Includes the Abatement of Asbestos and Lead Throughout the First Floor and Abaatement Above the Ceilings on the Second and Third Floors of the Tower Unit, Upgrade of the Electrical Lighting and Power Distribution Circuiting, Installation of a NEW Fire Sprinkler System Upgrade the Fire Alarm System, Structural Diagonal Bracing AT the Exterior Walls, Inspection of the Moment Connections and Renovation of the Clinical LAB and Retail Pharmacy
Contract Overview
Contract Amount: $25,558,237 ($25.6M)
Contractor: Ames Corp.-Dawson Building Contractors Inc, a Joint Venture
Awarding Agency: Department of Veterans Affairs
Start Date: 2004-09-30
End Date: 2021-06-14
Contract Duration: 6,101 days
Daily Burn Rate: $4.2K/day
Official Description: INCLUDES THE ABATEMENT OF ASBESTOS AND LEAD THROUGHOUT THE FIRST FLOOR AND ABAATEMENT ABOVE THE CEILINGS ON THE SECOND AND THIRD FLOORS OF THE TOWER UNIT, UPGRADE OF THE ELECTRICAL LIGHTING AND POWER DISTRIBUTION CIRCUITING, INSTALLATION OF A NEW FIRE SPRINKLER SYSTEM UPGRADE THE FIRE ALARM SYSTEM, STRUCTURAL DIAGONAL BRACING AT THE EXTERIOR WALLS, INSPECTION OF THE MOMENT CONNECTIONS AND RENOVATION OF THE CLINICAL LAB AND RETAIL PHARMACY.
Place of Performance
Location: California, 95655