Construction of a Maneuver Systems Sustainment Center (mssc) for Tactical Wheeled Vehicles Complete Rebuild&assembly Recapitalization) AT RED River Army Depot, Texarkana, Texas. This Includes Construction of the Assembly Building, Hardstand and Covered Staging/Fuel Area With an Approximate Size of Over 200,000 SF. Antiterrorism/Force Protection Measures Include a Mass Notification System. Project Also Includes Fire Protection Systems That Connect to the Installation's Central System, Future Connection Capability of Building Automation Systems to a Depot-Wide Central Energy Monitoring and Control System (emcs), and Building Information Systems. Supporting Facilities Include Connections to ALL Required Utilities (industrial and Domestic), Exterior Lighting, Lightning Protection, Loading Areas, Storm Water Management, and Site Work. Special Foundations ARE Required AS IS Requirements for Specialized Processes Involving Hazardous Chemicals and Specialized Construction for Follow on Equipment Layout, and Coordination With Multiple Contractors. Heating and AIR Conditioning Will BE Provided by Self-Contained Units. Access for Individuals With Disabilities Will BE Provided. Sustainable Design and Development (SDD) and Energy Policy ACT of 2005 (epact05) Features Will BE Provided; a Silver Rating in Leed 2.2 IS Required to BE Certified. AIR Conditioning (estimated 40 Tons)
Contract Overview
Contract Amount: $47,306,374 ($47.3M)
Contractor: GCC Mccarthy Joint Venture IV
Awarding Agency: Department of Defense
Start Date: 2012-03-24
End Date: 2015-11-20
Contract Duration: 1,336 days
Daily Burn Rate: $35.4K/day
Official Description: CONSTRUCTION OF A MANEUVER SYSTEMS SUSTAINMENT CENTER (MSSC) FOR TACTICAL WHEELED VEHICLES COMPLETE REBUILD&ASSEMBLY RECAPITALIZATION) AT RED RIVER ARMY DEPOT, TEXARKANA, TEXAS. THIS INCLUDES CONSTRUCTION OF THE ASSEMBLY BUILDING, HARDSTAND AND COVERED STAGING/FUEL AREA WITH AN APPROXIMATE SIZE OF OVER 200,000 SF. ANTITERRORISM/FORCE PROTECTION MEASURES INCLUDE A MASS NOTIFICATION SYSTEM. PROJECT ALSO INCLUDES FIRE PROTECTION SYSTEMS THAT CONNECT TO THE INSTALLATION'S CENTRAL SYSTEM, FUTURE CONNECTION CAPABILITY OF BUILDING AUTOMATION SYSTEMS TO A DEPOT-WIDE CENTRAL ENERGY MONITORING AND CONTROL SYSTEM (EMCS), AND BUILDING INFORMATION SYSTEMS. SUPPORTING FACILITIES INCLUDE CONNECTIONS TO ALL REQUIRED UTILITIES (INDUSTRIAL AND DOMESTIC), EXTERIOR LIGHTING, LIGHTNING PROTECTION, LOADING AREAS, STORM WATER MANAGEMENT, AND SITE WORK. SPECIAL FOUNDATIONS ARE REQUIRED AS IS REQUIREMENTS FOR SPECIALIZED PROCESSES INVOLVING HAZARDOUS CHEMICALS AND SPECIALIZED CONSTRUCTION FOR FOLLOW ON EQUIPMENT LAYOUT, AND COORDINATION WITH MULTIPLE CONTRACTORS. HEATING AND AIR CONDITIONING WILL BE PROVIDED BY SELF-CONTAINED UNITS. ACCESS FOR INDIVIDUALS WITH DISABILITIES WILL BE PROVIDED. SUSTAINABLE DESIGN AND DEVELOPMENT (SDD) AND ENERGY POLICY ACT OF 2005 (EPACT05) FEATURES WILL BE PROVIDED; A SILVER RATING IN LEED 2.2 IS REQUIRED TO BE CERTIFIED. AIR CONDITIONING (ESTIMATED 40 TONS).
Place of Performance
Location: Texas, 75503