DoD Awards $24M for Camp Hadrian Construction, Full and Open Competition Used
Contract Overview
Contract Amount: $23,968,643 ($24.0M)
Contractor: Domestic Awardees (undisclosed)
Awarding Agency: Department of Defense
Start Date: 2012-01-20
End Date: 2013-12-15
Contract Duration: 695 days
Daily Burn Rate: $34.5K/day
Competition Type: FULL AND OPEN COMPETITION
Number of Offers Received: 4
Pricing Type: FIRM FIXED PRICE
Sector: Construction
Official Description: ANA 1/4/205TH DEH RAWOOD (CAMP HADRAIN)
Plain-Language Summary
Department of Defense obligated $24.0 million to DOMESTIC AWARDEES (UNDISCLOSED) for work described as: ANA 1/4/205TH DEH RAWOOD (CAMP HADRAIN) Key points: 1. Spending focused on construction for a military installation. 2. Full and open competition was utilized, suggesting a competitive bidding process. 3. The contract type is Firm Fixed Price, which shifts cost risk to the contractor. 4. No small business participation was reported, which could be a missed opportunity.
Value Assessment
Rating: fair
The contract value of $23.97M for construction services appears within a reasonable range for a project of this nature, though specific benchmarks are unavailable without more detailed project scope.
Cost Per Unit: N/A
Competition Analysis
Competition Level: full-and-open
The use of full and open competition is a positive indicator for price discovery, as it allows all eligible bidders to participate. This method generally leads to more competitive pricing.
Taxpayer Impact: The competitive nature of the award suggests taxpayers likely received a fair price for the construction services rendered.
Public Impact
Military readiness and infrastructure are enhanced by this construction project. Local economic impact through construction jobs and material sourcing is likely. The project contributes to the Department of Defense's operational capabilities.
Waste & Efficiency Indicators
Waste Risk Score: 50 / 10
Warning Flags
- Lack of small business participation.
- Undisclosed domestic awardees limit transparency.
- No specific performance metrics provided.
Positive Signals
- Full and open competition utilized.
- Firm Fixed Price contract type manages cost risk.
- Clear contract duration and start/end dates.
Sector Analysis
This contract falls within the Construction sector, specifically for institutional buildings. Spending benchmarks for military construction vary widely based on location, scope, and specific requirements.
Small Business Impact
The contract was not awarded to small businesses, indicating a potential lack of outreach or opportunity for these entities in this specific procurement. Further analysis could explore reasons for non-participation.
Oversight & Accountability
The Department of the Army managed this procurement. Oversight effectiveness would depend on contract administration, quality assurance, and adherence to project timelines and specifications.
Related Government Programs
- Commercial and Institutional Building Construction
- Department of Defense Contracting
- Department of the Army Programs
Risk Flags
- Lack of transparency regarding awardee identity.
- Absence of small business participation.
- No detailed breakdown of construction scope.
- Potential for cost overruns if not managed tightly despite FFP.
Tags
commercial-and-institutional-building-co, department-of-defense, definitive-contract, 10m-plus
Frequently Asked Questions
What is this federal contract paying for?
Department of Defense awarded $24.0 million to DOMESTIC AWARDEES (UNDISCLOSED). ANA 1/4/205TH DEH RAWOOD (CAMP HADRAIN)
Who is the contractor on this award?
The obligated recipient is DOMESTIC AWARDEES (UNDISCLOSED).
Which agency awarded this contract?
Awarding agency: Department of Defense (Department of the Army).
What is the total obligated amount?
The obligated amount is $24.0 million.
What is the period of performance?
Start: 2012-01-20. End: 2013-12-15.
What specific construction activities were included in this $24M contract, and how do they align with the needs of Camp Hadrian?
The provided data does not detail the specific construction activities. A comprehensive understanding would require reviewing the contract's Statement of Work (SOW) or Performance Work Statement (PWS). This would clarify if the spending directly addresses critical infrastructure needs, modernization efforts, or new facility development at Camp Hadrian, ensuring the funds are optimally allocated for military operational effectiveness.
Given the full and open competition, what was the range of bids received, and how did the winning bid compare to the government's estimate?
The data does not include the bid range or the government's estimate. To assess the effectiveness of the competition and price discovery, it would be crucial to know how many bids were submitted and the variance between them. Comparing the winning bid to the estimate would reveal if the competitive process yielded significant savings or if the estimate was inaccurate.
What are the long-term implications of this construction project for the operational capacity and maintenance costs at Camp Hadrian?
The long-term implications are not detailed in the provided data. The construction likely aims to improve or expand operational capacity. However, without information on the type of facilities built or upgraded, assessing future maintenance costs, energy efficiency, or the project's contribution to long-term readiness is speculative. A review of the project's scope and expected lifespan would be necessary.
Industry Classification
NAICS: Construction › Nonresidential Building Construction › Commercial and Institutional Building Construction
Product/Service Code: CONSTRUCT OF STRUCTURES/FACILITIES › CONSTRUCTION OF BUILDINGS
Competition & Pricing
Extent Competed: FULL AND OPEN COMPETITION
Solicitation Procedures: SEALED BID
Solicitation ID: W5J9LE12B0002
Offers Received: 4
Pricing Type: FIRM FIXED PRICE (J)
Evaluated Preference: NONE
Contractor Details
Address: 1800 F ST NW, WASHINGTON, DC, 20405
Business Categories: Category Business, Not Designated a Small Business, Special Designations, U.S.-Owned Business
Financial Breakdown
Contract Ceiling: $23,968,643
Exercised Options: $23,968,643
Current Obligation: $23,968,643
Contract Characteristics
Commercial Item: COMMERCIAL ITEM PROCEDURES NOT USED
Cost or Pricing Data: NO
Timeline
Start Date: 2012-01-20
Current End Date: 2013-12-15
Potential End Date: 2013-12-15 00:00:00
Last Modified: 2021-08-21
More Contracts from Domestic Awardees (undisclosed)
- Overseas Contract — $920.0M (Agency for International Development)
- Afghanistan Ministry of Interior/Afghan National Police Mentoring&training With Life Support Services — $876.2M (Department of Defense)
- Tasm-O Aviation Field Maintenance Igf::ot::igf — $870.9M (Department of Defense)
- Overseas Contract — $817.4M (Department of State)
- Overseas Contract — $806.0M (Department of State)
View all Domestic Awardees (undisclosed) federal contracts →
Other Department of Defense Contracts
- Federal Contract — $51.3B (Humana Government Business Inc)
- Lrip LOT 12 Advance Acquisition Contract — $35.1B (Lockheed Martin Corporation)
- SSN 802 and 803 Long Lead Time Material — $34.7B (Electric Boat Corporation)
- 200204!008532!1700!AF600 !naval AIR Systems Command !N0001902C3002 !A!N! !N! !20011026!20120430!008016958!008016958!834951691!n!lockheed Martin Corporation !lockheed Blvd !fort Worth !tx!76108!27000!439!48!fort Worth !tarrant !texas !+000026000000!n!n!018981928201!ac15!rdte/Aircraft-Eng/Manuf Develop !a1a!airframes and Spares !2ama!jast/Jsf !336411!E! !3! ! ! ! ! !99990909!B! ! !A! !a!n!r!2!002!n!1a!a!n!z! ! !N!C!N! ! ! !a!a!a!a!000!a!c!n! ! ! !Y! !N00019!0001! — $34.2B (Lockheed Martin Corporation)
- KC-X Modernization Program — $32.0B (THE Boeing Company)