DoD Awards $36.3M for MIDS JTRS Terminals to L3 Technologies, Inc
Contract Overview
Contract Amount: $36,288,207 ($36.3M)
Contractor: L3 Technologies, Inc.
Awarding Agency: Department of Defense
Start Date: 2022-09-28
End Date: 2027-01-31
Contract Duration: 1,586 days
Daily Burn Rate: $22.9K/day
Competition Type: FULL AND OPEN COMPETITION
Pricing Type: FIRM FIXED PRICE
Sector: Defense
Official Description: MIDS JTRS TERMINALS (WITH WARRANTY)
Place of Performance
Location: CARLSBAD, SAN DIEGO County, CALIFORNIA, 92009
Plain-Language Summary
Department of Defense obligated $36.3 million to L3 TECHNOLOGIES, INC. for work described as: MIDS JTRS TERMINALS (WITH WARRANTY) Key points: 1. Contract awarded to L3 Technologies, Inc. for MIDS JTRS Terminals. 2. Full and open competition was utilized for this award. 3. The contract has a duration of 1586 days. 4. The total award value is $36,288,207.34. 5. This falls under the 'Other Communications Equipment Manufacturing' NAICS code.
Value Assessment
Rating: good
The award value of $36.3M for MIDS JTRS Terminals appears reasonable given the contract duration and the nature of specialized communication equipment. Benchmarking against similar complex electronic systems would provide further validation.
Cost Per Unit: N/A
Competition Analysis
Competition Level: full-and-open
The contract was awarded under full and open competition, suggesting a robust price discovery process. This method typically leads to more competitive pricing by allowing all eligible vendors to bid.
Taxpayer Impact: Full and open competition generally benefits taxpayers by fostering a competitive environment that drives down costs and encourages innovation.
Public Impact
Ensures critical communication capabilities for the Department of the Navy. Supports advanced military operations through reliable MIDS JTRS terminals. Potential for technological advancements in military communication systems.
Waste & Efficiency Indicators
Waste Risk Score: 50 / 10
Warning Flags
- Potential for long-term sustainment costs beyond the initial warranty.
- Dependence on a single vendor for critical hardware components.
Positive Signals
- Awarded through full and open competition.
- Includes warranty, potentially reducing immediate post-delivery repair costs.
- Long contract duration allows for stable planning and integration.
Sector Analysis
This contract falls within the Defense sector, specifically related to communications equipment manufacturing. Spending in this area is critical for national security and often involves high-value, specialized procurements.
Small Business Impact
The data does not indicate any specific set-asides for small businesses. The prime contractor, L3 Technologies, Inc., is a large corporation, suggesting limited direct opportunities for small businesses in this specific prime contract.
Oversight & Accountability
The contract is managed by the Department of the Navy, a component of the Department of Defense, which has established oversight mechanisms for defense procurements. The long duration and fixed-price nature suggest a degree of accountability.
Related Government Programs
- Other Communications Equipment Manufacturing
- Department of Defense Contracting
- Department of the Navy Programs
Risk Flags
- Potential for cost overruns if sustainment costs are underestimated.
- Risk of technological obsolescence over the contract's long duration.
- Dependence on a single supplier for critical components.
- Limited visibility into long-term operational and maintenance expenses.
Tags
other-communications-equipment-manufactu, department-of-defense, ca, delivery-order, 10m-plus
Frequently Asked Questions
What is this federal contract paying for?
Department of Defense awarded $36.3 million to L3 TECHNOLOGIES, INC.. MIDS JTRS TERMINALS (WITH WARRANTY)
Who is the contractor on this award?
The obligated recipient is L3 TECHNOLOGIES, INC..
Which agency awarded this contract?
Awarding agency: Department of Defense (Department of the Navy).
What is the total obligated amount?
The obligated amount is $36.3 million.
What is the period of performance?
Start: 2022-09-28. End: 2027-01-31.
What is the projected lifecycle cost of these MIDS JTRS terminals, considering sustainment and potential upgrades beyond the initial warranty period?
The current award covers the initial procurement and warranty. Lifecycle cost projections are not provided in this data. Further analysis would be needed to estimate sustainment, maintenance, repair, and potential upgrade costs over the operational life of the terminals, which could significantly impact the total taxpayer investment.
How does the per-unit cost of these MIDS JTRS terminals compare to similar systems procured by other military branches or allied nations?
A direct per-unit cost benchmark is not available from the provided data. A comprehensive comparison would require access to pricing data for comparable MIDS JTRS terminals or similar advanced communication systems procured by other entities, considering variations in specifications, quantities, and contract terms.
What is the plan for ensuring interoperability and future compatibility of these terminals with evolving communication technologies and security protocols?
The contract specifies MIDS JTRS terminals, implying adherence to Joint Tactical Radio System standards. However, the long duration necessitates a proactive strategy for managing technological obsolescence and ensuring future compatibility through planned upgrades or replacements, which should be part of the Department of the Navy's long-term technology roadmap.
Industry Classification
NAICS: Manufacturing › Communications Equipment Manufacturing › Other Communications Equipment Manufacturing
Product/Service Code: COMM/DETECT/COHERENT RADIATION
Competition & Pricing
Extent Competed: FULL AND OPEN COMPETITION
Solicitation Procedures: NEGOTIATED PROPOSAL/QUOTE
Solicitation ID: N0003919R1000
Pricing Type: FIRM FIXED PRICE (J)
Evaluated Preference: NONE
Contractor Details
Parent Company: L3harris Technologies, Inc
Address: 640 N 2200 W, SALT LAKE CITY, UT, 84116
Business Categories: Category Business, Corporate Entity Not Tax Exempt, Manufacturer of Goods, Not Designated a Small Business, Special Designations, U.S.-Owned Business
Financial Breakdown
Contract Ceiling: $36,288,207
Exercised Options: $36,288,207
Current Obligation: $36,288,207
Subaward Activity
Number of Subawards: 19
Total Subaward Amount: $25,704,229
Contract Characteristics
Commercial Item: COMMERCIAL PRODUCTS/SERVICES PROCEDURES NOT USED
Cost or Pricing Data: NO
Parent Contract
Parent Award PIID: N0003920D0058
IDV Type: IDC
Timeline
Start Date: 2022-09-28
Current End Date: 2027-01-31
Potential End Date: 2027-01-31 00:00:00
Last Modified: 2025-01-17
More Contracts from L3 Technologies, Inc.
- 63 Each of the Following Hardware Items for the Bradley Fighting Vehicle System (bfvs): Thor Hmpt 800HP Reman Transmission, NSN 2520-01-626-5061 TCM Electronic Assembly, NSN 2520-01-627-6468 Shift Tower, NSN 2520-01-465-5184 TEC Cable, NSN 6150-01-631-6134 — $456.5M (Department of Defense)
- Purchase of 538 EA E-Rovers — $401.1M (Department of Defense)
- Federal Contract — $395.7M (Department of Defense)
- CEC System Production and Repair — $315.9M (Department of Defense)
- Undersea Warfare Training Range (uswtr) Program Requirements Will Provide the Capability for Undersea Warfare (USW) Training and Assessment in Shallow Water and Deep Water Under Adverse Conditions for AIR, Surface, and Subsurface Forces — $267.9M (Department of Defense)
Other Department of Defense Contracts
- Federal Contract — $51.3B (Humana Government Business Inc)
- Lrip LOT 12 Advance Acquisition Contract — $35.1B (Lockheed Martin Corporation)
- SSN 802 and 803 Long Lead Time Material — $34.7B (Electric Boat Corporation)
- 200204!008532!1700!AF600 !naval AIR Systems Command !N0001902C3002 !A!N! !N! !20011026!20120430!008016958!008016958!834951691!n!lockheed Martin Corporation !lockheed Blvd !fort Worth !tx!76108!27000!439!48!fort Worth !tarrant !texas !+000026000000!n!n!018981928201!ac15!rdte/Aircraft-Eng/Manuf Develop !a1a!airframes and Spares !2ama!jast/Jsf !336411!E! !3! ! ! ! ! !99990909!B! ! !A! !a!n!r!2!002!n!1a!a!n!z! ! !N!C!N! ! ! !a!a!a!a!000!a!c!n! ! ! !Y! !N00019!0001! — $34.2B (Lockheed Martin Corporation)
- KC-X Modernization Program — $32.0B (THE Boeing Company)