This Project Will Revitalize/Renovate Five Rolling PIN Barracks Within the 16000 Block of Fort Hood, TX. This Project Will Replace the Failing Hvac System, Repair Interior Finishes Impacted by Moisture/High Humidity, Update the Living Areas, Renovate the Building Exterior, Provide Storage Rooms, and Improve Site Drainage. Renovations Shall Increase the Life Expectancy of the Barracks by 25-Years. the Design-Build Contract Will Include Both Design and Construction of the Required Renovations

Contract Overview

Contract Amount: $57,622,139 ($57.6M)

Contractor: Guyco Inc

Awarding Agency: Department of Defense

Start Date: 2018-11-21

End Date: 2021-04-23

Contract Duration: 884 days

Daily Burn Rate: $65.2K/day

Official Description: THIS PROJECT WILL REVITALIZE/RENOVATE FIVE ROLLING PIN BARRACKS WITHIN THE 16000 BLOCK OF FORT HOOD, TX. THIS PROJECT WILL REPLACE THE FAILING HVAC SYSTEM, REPAIR INTERIOR FINISHES IMPACTED BY MOISTURE/HIGH HUMIDITY, UPDATE THE LIVING AREAS, RENOVATE THE BUILDING EXTERIOR, PROVIDE STORAGE ROOMS, AND IMPROVE SITE DRAINAGE. RENOVATIONS SHALL INCREASE THE LIFE EXPECTANCY OF THE BARRACKS BY 25-YEARS. THE DESIGN-BUILD CONTRACT WILL INCLUDE BOTH DESIGN AND CONSTRUCTION OF THE REQUIRED RENOVATIONS.

Place of Performance

Location: Texas, 76544

State: Texas Government Spending

Related Pages