Washington Aqueduct Basin 3 & 4 Improvements Contract Awarded for $20.98M to W. M. Schlosser Co
Contract Overview
Contract Amount: $20,982,350 ($21.0M)
Contractor: W. M. Schlosser CO., Inc.
Awarding Agency: Department of Defense
Start Date: 2023-09-05
End Date: 2026-08-18
Contract Duration: 1,078 days
Daily Burn Rate: $19.5K/day
Competition Type: FULL AND OPEN COMPETITION
Number of Offers Received: 5
Pricing Type: FIRM FIXED PRICE
Sector: Construction
Official Description: WASHINGTON AQUEDUCT BASIN 3 & 4 FLOCCULATION AND SEDIMENTATION IMPROVEMENTS
Place of Performance
Location: WASHINGTON, DISTRICT OF COLUMBIA County, DISTRICT OF COLUMBIA, 20016
Plain-Language Summary
Department of Defense obligated $21.0 million to W. M. SCHLOSSER CO., INC. for work described as: WASHINGTON AQUEDUCT BASIN 3 & 4 FLOCCULATION AND SEDIMENTATION IMPROVEMENTS Key points: 1. Contract awarded to W. M. Schlosser Co., Inc. for $20.98 million. 2. Project involves flocculation and sedimentation improvements for the Washington Aqueduct. 3. Full and open competition was utilized for this procurement. 4. The contract type is Firm Fixed Price, indicating price certainty. 5. Project duration is 1078 days, concluding in August 2026.
Value Assessment
Rating: good
The contract value of $20.98 million appears reasonable for a large-scale infrastructure project of this nature. Benchmarking against similar water treatment facility upgrades would provide a more precise assessment, but the scale suggests a significant investment.
Cost Per Unit: N/A
Competition Analysis
Competition Level: full-and-open
The use of full and open competition is a positive indicator for achieving competitive pricing. This method allows all qualified contractors to bid, fostering a price discovery process that should lead to a fair market price.
Taxpayer Impact: The competitive bidding process is expected to ensure taxpayer funds are used efficiently for necessary infrastructure improvements.
Public Impact
Ensures continued safe and reliable water treatment for the Washington D.C. metropolitan area. Modernizes critical water infrastructure, potentially improving water quality and system resilience. Supports local construction jobs and economic activity within the District of Columbia.
Waste & Efficiency Indicators
Waste Risk Score: 50 / 10
Warning Flags
- Potential for cost overruns if unforeseen site conditions arise.
- Dependence on a single contractor for a critical infrastructure project.
Positive Signals
- Firm Fixed Price contract limits cost uncertainty for the government.
- Full and open competition suggests a competitive award.
- Project addresses essential public health and safety needs.
Sector Analysis
This contract falls within the construction sector, specifically water and sewer infrastructure. Spending benchmarks for similar water treatment facility upgrades vary widely based on project scope and location, but large-scale projects often run into tens of millions of dollars.
Small Business Impact
While the prime contractor is W. M. Schlosser Co., Inc., the contract details do not specify any subcontracting goals for small businesses. Further investigation into subcontracting plans would be needed to assess small business participation.
Oversight & Accountability
The Department of Defense, through the Department of the Army, is overseeing this contract. Standard oversight mechanisms for federal construction projects, including site inspections and progress reporting, are expected to be in place.
Related Government Programs
- Water and Sewer Line and Related Structures Construction
- Department of Defense Contracting
- Department of the Army Programs
Risk Flags
- Potential for schedule delays due to complex construction.
- Reliance on a single contractor for a critical utility.
- Scope creep could lead to cost increases.
- Unforeseen geological or environmental conditions.
Tags
water-and-sewer-line-and-related-structu, department-of-defense, dc, definitive-contract, 10m-plus
Frequently Asked Questions
What is this federal contract paying for?
Department of Defense awarded $21.0 million to W. M. SCHLOSSER CO., INC.. WASHINGTON AQUEDUCT BASIN 3 & 4 FLOCCULATION AND SEDIMENTATION IMPROVEMENTS
Who is the contractor on this award?
The obligated recipient is W. M. SCHLOSSER CO., INC..
Which agency awarded this contract?
Awarding agency: Department of Defense (Department of the Army).
What is the total obligated amount?
The obligated amount is $21.0 million.
What is the period of performance?
Start: 2023-09-05. End: 2026-08-18.
What are the specific performance metrics for the flocculation and sedimentation improvements?
The contract documents should detail specific performance metrics related to water quality improvements, such as turbidity reduction, removal efficiency of suspended solids, and compliance with EPA standards. These metrics are crucial for evaluating the effectiveness of the upgrades and ensuring the project meets its intended public health and environmental objectives.
What is the contingency plan if W. M. Schlosser Co., Inc. fails to meet project deadlines or quality standards?
The contract likely includes clauses for remedies in case of contractor non-performance, such as liquidated damages for delays or termination for default. The government's project management team would monitor progress closely and have procedures in place to address issues, potentially involving corrective action plans or invoking contract termination clauses if necessary.
How does the cost of this project compare to similar water infrastructure upgrades in other major metropolitan areas?
A comprehensive comparison would require detailed analysis of project scope, complexity, and local economic factors in other cities. However, the $20.98 million price tag for improving two basins suggests a significant investment, aligning with the substantial costs typically associated with upgrading critical water treatment infrastructure in densely populated urban areas.
Industry Classification
NAICS: Construction › Utility System Construction › Water and Sewer Line and Related Structures Construction
Product/Service Code: MAINT, REPAIR, ALTER REAL PROPERTY › MAINT, ALTER, REPAIR BUILDINGS
Competition & Pricing
Extent Competed: FULL AND OPEN COMPETITION
Solicitation Procedures: SEALED BID
Solicitation ID: W912DR23B0015
Offers Received: 5
Pricing Type: FIRM FIXED PRICE (J)
Evaluated Preference: NONE
Contractor Details
Address: 2400 51ST PL, HYATTSVILLE, MD, 20781
Business Categories: Category Business, Corporate Entity Not Tax Exempt, Not Designated a Small Business, Special Designations, U.S.-Owned Business
Financial Breakdown
Contract Ceiling: $21,314,361
Exercised Options: $21,314,361
Current Obligation: $20,982,350
Contract Characteristics
Commercial Item: COMMERCIAL PRODUCTS/SERVICES PROCEDURES NOT USED
Cost or Pricing Data: NO
Timeline
Start Date: 2023-09-05
Current End Date: 2026-08-18
Potential End Date: 2026-08-18 00:00:00
Last Modified: 2026-01-14
More Contracts from W. M. Schlosser CO., Inc.
- Joint Base Andrews Replace Airfield Drainange System — $37.6M (Department of Defense)
- BID Item 0001 — $21.5M (Department of Defense)
- Base Bid-P670 Turbo JET Engine Test Cell - Award — $12.6M (Department of Defense)
Other Department of Defense Contracts
- Federal Contract — $51.3B (Humana Government Business Inc)
- Lrip LOT 12 Advance Acquisition Contract — $35.1B (Lockheed Martin Corporation)
- SSN 802 and 803 Long Lead Time Material — $34.7B (Electric Boat Corporation)
- 200204!008532!1700!AF600 !naval AIR Systems Command !N0001902C3002 !A!N! !N! !20011026!20120430!008016958!008016958!834951691!n!lockheed Martin Corporation !lockheed Blvd !fort Worth !tx!76108!27000!439!48!fort Worth !tarrant !texas !+000026000000!n!n!018981928201!ac15!rdte/Aircraft-Eng/Manuf Develop !a1a!airframes and Spares !2ama!jast/Jsf !336411!E! !3! ! ! ! ! !99990909!B! ! !A! !a!n!r!2!002!n!1a!a!n!z! ! !N!C!N! ! ! !a!a!a!a!000!a!c!n! ! ! !Y! !N00019!0001! — $34.2B (Lockheed Martin Corporation)
- KC-X Modernization Program — $32.0B (THE Boeing Company)