Army Spends $25.1M on Chief Joseph Dam Spillway Gates Maintenance
Contract Overview
Contract Amount: $25,142,308 ($25.1M)
Contractor: Knight Const. & Supply, Inc
Awarding Agency: Department of Defense
Start Date: 2017-05-18
End Date: 2021-07-16
Contract Duration: 1,520 days
Daily Burn Rate: $16.5K/day
Competition Type: FULL AND OPEN COMPETITION AFTER EXCLUSION OF SOURCES
Number of Offers Received: 5
Pricing Type: FIRM FIXED PRICE
Sector: Construction
Official Description: IGF::OT::IGF CHIEF JOSEPH DAM SPILLWAY GATES LIFECYCLE MAINTENANCE
Place of Performance
Location: BRIDGEPORT, DOUGLAS County, WASHINGTON, 98813
Plain-Language Summary
Department of Defense obligated $25.1 million to KNIGHT CONST. & SUPPLY, INC for work described as: IGF::OT::IGF CHIEF JOSEPH DAM SPILLWAY GATES LIFECYCLE MAINTENANCE Key points: 1. The contract awarded to Knight Const. & Supply, Inc. for $25.1M covers lifecycle maintenance of spillway gates. 2. Competition was full and open after exclusion of sources, suggesting a deliberate sourcing strategy. 3. The firm fixed price contract type aims to control costs for this significant infrastructure project. 4. The project falls under 'Other Heavy and Civil Engineering Construction', a sector vital for national infrastructure.
Value Assessment
Rating: fair
The contract value of $25.1M for lifecycle maintenance of dam spillway gates appears substantial. Benchmarking against similar large-scale civil engineering maintenance contracts would be necessary for a precise assessment.
Cost Per Unit: N/A
Competition Analysis
Competition Level: full-and-open
The 'FULL AND OPEN COMPETITION AFTER EXCLUSION OF SOURCES' indicates a competitive process was initiated, but specific sources were excluded. This could impact price discovery if the exclusion was not fully justified.
Taxpayer Impact: Taxpayer funds are being utilized for essential infrastructure maintenance. The effectiveness of the competition method in securing the best value for taxpayers is a key consideration.
Public Impact
Ensures the operational integrity of a critical piece of water management infrastructure. Supports regional water supply and flood control capabilities. Invests in the longevity of a significant federal asset. Potential for disruption to dam operations if maintenance is not performed effectively.
Waste & Efficiency Indicators
Waste Risk Score: 50 / 10
Warning Flags
- Justification for exclusion of sources needs review.
- Potential for cost overruns if unforeseen issues arise.
- Long contract duration (1520 days) increases risk exposure.
Positive Signals
- Firm fixed price contract mitigates cost escalation risk.
- Focus on lifecycle maintenance suggests a proactive approach.
- Awarded by Department of the Army, indicating a critical need.
Sector Analysis
This contract falls within the 'Other Heavy and Civil Engineering Construction' sector, which involves large-scale infrastructure projects. Spending in this sector is often project-specific and driven by federal infrastructure needs and asset management.
Small Business Impact
The contract was awarded to Knight Const. & Supply, Inc., a firm. Analysis of whether this firm is a small business and if subcontracting opportunities were provided to small businesses is needed.
Oversight & Accountability
Oversight would typically involve contract performance monitoring by the Army Corps of Engineers to ensure work meets specifications and timelines. Accountability rests with the contractor for delivery and the agency for proper contract management.
Related Government Programs
- Other Heavy and Civil Engineering Construction
- Department of Defense Contracting
- Department of the Army Programs
Risk Flags
- Potential for cost overruns due to long duration.
- Lack of transparency regarding source exclusion.
- Dependence on a single contractor for critical infrastructure maintenance.
- Risk of unforeseen technical challenges during maintenance.
Tags
other-heavy-and-civil-engineering-constr, department-of-defense, wa, definitive-contract, 10m-plus
Frequently Asked Questions
What is this federal contract paying for?
Department of Defense awarded $25.1 million to KNIGHT CONST. & SUPPLY, INC. IGF::OT::IGF CHIEF JOSEPH DAM SPILLWAY GATES LIFECYCLE MAINTENANCE
Who is the contractor on this award?
The obligated recipient is KNIGHT CONST. & SUPPLY, INC.
Which agency awarded this contract?
Awarding agency: Department of Defense (Department of the Army).
What is the total obligated amount?
The obligated amount is $25.1 million.
What is the period of performance?
Start: 2017-05-18. End: 2021-07-16.
What was the specific justification for excluding certain sources in the 'FULL AND OPEN COMPETITION AFTER EXCLUSION OF SOURCES' process, and did this exclusion limit competitive pricing?
The justification for excluding sources is critical. If based on specific technical capabilities or past performance requirements, it might be valid. However, broad exclusions without clear rationale could stifle competition, potentially leading to higher prices than a truly open market would yield. A review of the solicitation documents and any pre-award justifications is necessary.
How does the $25.1M contract value compare to industry benchmarks for similar lifecycle maintenance projects on large dam spillway gates, considering the 1520-day duration?
Benchmarking this $25.1M contract against similar projects is essential for value assessment. Factors like dam size, gate complexity, geographic location, and specific maintenance scope influence costs. A comparison with data from other Army Corps of Engineers projects or similar federal/state infrastructure maintenance contracts would reveal if the price is competitive or potentially inflated.
What are the key performance indicators (KPIs) used to measure the effectiveness of the lifecycle maintenance performed under this contract, and how is contractor performance being monitored?
Effectiveness is measured by ensuring the spillway gates remain fully operational, safe, and meet all performance specifications post-maintenance. KPIs likely include adherence to maintenance schedules, quality of repairs, successful testing, and minimal downtime. The Army Corps of Engineers would monitor these through regular site inspections, progress reports, and final acceptance criteria.
Industry Classification
NAICS: Construction › Other Heavy and Civil Engineering Construction › Other Heavy and Civil Engineering Construction
Product/Service Code: CONSTRUCT OF STRUCTURES/FACILITIES › CONSTRUCTION OF BUILDINGS
Competition & Pricing
Extent Competed: FULL AND OPEN COMPETITION AFTER EXCLUSION OF SOURCES
Solicitation Procedures: NEGOTIATED PROPOSAL/QUOTE
Solicitation ID: W912DW17R0002
Offers Received: 5
Pricing Type: FIRM FIXED PRICE (J)
Evaluated Preference: NONE
Contractor Details
Address: 28308 N CEDAR RD, DEER PARK, WA, 99006
Business Categories: Category Business, Corporate Entity Not Tax Exempt, Small Business, Special Designations, Subchapter S Corporation, U.S.-Owned Business
Financial Breakdown
Contract Ceiling: $25,142,308
Exercised Options: $25,142,308
Current Obligation: $25,142,308
Subaward Activity
Number of Subawards: 4
Total Subaward Amount: $2,897,787
Contract Characteristics
Commercial Item: COMMERCIAL ITEM PROCEDURES NOT USED
Cost or Pricing Data: NO
Timeline
Start Date: 2017-05-18
Current End Date: 2021-07-16
Potential End Date: 2021-07-16 00:00:00
Last Modified: 2020-10-15
More Contracts from Knight Const. & Supply, Inc
- LSR Navlock Tainter Valves System Upgrades — $64.6M (Department of Defense)
- Mcnary Intake Gates and Isophse BUS Systems — $53.9M (Department of Defense)
- Manufacture and Deliver NEW Crane — $28.5M (Department of Defense)
- Construction Contracts for Dexter DAM and Reservoir Spillway Tainter Gate Repair — $16.2M (Department of Defense)
- ICE Harbor DAM Navigation Lock Upstream Gate Fabrication — $3.9M (Department of Defense)
Other Department of Defense Contracts
- Federal Contract — $51.3B (Humana Government Business Inc)
- Lrip LOT 12 Advance Acquisition Contract — $35.1B (Lockheed Martin Corporation)
- SSN 802 and 803 Long Lead Time Material — $34.7B (Electric Boat Corporation)
- 200204!008532!1700!AF600 !naval AIR Systems Command !N0001902C3002 !A!N! !N! !20011026!20120430!008016958!008016958!834951691!n!lockheed Martin Corporation !lockheed Blvd !fort Worth !tx!76108!27000!439!48!fort Worth !tarrant !texas !+000026000000!n!n!018981928201!ac15!rdte/Aircraft-Eng/Manuf Develop !a1a!airframes and Spares !2ama!jast/Jsf !336411!E! !3! ! ! ! ! !99990909!B! ! !A! !a!n!r!2!002!n!1a!a!n!z! ! !N!C!N! ! ! !a!a!a!a!000!a!c!n! ! ! !Y! !N00019!0001! — $34.2B (Lockheed Martin Corporation)
- KC-X Modernization Program — $32.0B (THE Boeing Company)