DDE Radon Mitigation Study AT the DDE Presidential Library. the Project Involves a Site Visit to Analyze the Hvac System and to Prepare a Design and Proposal for Mitigation AT the Library Building
Contract Overview
Contract Amount: $161,235 ($161.2K)
Contractor: Raven Services Corp
Awarding Agency: National Archives and Records Administration
Start Date: 2025-08-11
End Date: 2026-02-28
Contract Duration: 201 days
Daily Burn Rate: $802/day
Official Description: DDE RADON MITIGATION STUDY AT THE DDE PRESIDENTIAL LIBRARY. THE PROJECT INVOLVES A SITE VISIT TO ANALYZE THE HVAC SYSTEM AND TO PREPARE A DESIGN AND PROPOSAL FOR MITIGATION AT THE LIBRARY BUILDING.
Place of Performance
Location: Maryland, 20740
State: Maryland Government Spending