THE Services Being Procured Include Management, Engineering, Design and Technical Support to Ensure Acquisition and Installation Milestones and Installation Deliveries ARE Tracked, MET and Approved I.E.: Facilitate and Coordinate the Development of Ship Change Documents (SCD), Review and Approve Installation Control Drawings (ICD), and Installation Requirements Drawing (IRD) and Validated/Provide Quality Assurance (Q/A) on Ship Installation Drawings (sids)
Contract Overview
Contract Amount: $20,361,782 ($20.4M)
Contractor: Koam Engineering Systems, Inc.
Awarding Agency: Department of Defense
Start Date: 2011-02-07
End Date: 2015-02-06
Contract Duration: 1,460 days
Daily Burn Rate: $13.9K/day
Official Description: THE SERVICES BEING PROCURED INCLUDE MANAGEMENT, ENGINEERING, DESIGN AND TECHNICAL SUPPORT TO ENSURE ACQUISITION AND INSTALLATION MILESTONES AND INSTALLATION DELIVERIES ARE TRACKED, MET AND APPROVED I.E.: FACILITATE AND COORDINATE THE DEVELOPMENT OF SHIP CHANGE DOCUMENTS (SCD), REVIEW AND APPROVE INSTALLATION CONTROL DRAWINGS (ICD), AND INSTALLATION REQUIREMENTS DRAWING (IRD) AND VALIDATED/PROVIDE QUALITY ASSURANCE (Q/A) ON SHIP INSTALLATION DRAWINGS (SIDS).
Place of Performance
Location: California, 92111