DoD Awards $37.8M for CH-47F Helicopter Upgrade Program to Science and Engineering Services, LLC
Contract Overview
Contract Amount: $37,776,038 ($37.8M)
Contractor: Science and Engineering Services, LLC
Awarding Agency: Department of Defense
Start Date: 2018-12-19
End Date: 2022-03-31
Contract Duration: 1,198 days
Daily Burn Rate: $31.5K/day
Competition Type: FULL AND OPEN COMPETITION AFTER EXCLUSION OF SOURCES
Number of Offers Received: 1
Pricing Type: COST PLUS FIXED FEE
Sector: Defense
Official Description: DESIGN NONRECURRING ENGINEERING FABRICATION INSTALLATION VALIDATION VERIFICATION MAINTENANCE AND TRAINING OF THE CH47F ICH47F MODIFICATION AND UPGRADE PROGRAM THE CONTRACTOR SHALL PROCURE THE REQUIRED MATERIAL FOR TWO UAE AIRCRAFT AND MODIFY ONE AIRCRAFT IN GROUP B AND ONE AIRCRAFT IN GROUP C
Place of Performance
Location: HUNTSVILLE, MADISON County, ALABAMA, 35824
State: Alabama Government Spending
Plain-Language Summary
Department of Defense obligated $37.8 million to SCIENCE AND ENGINEERING SERVICES, LLC for work described as: DESIGN NONRECURRING ENGINEERING FABRICATION INSTALLATION VALIDATION VERIFICATION MAINTENANCE AND TRAINING OF THE CH47F ICH47F MODIFICATION AND UPGRADE PROGRAM THE CONTRACTOR SHALL PROCURE THE REQUIRED MATERIAL FOR TWO UAE AIRCRAFT AND MODIFY ONE AIRCRAFT IN GROUP B AND ONE AIRCRA… Key points: 1. Contract awarded for CH-47F helicopter modification and upgrade program. 2. Includes design, fabrication, installation, and training for UAE aircraft. 3. Competition method was 'Full and Open Competition after Exclusion of Sources'. 4. Sector is Aircraft Manufacturing, with a focus on defense spending.
Value Assessment
Rating: fair
The contract type is Cost Plus Fixed Fee, which can lead to cost overruns if not managed carefully. The total award amount is $37.8M, but without specific performance metrics or benchmarks, assessing value is difficult.
Cost Per Unit: N/A
Competition Analysis
Competition Level: limited
The competition was 'Full and Open Competition after Exclusion of Sources,' indicating some limitations on the pool of eligible bidders. This method may not have yielded the most competitive pricing.
Taxpayer Impact: Taxpayer funds are being used for a critical defense upgrade program, with the ultimate impact on national security and operational readiness.
Public Impact
Enhances capabilities of the CH-47F Chinook helicopter fleet. Supports military readiness and operational effectiveness. Contributes to the modernization of aviation assets. Potential for job creation in the aerospace manufacturing sector.
Waste & Efficiency Indicators
Waste Risk Score: 50 / 10
Warning Flags
- Cost Plus Fixed Fee contract type can incentivize contractor to increase costs.
- Limited competition may result in suboptimal pricing.
- Lack of detailed performance metrics makes value assessment challenging.
Positive Signals
- Addresses critical upgrade needs for a key military asset.
- Supports national defense objectives.
- Contract awarded to a specific company for a defined program.
Sector Analysis
This contract falls within the Aircraft Manufacturing sector, specifically supporting defense aviation. Spending in this area is driven by military modernization needs and geopolitical factors. Benchmarks for similar upgrade programs would be necessary for a more precise comparison.
Small Business Impact
The data indicates this contract was not awarded to small businesses (sb: false). Therefore, there is no direct benefit to small businesses from this specific award.
Oversight & Accountability
Oversight would typically be managed by the Department of the Army, ensuring adherence to contract terms, performance standards, and budget. Accountability rests with the contractor to deliver the specified modifications and training.
Related Government Programs
- Aircraft Manufacturing
- Department of Defense Contracting
- Department of the Army Programs
Risk Flags
- Potential for cost overruns due to CPFF contract type.
- Limited competition may lead to higher prices.
- Lack of detailed performance metrics for value assessment.
- Contract duration is substantial (1198 days), increasing exposure to changing requirements or economic conditions.
Tags
aircraft-manufacturing, department-of-defense, al, delivery-order, 10m-plus
Frequently Asked Questions
What is this federal contract paying for?
Department of Defense awarded $37.8 million to SCIENCE AND ENGINEERING SERVICES, LLC. DESIGN NONRECURRING ENGINEERING FABRICATION INSTALLATION VALIDATION VERIFICATION MAINTENANCE AND TRAINING OF THE CH47F ICH47F MODIFICATION AND UPGRADE PROGRAM THE CONTRACTOR SHALL PROCURE THE REQUIRED MATERIAL FOR TWO UAE AIRCRAFT AND MODIFY ONE AIRCRAFT IN GROUP B AND ONE AIRCRAFT IN GROUP C
Who is the contractor on this award?
The obligated recipient is SCIENCE AND ENGINEERING SERVICES, LLC.
Which agency awarded this contract?
Awarding agency: Department of Defense (Department of the Army).
What is the total obligated amount?
The obligated amount is $37.8 million.
What is the period of performance?
Start: 2018-12-19. End: 2022-03-31.
What is the expected increase in operational capability or efficiency for the CH-47F helicopter post-modification?
The specific improvements in operational capability or efficiency are not detailed in the provided data. Typically, such upgrades aim to enhance payload capacity, range, avionics, or survivability. A thorough analysis would require access to the program's technical specifications and performance goals to quantify the expected benefits.
What are the primary risks associated with the 'Full and Open Competition after Exclusion of Sources' method for this contract?
The primary risk is a potentially reduced pool of qualified bidders compared to unrestricted full and open competition, which could lead to less competitive pricing. It might also limit the government's ability to discover innovative solutions from a wider range of contractors, potentially impacting overall value and technological advancement.
How does the Cost Plus Fixed Fee (CPFF) contract structure impact the government's cost control for this program?
A CPFF structure shifts some of the cost risk to the government, as the contractor is reimbursed for allowable costs plus a fixed fee. While the fee is fixed, the total cost can escalate if actual costs exceed estimates. Effective government oversight is crucial to control allowable costs and prevent budget overruns.
Industry Classification
NAICS: Manufacturing › Aerospace Product and Parts Manufacturing › Aircraft Manufacturing
Product/Service Code: AEROSPACE CRAFT COMPONENTS AND ACCESSORIES
Competition & Pricing
Extent Competed: FULL AND OPEN COMPETITION AFTER EXCLUSION OF SOURCES
Solicitation Procedures: SUBJECT TO MULTIPLE AWARD FAIR OPPORTUNITY
Offers Received: 1
Pricing Type: COST PLUS FIXED FEE (U)
Evaluated Preference: NONE
Contractor Details
Address: 248 DUNLOP BLVD, HUNTSVILLE, AL, 35824
Business Categories: Asian Pacific American Owned Business, Category Business, Limited Liability Corporation, Minority Owned Business, Small Business, Special Designations, U.S.-Owned Business
Financial Breakdown
Contract Ceiling: $37,776,038
Exercised Options: $37,776,038
Current Obligation: $37,776,038
Subaward Activity
Number of Subawards: 28
Total Subaward Amount: $79,035,704
Contract Characteristics
Commercial Item: COMMERCIAL PRODUCTS/SERVICES PROCEDURES NOT USED
Cost or Pricing Data: NO
Parent Contract
Parent Award PIID: W58RGZ13D0048
IDV Type: IDC
Timeline
Start Date: 2018-12-19
Current End Date: 2022-03-31
Potential End Date: 2022-03-31 00:00:00
Last Modified: 2025-07-08
More Contracts from Science and Engineering Services, LLC
- THE Contractor Shall Perform UH-60 Aircraft Qualification Training (AQT) and Perform ALL Scheduled and Unscheduled Maintenance on UH-60 Helicopters Based OUT of Main Operating Base (MOB) Kandahar With the Capability to Support Forward Operating Bases (FOB) — $147.7M (Department of Defense)
- Mumt Phase II — $118.7M (Department of Defense)
- Conversion of Army UH-60L Black Hawk Helicopters to AIR Force HH-60G Helicopters — $116.6M (Department of Defense)
- Multirole Enforcement Aircraft Land Interdiction (MEA LI) - Quantity 1 — $85.1M (Department of Homeland Security)
- Effort Required for Installation, Validation/ Verification, and Maintenance of the Ch-47f/Ich-47f Modification and Upgrade Program to Include 17 UAE Aircraft — $83.2M (Department of Defense)
View all Science and Engineering Services, LLC federal contracts →
Other Department of Defense Contracts
- Federal Contract — $51.3B (Humana Government Business Inc)
- Lrip LOT 12 Advance Acquisition Contract — $35.1B (Lockheed Martin Corporation)
- SSN 802 and 803 Long Lead Time Material — $34.7B (Electric Boat Corporation)
- 200204!008532!1700!AF600 !naval AIR Systems Command !N0001902C3002 !A!N! !N! !20011026!20120430!008016958!008016958!834951691!n!lockheed Martin Corporation !lockheed Blvd !fort Worth !tx!76108!27000!439!48!fort Worth !tarrant !texas !+000026000000!n!n!018981928201!ac15!rdte/Aircraft-Eng/Manuf Develop !a1a!airframes and Spares !2ama!jast/Jsf !336411!E! !3! ! ! ! ! !99990909!B! ! !A! !a!n!r!2!002!n!1a!a!n!z! ! !N!C!N! ! ! !a!a!a!a!000!a!c!n! ! ! !Y! !N00019!0001! — $34.2B (Lockheed Martin Corporation)
- KC-X Modernization Program — $32.0B (THE Boeing Company)