"other Function" the SOC Uses the Vmware Vcenter, Vsphere and Vmworkstation Software to Build Their R&D LAB in the FSA SOC. the Software Allows Them to Test Various Applications by Creating and Installing Virtual Servers in a LAB Environment With Different Operating Systems. the Vmware Fusion IS Installed on Educate MAC Laptops Which ARE Built With 2 Windows 7 Images. ONE of the Images IS Used to Connect to the Educate Network, the Other IS Used to Connect to the IA Enclave Where ALL of the FSA SOC Tools (splunk, Coreinsight, ETC.) ARE Installed
Contract Overview
Contract Amount: $13,120 ($13.1K)
Contractor: Accelera Solutions Inc
Awarding Agency: Department of Education
Start Date: 2017-06-01
End Date: 2026-04-01
Contract Duration: 3,226 days
Daily Burn Rate: $4/day
Official Description: IGF::OT::IGF "OTHER FUNCTION" THE SOC USES THE VMWARE VCENTER, VSPHERE AND VMWORKSTATION SOFTWARE TO BUILD THEIR R&D LAB IN THE FSA SOC. THE SOFTWARE ALLOWS THEM TO TEST VARIOUS APPLICATIONS BY CREATING AND INSTALLING VIRTUAL SERVERS IN A LAB ENVIRONMENT WITH DIFFERENT OPERATING SYSTEMS. THE VMWARE FUSION IS INSTALLED ON EDUCATE MAC LAPTOPS WHICH ARE BUILT WITH 2 WINDOWS 7 IMAGES. ONE OF THE IMAGES IS USED TO CONNECT TO THE EDUCATE NETWORK, THE OTHER IS USED TO CONNECT TO THE IA ENCLAVE WHERE ALL OF THE FSA SOC TOOLS (SPLUNK, COREINSIGHT, ETC.) ARE INSTALLED.
Place of Performance
Location: Virginia, 22033
State: Virginia Government Spending