DoD Awards $15.6M for Prediction Engineering and Software Development to Peraton Inc
Contract Overview
Contract Amount: $15,578,754 ($15.6M)
Contractor: Peraton Inc.
Awarding Agency: Department of Defense
Start Date: 2023-06-07
End Date: 2026-06-06
Contract Duration: 1,095 days
Daily Burn Rate: $14.2K/day
Competition Type: FULL AND OPEN COMPETITION
Number of Offers Received: 1
Pricing Type: COST PLUS FIXED FEE
Sector: R&D
Official Description: OCEAN DYNAMICS, PREDICTION ENGINEERING AND SOFTWARE DEVELOPMENT
Place of Performance
Location: STENNIS SPACE CENTER, HANCOCK County, MISSISSIPPI, 39529
Plain-Language Summary
Department of Defense obligated $15.6 million to PERATON INC. for work described as: OCEAN DYNAMICS, PREDICTION ENGINEERING AND SOFTWARE DEVELOPMENT Key points: 1. Contract awarded to Peraton Inc. for prediction engineering and software development. 2. Significant award value of $15.6 million. 3. Competition method was 'FULL AND OPEN COMPETITION'. 4. Contract falls under NAICS code 541715 (Research and Development in Physical, Engineering, and Life Sciences). 5. Contract duration is 1095 days.
Value Assessment
Rating: good
The contract value of $15.6 million for a 3-year period appears reasonable for specialized R&D services. Benchmarking against similar contracts for prediction engineering and software development would provide a more precise assessment.
Cost Per Unit: N/A
Competition Analysis
Competition Level: full-and-open
The use of full and open competition suggests a robust process for selecting the contractor, likely leading to competitive pricing. The definitive contract award mechanism implies a structured approach to price discovery.
Taxpayer Impact: Taxpayer funds are being utilized for advanced research and development, aiming to yield technological advancements for the Department of Defense.
Public Impact
Enhances Department of Defense's predictive capabilities through advanced software. Supports research and development in critical engineering and physical sciences. Potential for technological innovation and improved operational effectiveness. Contract duration of three years allows for sustained development.
Waste & Efficiency Indicators
Waste Risk Score: 50 / 10
Warning Flags
- Lack of specific performance metrics in provided data.
- Potential for cost overruns in R&D projects.
- Dependence on a single contractor for a critical development phase.
Positive Signals
- Awarded under full and open competition.
- Clear contract duration and start/end dates.
- Focus on advanced technology development.
Sector Analysis
This contract falls within the Research and Development sector, specifically focusing on physical, engineering, and life sciences. Spending in this area is crucial for maintaining technological superiority but can be subject to cost fluctuations and evolving research needs.
Small Business Impact
The provided data does not indicate any specific provisions or set-asides for small businesses in this contract. Further analysis would be needed to determine the extent of small business participation.
Oversight & Accountability
The Department of the Navy is the contracting agency, with the Department of Defense as the overall agency. Standard oversight mechanisms for federal contracts would apply, focusing on performance, cost, and adherence to contract terms.
Related Government Programs
- Research and Development in the Physical, Engineering, and Life Sciences (except Nanotechnology and Biotechnology)
- Department of Defense Contracting
- Department of the Navy Programs
Risk Flags
- Potential for cost overruns in R&D.
- Reliance on contractor's technical expertise.
- Uncertainty in achieving specific R&D outcomes.
- Need for robust government oversight to manage scope and costs.
Tags
research-and-development-in-the-physical, department-of-defense, ms, definitive-contract, 10m-plus
Frequently Asked Questions
What is this federal contract paying for?
Department of Defense awarded $15.6 million to PERATON INC.. OCEAN DYNAMICS, PREDICTION ENGINEERING AND SOFTWARE DEVELOPMENT
Who is the contractor on this award?
The obligated recipient is PERATON INC..
Which agency awarded this contract?
Awarding agency: Department of Defense (Department of the Navy).
What is the total obligated amount?
The obligated amount is $15.6 million.
What is the period of performance?
Start: 2023-06-07. End: 2026-06-06.
What specific advancements in prediction engineering and software development are expected from this contract?
The contract aims to advance prediction engineering and software development capabilities for the Department of Defense. While specific deliverables are not detailed, it likely involves creating sophisticated algorithms, models, and software tools to enhance forecasting, threat assessment, or operational planning. The ultimate goal is to leverage these advancements for improved decision-making and mission effectiveness.
What are the primary risks associated with this cost-plus-fixed-fee contract structure for R&D?
Cost-plus-fixed-fee contracts carry inherent risks in R&D due to the unpredictable nature of research. The government assumes the risk of cost overruns beyond the fixed fee, while the contractor is incentivized to control costs to maximize their fee. Potential risks include scope creep, unforeseen technical challenges, and difficulties in accurately estimating R&D expenses, which could lead to budget challenges.
How will the effectiveness of the developed prediction engineering and software be measured?
Effectiveness will likely be measured against predefined performance metrics and milestones outlined in the contract's statement of work. This could include the accuracy of predictions, the efficiency of the software, successful integration into existing DoD systems, and the achievement of specific operational improvements. Regular reviews and testing will be crucial to ensure the developed solutions meet the intended objectives.
Industry Classification
NAICS: Professional, Scientific, and Technical Services › Scientific Research and Development Services › Research and Development in the Physical, Engineering, and Life Sciences (except Nanotechnology and Biotechnology)
Product/Service Code: RESEARCH AND DEVELOPMENT › General Science and Technology R&D Services
Competition & Pricing
Extent Competed: FULL AND OPEN COMPETITION
Solicitation Procedures: NEGOTIATED PROPOSAL/QUOTE
Solicitation ID: N0017323RSD01
Offers Received: 1
Pricing Type: COST PLUS FIXED FEE (U)
Evaluated Preference: NONE
Contractor Details
Address: 12975 WORLDGATE DR, HERNDON, VA, 20170
Business Categories: Category Business, Corporate Entity Not Tax Exempt, Not Designated a Small Business, Special Designations, U.S.-Owned Business
Financial Breakdown
Contract Ceiling: $45,694,848
Exercised Options: $26,965,015
Current Obligation: $15,578,754
Contract Characteristics
Commercial Item: COMMERCIAL PRODUCTS/SERVICES PROCEDURES NOT USED
Cost or Pricing Data: NO
Timeline
Start Date: 2023-06-07
Current End Date: 2026-06-06
Potential End Date: 2028-06-06 00:00:00
Last Modified: 2026-01-14
More Contracts from Peraton Inc.
- 200107!000034!5700!GZ80 !smc/Pks !F0470101C0001 !A!N!*!Y! !20001103!20061031!052819732!052819732!001216845!n!itt Industries, Inc , Systems !4410 E Fountain Blvd !colorado Sprin !co!80916!16000!041!08!colorado Springs !EL Paso !colorado !+000016429445!n!n!000000000000!ac26!rdte/Missile and Space Systems-Mgmt Support !A2 !missile and Space Systems !3000!NOT Discernable or Classified !541710!*!*!3! ! ! !*!*!*!B!*!*!B! !A !Y!R!2!003!B! !A!N!Z! ! !N!C!N! ! ! !c!c!a!a!000!a!c!n! ! ! !Y! ! !0001! — $1.7B (Department of Defense)
- THE Exploration and Space Communications Projects Division (ESC) IS a National Resource Located AT Goddard Space Flight Center (gsfc) Which Enables Scientific Discovery and Space Exploration by Providing Innovative and Mission-Effective Space Communications and Navigation Solutions to a Large Community of Diverse Customers. ESC Manages Operational Geostationary Communications Relay Satellites and Ground Systems for the Space Communications and Navigation (scan) Program AT Nasa Headquarters. Today, Scan Network Systems Consist of the Space Network (SN), the Near Earth Network (NEN), and the Deep Space Network (DSN). the Day-To-Day Management of These Three Networks IS Currently NOT Fully Consistent. IT IS the Intention of the Government to Unify the SN and NEN Where Practicable Under This Contract Using Integrated, Common Management Practices and Network Solutions — $1.5B (National Aeronautics and Space Administration)
- Nasa Goddard Space Flight Center's (gsfc) Goal for the Space Communications Networks Services Contract (scns) IS to Enable Mission Success for Every Customer Using Scns Services. KEY Objectives of the Scns Contract ARE to Decrease Cost and Maintain or Improve Operational Efficiency and Reliability, While Maintaining an Acceptable Level of Risk and Providing for Safe Operation of the Missions. the Contractor Shall Implement a Safety, Health, and Mission Assurance Program That Provides a Safe and Healthy Work Environment, Minimizes Program Risk, and Maximizes Nasa Mission Success. the Contractor Shall BE Responsible and Accountable for Achieving the Required Results. Core Requirement Functions, Such AS Configuration Management, Quality Assurance, ETC. ARE Required to Support Idiq Task Orders. the Space Network (SN) IS Comprised of a Fleet of On-Orbit Tracking and Data Relay Satellites (tdrs) and Associated Ground Systems That Provide Telecommunications Services. the Nature of the SN Architecture, I.E., Extremely Large Capital Investment, Contractor Operated Facilities, Continuous 24X7 Requirements, ETC., Lends Itself to a Core Requirements Approach. the Ground Network (GN) Consists of an Orbital Tracking Network and the Satellite Laser Ranging Network. the Nature of the Ground Network Architecture, I.E., Diverse MIX of Commercial and Government Assets, Evolving Geographic and Technical Customer Requirements, and Legacy Systems, ETC. Lends Itself to an Idiq Approach. Other Activities, I.E., Very Long Baseline Interferometry Network Operations and Maintenance (O&M), Electronic System Test Laboratory, Requirements Development, Hardware and Software Development, ETC. ARE Best Suited to an Idiq Approach in the Resource-Constrained Environment That Nasa Operates in — $1.2B (National Aeronautics and Space Administration)
- Operational Planning Implementation and Assessment Services (opias) Base Award — $800.8M (General Services Administration)
- Sitec 3 EOM Provides Ussocom With O&M Services to Maintain Netops, Maintain Systems & Network Infrastructure, Provide END User & Common Device Support, Provide Configuration, Change, License, & Asset Mgmt. Conduct Training and Perform Imacs Services — $651.0M (General Services Administration)
Other Department of Defense Contracts
- Federal Contract — $51.3B (Humana Government Business Inc)
- Lrip LOT 12 Advance Acquisition Contract — $35.1B (Lockheed Martin Corporation)
- SSN 802 and 803 Long Lead Time Material — $34.7B (Electric Boat Corporation)
- 200204!008532!1700!AF600 !naval AIR Systems Command !N0001902C3002 !A!N! !N! !20011026!20120430!008016958!008016958!834951691!n!lockheed Martin Corporation !lockheed Blvd !fort Worth !tx!76108!27000!439!48!fort Worth !tarrant !texas !+000026000000!n!n!018981928201!ac15!rdte/Aircraft-Eng/Manuf Develop !a1a!airframes and Spares !2ama!jast/Jsf !336411!E! !3! ! ! ! ! !99990909!B! ! !A! !a!n!r!2!002!n!1a!a!n!z! ! !N!C!N! ! ! !a!a!a!a!000!a!c!n! ! ! !Y! !N00019!0001! — $34.2B (Lockheed Martin Corporation)
- KC-X Modernization Program — $32.0B (THE Boeing Company)