"other Function" the SOC Uses the Vmware Vcenter, Vsphere and Vmworkstation Software to Build Their R&D LAB in the FSA SOC. the Software Allows Them to Test Various Applications by Creating and Installing Virtual Servers in a LAB Environment With Different Operating Systems. the Vmware Fusion IS Installed on Educate MAC Laptops Which ARE Built With 2 Windows 7 Images. ONE of the Images IS Used to Connect to the Educate Network, the Other IS Used to Connect to the IA Enclave Where ALL of the FSA SOC Tools (splunk, Coreinsight, ETC.) ARE Installed

Contract Overview

Contract Amount: $13,120 ($13.1K)

Contractor: Accelera Solutions Inc

Awarding Agency: Department of Education

Start Date: 2017-06-01

End Date: 2026-04-01

Contract Duration: 3,226 days

Daily Burn Rate: $4/day

Official Description: IGF::OT::IGF "OTHER FUNCTION" THE SOC USES THE VMWARE VCENTER, VSPHERE AND VMWORKSTATION SOFTWARE TO BUILD THEIR R&D LAB IN THE FSA SOC. THE SOFTWARE ALLOWS THEM TO TEST VARIOUS APPLICATIONS BY CREATING AND INSTALLING VIRTUAL SERVERS IN A LAB ENVIRONMENT WITH DIFFERENT OPERATING SYSTEMS. THE VMWARE FUSION IS INSTALLED ON EDUCATE MAC LAPTOPS WHICH ARE BUILT WITH 2 WINDOWS 7 IMAGES. ONE OF THE IMAGES IS USED TO CONNECT TO THE EDUCATE NETWORK, THE OTHER IS USED TO CONNECT TO THE IA ENCLAVE WHERE ALL OF THE FSA SOC TOOLS (SPLUNK, COREINSIGHT, ETC.) ARE INSTALLED.

Place of Performance

Location: Virginia, 22033

State: Virginia Government Spending

Related Pages