Army Awards $34.7M Barracks Construction Contract to Watterson Construction
Contract Overview
Contract Amount: $34,742,676 ($34.7M)
Contractor: Watterson Construction CO
Awarding Agency: Department of Defense
Start Date: 2008-08-11
End Date: 2010-10-18
Contract Duration: 798 days
Daily Burn Rate: $43.5K/day
Competition Type: FULL AND OPEN COMPETITION
Number of Offers Received: 1
Pricing Type: FIRM FIXED PRICE
Sector: Construction
Official Description: CONSTRUCT UEPH BARRACKS FTR 196
Place of Performance
Location: ELMENDORF AFB, ANCHORAGE County, ALASKA, 99506
State: Alaska Government Spending
Plain-Language Summary
Department of Defense obligated $34.7 million to WATTERSON CONSTRUCTION CO for work described as: CONSTRUCT UEPH BARRACKS FTR 196 Key points: 1. Contract awarded for construction of barracks at Fort Richardson, Alaska. 2. Full and open competition was utilized, suggesting a competitive bidding process. 3. The contract value is $34.7 million, with a duration of 798 days. 4. No small business participation was noted in this award.
Value Assessment
Rating: good
The contract value of $34.7 million for barracks construction appears reasonable given the scale and duration. Benchmarking against similar large-scale construction projects would provide a more precise assessment.
Cost Per Unit: N/A
Competition Analysis
Competition Level: full-and-open
The use of full and open competition indicates that multiple bidders were likely considered, which typically drives better pricing and value for the government. The award to Watterson Construction suggests they offered the best value under the established criteria.
Taxpayer Impact: The competitive nature of the award is expected to result in a fair price, maximizing taxpayer value for this essential infrastructure project.
Public Impact
Improved living conditions for soldiers at Fort Richardson. Supports military readiness and personnel retention. Economic impact through construction jobs and local spending in Alaska.
Waste & Efficiency Indicators
Waste Risk Score: 50 / 10
Warning Flags
- No small business participation noted.
- Long project duration could introduce cost escalation risks.
Positive Signals
- Full and open competition utilized.
- Firm fixed price contract provides cost certainty.
Sector Analysis
This contract falls within the Commercial and Institutional Building Construction sector. Spending in this sector is crucial for maintaining and upgrading military infrastructure, with typical project values varying widely based on scope and location.
Small Business Impact
The data indicates no small business participation in this specific contract award. While not always feasible or required, exploring opportunities for small business involvement in future construction projects could be beneficial.
Oversight & Accountability
The award was made by the Department of the Army, a component of the Department of Defense. Standard procurement oversight processes would apply to ensure compliance and accountability throughout the contract lifecycle.
Related Government Programs
- Commercial and Institutional Building Construction
- Department of Defense Contracting
- Department of the Army Programs
Risk Flags
- No small business participation.
- Long project duration.
- Potential for weather-related delays in Alaska.
- Firm Fixed Price contract limits flexibility for scope changes.
Tags
commercial-and-institutional-building-co, department-of-defense, ak, dca, 10m-plus
Frequently Asked Questions
What is this federal contract paying for?
Department of Defense awarded $34.7 million to WATTERSON CONSTRUCTION CO. CONSTRUCT UEPH BARRACKS FTR 196
Who is the contractor on this award?
The obligated recipient is WATTERSON CONSTRUCTION CO.
Which agency awarded this contract?
Awarding agency: Department of Defense (Department of the Army).
What is the total obligated amount?
The obligated amount is $34.7 million.
What is the period of performance?
Start: 2008-08-11. End: 2010-10-18.
What was the basis for selecting Watterson Construction Co. under full and open competition?
Under full and open competition, the selection is typically based on a combination of factors, including technical approach, past performance, and price. The Department of the Army would have evaluated proposals against pre-defined criteria to determine which offer provided the best overall value, not necessarily the lowest price alone. Specific details would be found in the contract award documentation.
Are there any identified risks associated with the 798-day duration of this construction project?
A project duration of 798 days (over two years) presents inherent risks such as potential cost escalation due to inflation, material price fluctuations, and unforeseen site conditions. Weather in Alaska can also significantly impact construction timelines. The firm fixed price contract helps mitigate some financial risk, but schedule delays could still occur.
How does this barracks construction project contribute to the overall effectiveness of Fort Richardson?
Modern, well-maintained barracks are critical for soldier morale, health, and readiness. This project directly enhances the quality of life for service members stationed at Fort Richardson, contributing to retention and overall mission effectiveness. It ensures adequate and appropriate housing infrastructure is available to support the base's operational requirements.
Industry Classification
NAICS: Construction › Nonresidential Building Construction › Commercial and Institutional Building Construction
Product/Service Code: CONSTRUCT OF STRUCTURES/FACILITIES › CONSTRUCTION OF BUILDINGS
Competition & Pricing
Extent Competed: FULL AND OPEN COMPETITION
Solicitation Procedures: NEGOTIATED PROPOSAL/QUOTE
Solicitation ID: W911KB08R0004
Offers Received: 1
Pricing Type: FIRM FIXED PRICE (J)
Evaluated Preference: NONE
Contractor Details
Address: 6500 INTERSTATE CIR, ANCHORAGE, AK, 00
Business Categories: Category Business, Corporate Entity Not Tax Exempt, Not Designated a Small Business
Financial Breakdown
Contract Ceiling: $36,842,676
Exercised Options: $34,742,676
Current Obligation: $34,742,676
Contract Characteristics
Cost or Pricing Data: NO
Timeline
Start Date: 2008-08-11
Current End Date: 2010-10-18
Potential End Date: 2010-10-18 00:00:00
Last Modified: 2010-09-30
More Contracts from Watterson Construction CO
- Eie382-Construct F-35A Aircraft Weather Shelter, Squad #2, Eielson AFB, AK — $85.5M (Department of Defense)
- Design and Construct General Support Aviation Battalion Hangar AT Fort Wainwright, Alaska — $71.5M (Department of Defense)
- Construct 1 + 1 Barracks, FTW360 — $70.4M (Department of Defense)
- Design and Construct Assault, Attack, Cavalry (AAC) Hangar for the Aviation Task Force on Fort Wainwright, Alaska — $68.0M (Department of Defense)
- Design and Construct F-35A Aircraft Weather Shelter Squadron #1, Eielson AFB, Alaska (EIE378) — $59.0M (Department of Defense)
Other Department of Defense Contracts
- Federal Contract — $51.3B (Humana Government Business Inc)
- Lrip LOT 12 Advance Acquisition Contract — $35.1B (Lockheed Martin Corporation)
- SSN 802 and 803 Long Lead Time Material — $34.7B (Electric Boat Corporation)
- 200204!008532!1700!AF600 !naval AIR Systems Command !N0001902C3002 !A!N! !N! !20011026!20120430!008016958!008016958!834951691!n!lockheed Martin Corporation !lockheed Blvd !fort Worth !tx!76108!27000!439!48!fort Worth !tarrant !texas !+000026000000!n!n!018981928201!ac15!rdte/Aircraft-Eng/Manuf Develop !a1a!airframes and Spares !2ama!jast/Jsf !336411!E! !3! ! ! ! ! !99990909!B! ! !A! !a!n!r!2!002!n!1a!a!n!z! ! !N!C!N! ! ! !a!a!a!a!000!a!c!n! ! ! !Y! !N00019!0001! — $34.2B (Lockheed Martin Corporation)
- KC-X Modernization Program — $32.0B (THE Boeing Company)