DoD Awards $13.5M for Ecuador King Air 360 Integration to Science and Engineering Services, LLC
Contract Overview
Contract Amount: $13,557,015 ($13.6M)
Contractor: Science and Engineering Services, LLC
Awarding Agency: Department of Defense
Start Date: 2023-09-22
End Date: 2026-06-30
Contract Duration: 1,012 days
Daily Burn Rate: $13.4K/day
Competition Type: FULL AND OPEN COMPETITION AFTER EXCLUSION OF SOURCES
Number of Offers Received: 3
Pricing Type: COST PLUS FIXED FEE
Sector: Defense
Official Description: ECUADOR KING AIR 360 INTEGRATION
Place of Performance
Location: HUNTSVILLE, MADISON County, ALABAMA, 35824
State: Alabama Government Spending
Plain-Language Summary
Department of Defense obligated $13.6 million to SCIENCE AND ENGINEERING SERVICES, LLC for work described as: ECUADOR KING AIR 360 INTEGRATION Key points: 1. Contract awarded to Science and Engineering Services, LLC for aircraft integration. 2. The contract value is $13.56 million. 3. Competition was full and open after exclusion of sources. 4. The sector is Aircraft Manufacturing, with a PSC of 336411. 5. The contract duration is 1012 days.
Value Assessment
Rating: fair
The contract is a Cost Plus Fixed Fee type, which can lead to cost overruns if not managed carefully. The awarded amount of $13.56M needs to be benchmarked against similar integration projects for King Air 360 aircraft.
Cost Per Unit: N/A
Competition Analysis
Competition Level: limited
The competition was 'Full and Open Competition After Exclusion of Sources,' indicating a specific reason for excluding certain sources. This method might limit price discovery compared to truly unrestricted full and open competition.
Taxpayer Impact: Taxpayer funds are being used for aircraft integration services. The effectiveness of the competition method in securing the best value for taxpayers is a key consideration.
Public Impact
Enhances military aviation capabilities through specialized aircraft integration. Supports advanced technology deployment in defense operations. Potential for job creation within the aerospace and defense sector.
Waste & Efficiency Indicators
Waste Risk Score: 50 / 10
Warning Flags
- Cost Plus Fixed Fee contract type can incentivize higher costs.
- Limited competition may not yield the lowest possible price.
- Exclusion of sources requires clear justification to ensure fairness.
Positive Signals
- Award to a specific company for specialized integration services.
- Clear project scope and defined end dates.
- Contract awarded by the Department of the Army.
Sector Analysis
This contract falls within the Aircraft Manufacturing sector, specifically focusing on integration services for a particular aircraft model. Spending benchmarks in this niche area are crucial for evaluating the contract's value.
Small Business Impact
The data indicates that small business participation was not a factor in this specific award (ss: false, sb: false). Further analysis would be needed to determine if subcontracting opportunities exist for small businesses.
Oversight & Accountability
The Department of the Army is responsible for oversight. The contract type and competition method warrant scrutiny to ensure accountability and efficient use of funds.
Related Government Programs
- Aircraft Manufacturing
- Department of Defense Contracting
- Department of the Army Programs
Risk Flags
- Cost Plus Fixed Fee contract type.
- Limited competition due to source exclusion.
- Potential for cost overruns without stringent oversight.
- Lack of small business participation noted.
Tags
aircraft-manufacturing, department-of-defense, al, delivery-order, 10m-plus
Frequently Asked Questions
What is this federal contract paying for?
Department of Defense awarded $13.6 million to SCIENCE AND ENGINEERING SERVICES, LLC. ECUADOR KING AIR 360 INTEGRATION
Who is the contractor on this award?
The obligated recipient is SCIENCE AND ENGINEERING SERVICES, LLC.
Which agency awarded this contract?
Awarding agency: Department of Defense (Department of the Army).
What is the total obligated amount?
The obligated amount is $13.6 million.
What is the period of performance?
Start: 2023-09-22. End: 2026-06-30.
What is the specific justification for excluding certain sources in this 'Full and Open Competition After Exclusion of Sources' award, and how does this impact the overall value proposition for the go
The justification for excluding sources typically relates to unique capabilities, proprietary technology, or specific security requirements that only certain contractors can meet. While this can ensure specialized needs are addressed, it may limit the pool of bidders, potentially impacting price competition and the government's ability to secure the most cost-effective solution. A thorough review of the exclusion rationale is necessary to confirm it aligns with mission requirements and doesn't unduly restrict competition.
How does the Cost Plus Fixed Fee (CPFF) contract structure for this $13.56 million award mitigate risks associated with potential cost overruns during the 1012-day integration period?
A CPFF contract allows the contractor to recover all allowable costs plus a predetermined fixed fee representing profit. While the fixed fee provides some incentive for efficiency, the primary risk mitigation relies on robust government oversight, detailed cost tracking, and clear definition of allowable costs. The government must actively monitor expenditures to prevent scope creep and ensure costs remain reasonable and allocable to the contract's objectives throughout the project lifecycle.
What are the key performance indicators (KPIs) and metrics used to assess the effectiveness of the Ecuador King Air 360 integration, and how will the success of Science and Engineering Services, LLC b
Effectiveness will likely be measured against technical performance specifications, successful integration of required systems, operational readiness of the modified aircraft, and adherence to project timelines and budget constraints. Key Performance Indicators might include system functionality tests, flight performance data post-integration, and successful completion of acceptance trials. The government will monitor these KPIs to ensure the contractor meets all contractual obligations and delivers a fully functional and integrated aircraft.
Industry Classification
NAICS: Manufacturing › Aerospace Product and Parts Manufacturing › Aircraft Manufacturing
Product/Service Code: AEROSPACE CRAFT COMPONENTS AND ACCESSORIES
Competition & Pricing
Extent Competed: FULL AND OPEN COMPETITION AFTER EXCLUSION OF SOURCES
Solicitation Procedures: SUBJECT TO MULTIPLE AWARD FAIR OPPORTUNITY
Offers Received: 3
Pricing Type: COST PLUS FIXED FEE (U)
Evaluated Preference: NONE
Contractor Details
Address: 248 DUNLOP BLVD, HUNTSVILLE, AL, 35824
Business Categories: Asian Pacific American Owned Business, Category Business, Limited Liability Corporation, Minority Owned Business, Small Business, Special Designations, U.S.-Owned Business
Financial Breakdown
Contract Ceiling: $14,219,509
Exercised Options: $13,557,015
Current Obligation: $13,557,015
Subaward Activity
Number of Subawards: 9
Total Subaward Amount: $9,733,878
Contract Characteristics
Commercial Item: COMMERCIAL PRODUCTS/SERVICES PROCEDURES NOT USED
Cost or Pricing Data: NO
Parent Contract
Parent Award PIID: W58RGZ19D0045
IDV Type: IDC
Timeline
Start Date: 2023-09-22
Current End Date: 2026-06-30
Potential End Date: 2026-07-18 12:07:00
Last Modified: 2025-11-20
More Contracts from Science and Engineering Services, LLC
- THE Contractor Shall Perform UH-60 Aircraft Qualification Training (AQT) and Perform ALL Scheduled and Unscheduled Maintenance on UH-60 Helicopters Based OUT of Main Operating Base (MOB) Kandahar With the Capability to Support Forward Operating Bases (FOB) — $147.7M (Department of Defense)
- Mumt Phase II — $118.7M (Department of Defense)
- Conversion of Army UH-60L Black Hawk Helicopters to AIR Force HH-60G Helicopters — $116.6M (Department of Defense)
- Multirole Enforcement Aircraft Land Interdiction (MEA LI) - Quantity 1 — $85.1M (Department of Homeland Security)
- Effort Required for Installation, Validation/ Verification, and Maintenance of the Ch-47f/Ich-47f Modification and Upgrade Program to Include 17 UAE Aircraft — $83.2M (Department of Defense)
View all Science and Engineering Services, LLC federal contracts →
Other Department of Defense Contracts
- Federal Contract — $51.3B (Humana Government Business Inc)
- Lrip LOT 12 Advance Acquisition Contract — $35.1B (Lockheed Martin Corporation)
- SSN 802 and 803 Long Lead Time Material — $34.7B (Electric Boat Corporation)
- 200204!008532!1700!AF600 !naval AIR Systems Command !N0001902C3002 !A!N! !N! !20011026!20120430!008016958!008016958!834951691!n!lockheed Martin Corporation !lockheed Blvd !fort Worth !tx!76108!27000!439!48!fort Worth !tarrant !texas !+000026000000!n!n!018981928201!ac15!rdte/Aircraft-Eng/Manuf Develop !a1a!airframes and Spares !2ama!jast/Jsf !336411!E! !3! ! ! ! ! !99990909!B! ! !A! !a!n!r!2!002!n!1a!a!n!z! ! !N!C!N! ! ! !a!a!a!a!000!a!c!n! ! ! !Y! !N00019!0001! — $34.2B (Lockheed Martin Corporation)
- KC-X Modernization Program — $32.0B (THE Boeing Company)