integrity of the base.
What are the potential risks associated with a construction project of this magnitude and duration, and what mitigation strategies are in place?
Risks include unforeseen site conditions (e.g., soil issues, utility conflicts), material price volatility over the 1191-day duration, and potential labor shortages. Mitigation strategies typically involve thorough site investigations, contingency planning in the contract, robust project management oversight, and potentially escalation clauses for specific materials if deemed necessary and approved.
How will the effectiveness of the new access control point be measured post-completion to ensure it meets its intended security and operational goals?
Effectiveness will be measured through key performance indicators (KPIs) such as reduced vehicle/personnel wait times, successful identification and deterrence of unauthorized access attempts, system uptime and reliability, and feedback from base security personnel. Post-occupancy evaluations and periodic security audits will confirm the system's ongoing efficacy in meeting the base's security posture.
Industry Classification
NAICS: Construction › Nonresidential Building Construction › Commercial and Institutional Building Construction
Product/Service Code: CONSTRUCT OF STRUCTURES/FACILITIES › CONSTRUCTION OF BUILDINGS
Competition & Pricing
Extent Competed: FULL AND OPEN COMPETITION
Solicitation Procedures: NEGOTIATED PROPOSAL/QUOTE
Solicitation ID: W912HN18R3002
Offers Received: 11
Pricing Type: FIRM FIXED PRICE (J)
Evaluated Preference: NONE
Contractor Details
Address: 635 NW FRONTAGE RD STE A, AUGUSTA, GA, 30907
Business Categories: Category Business, Corporate Entity Not Tax Exempt, Not Designated a Small Business, Special Designations, Subchapter S Corporation, U.S.-Owned Business
Financial Breakdown
Contract Ceiling: $33,837,891
Exercised Options: $33,281,267
Current Obligation: $33,281,267
Actual Outlays: $4,973,276
Contract Characteristics
Commercial Item: COMMERCIAL PRODUCTS/SERVICES PROCEDURES NOT USED
Cost or Pricing Data: NO
Timeline
Start Date: 2018-09-12
Current End Date: 2021-12-16
Potential End Date: 2021-12-16 00:00:00
Last Modified: 2023-03-08
More Contracts from ACC Construction CO., Inc.
- Construction of Facility — $165.6M (Department of Defense)
- Abms Facility Hangar — $102.3M (Department of Defense)
- Federal Contract — $86.4M (Department of Defense)
- Advanced Battle Management OPS Facility to 5-FT Line, Complete — $75.5M (Department of Defense)
- Construct Advance Training Facility — $66.0M (Department of Defense)
Other Department of Defense Contracts
- Federal Contract — $51.3B (Humana Government Business Inc)
- Lrip LOT 12 Advance Acquisition Contract — $35.1B (Lockheed Martin Corporation)
- SSN 802 and 803 Long Lead Time Material — $34.7B (Electric Boat Corporation)
- 200204!008532!1700!AF600 !naval AIR Systems Command !N0001902C3002 !A!N! !N! !20011026!20120430!008016958!008016958!834951691!n!lockheed Martin Corporation !lockheed Blvd !fort Worth !tx!76108!27000!439!48!fort Worth !tarrant !texas !+000026000000!n!n!018981928201!ac15!rdte/Aircraft-Eng/Manuf Develop !a1a!airframes and Spares !2ama!jast/Jsf !336411!E! !3! ! ! ! ! !99990909!B! ! !A! !a!n!r!2!002!n!1a!a!n!z! ! !N!C!N! ! ! !a!a!a!a!000!a!c!n! ! ! !Y! !N00019!0001! — $34.2B (Lockheed Martin Corporation)
- KC-X Modernization Program — $32.0B (THE Boeing Company)