DHS Awards $150K for USCG Mobile Buoy Hoist Monorail System to ACE INDUSTRIES, INC
Contract Overview
Contract Amount: $150,319 ($150.3K)
Contractor: ACE Industries, Inc.
Awarding Agency: Department of Homeland Security
Start Date: 2025-06-12
End Date: 2026-05-31
Contract Duration: 353 days
Daily Burn Rate: $426/day
Competition Type: NOT COMPETED UNDER SAP
Number of Offers Received: 1
Pricing Type: FIRM FIXED PRICE
Sector: Construction
Official Description: THE PURPOSE OF THIS PURCHASE ORDER IS TO PROCURE INSTALLATION OF A 10-TON MONORAIL SYSTEM TO HOIST BUOYS AT THE USCG BASE MOBILE INDUSTRIAL PRODUCTION FACILITY
Place of Performance
Location: MOBILE, MOBILE County, ALABAMA, 36602
State: Alabama Government Spending
Plain-Language Summary
Department of Homeland Security obligated $150,318.59 to ACE INDUSTRIES, INC. for work described as: THE PURPOSE OF THIS PURCHASE ORDER IS TO PROCURE INSTALLATION OF A 10-TON MONORAIL SYSTEM TO HOIST BUOYS AT THE USCG BASE MOBILE INDUSTRIAL PRODUCTION FACILITY Key points: 1. Procurement of a specialized 10-ton monorail system for buoy handling at USCG Base Mobile. 2. Contract awarded to ACE INDUSTRIES, INC. for installation services. 3. The purchase order is a firm fixed price contract. 4. The project duration is 353 days, spanning from June 2025 to May 2026.
Value Assessment
Rating: fair
The contract value of $150,318.59 for a 10-ton monorail installation appears within a reasonable range for specialized industrial equipment. Benchmarking against similar custom-built industrial lifting systems would provide a more precise assessment.
Cost Per Unit: N/A
Competition Analysis
Competition Level: limited
The contract was not competed under SAP, indicating a limited competition approach. This method may limit price discovery and potentially lead to higher costs compared to a fully open competition.
Taxpayer Impact: Taxpayer funds are used for this specialized infrastructure upgrade, with potential for cost savings if a more competitive process were employed.
Public Impact
Enhances operational efficiency for buoy handling at a critical USCG facility. Supports the maintenance and deployment readiness of USCG assets. Investment in infrastructure at USCG Base Mobile.
Waste & Efficiency Indicators
Waste Risk Score: 50 / 10
Warning Flags
- Limited competition may impact cost-effectiveness.
- Lack of detailed technical specifications for the monorail system.
Positive Signals
- Supports critical USCG operations.
- Firm fixed price contract provides cost certainty.
Sector Analysis
This contract falls under Commercial and Institutional Building Construction, specifically for industrial facility upgrades. Spending in this sector can vary widely based on project scope and specialization, but specialized heavy-duty equipment like monorails represents a significant investment.
Small Business Impact
The data indicates this contract was not awarded to a small business. Further analysis would be needed to determine if small businesses were solicited or had the capability to perform this specialized work.
Oversight & Accountability
The award is a Purchase Order from the Department of Homeland Security, U.S. Coast Guard. Standard oversight for federal procurement processes would apply, but specific details on monitoring the installation's progress and quality are not provided.
Related Government Programs
- Commercial and Institutional Building Construction
- Department of Homeland Security Contracting
- U.S. Coast Guard Programs
Risk Flags
- Limited competition.
- Potential for higher cost due to non-competitive award.
- Lack of detailed technical specifications provided.
- No indication of small business participation.
Tags
commercial-and-institutional-building-co, department-of-homeland-security, al, purchase-order, 100k-plus
Frequently Asked Questions
What is this federal contract paying for?
Department of Homeland Security awarded $150,318.59 to ACE INDUSTRIES, INC.. THE PURPOSE OF THIS PURCHASE ORDER IS TO PROCURE INSTALLATION OF A 10-TON MONORAIL SYSTEM TO HOIST BUOYS AT THE USCG BASE MOBILE INDUSTRIAL PRODUCTION FACILITY
Who is the contractor on this award?
The obligated recipient is ACE INDUSTRIES, INC..
Which agency awarded this contract?
Awarding agency: Department of Homeland Security (U.S. Coast Guard).
What is the total obligated amount?
The obligated amount is $150,318.59.
What is the period of performance?
Start: 2025-06-12. End: 2026-05-31.
What specific technical requirements and safety standards must the monorail system meet to ensure effective and safe operation for hoisting buoys?
The monorail system must adhere to rigorous safety standards for industrial lifting equipment, including load capacity verification, emergency stop mechanisms, and robust structural integrity. Specific technical requirements would detail the hoist speed, control systems, power source, and environmental operating conditions at USCG Base Mobile. Compliance with relevant OSHA and USCG engineering directives is paramount for ensuring safe and effective operation in this critical maritime support facility.
What is the justification for not competing this contract more broadly, and what steps were taken to ensure a fair price was obtained?
The justification for limited competition is not explicitly stated in the provided data. Typically, this occurs when only one source can meet the requirement due to unique capabilities or urgency. To ensure a fair price, the government likely relied on market research, historical pricing data for similar installations, or a cost analysis of the contractor's proposal. However, a broader competition would generally offer greater assurance of the best possible price.
How will the effectiveness of the monorail system be measured post-installation to ensure it meets the USCG's operational needs for buoy handling?
Effectiveness will be measured through a combination of acceptance testing, performance verification, and operational feedback. Acceptance testing will confirm the system meets all specified technical requirements and safety standards under load. Performance verification will involve observing its functionality during actual buoy handling operations to assess efficiency and reliability. Post-installation, the USCG will likely track metrics such as reduced handling time, improved safety incident rates, and overall operational uptime to gauge its effectiveness.
Industry Classification
NAICS: Construction › Nonresidential Building Construction › Commercial and Institutional Building Construction
Product/Service Code: MAINT, REPAIR, ALTER REAL PROPERTY › MAINT, ALTER, REPAIR NONBUILDINGS
Competition & Pricing
Extent Competed: NOT COMPETED UNDER SAP
Solicitation Procedures: SIMPLIFIED ACQUISITION
Offers Received: 1
Pricing Type: FIRM FIXED PRICE (J)
Evaluated Preference: NONE
Contractor Details
Address: 6295 MCDONOUGH DR, NORCROSS, GA, 30093
Business Categories: Category Business, Corporate Entity Not Tax Exempt, Manufacturer of Goods, Small Business, Special Designations, Subchapter S Corporation, U.S.-Owned Business
Financial Breakdown
Contract Ceiling: $150,319
Exercised Options: $150,319
Current Obligation: $150,319
Contract Characteristics
Commercial Item: COMMERCIAL PRODUCTS/SERVICES PROCEDURES NOT USED
Timeline
Start Date: 2025-06-12
Current End Date: 2026-05-31
Potential End Date: 2026-05-31 04:00:00
Last Modified: 2026-04-07
Other Department of Homeland Security Contracts
- THE United States Coast Guard HAS a Requirement to Procure UP to Twenty-Six (26) Fast Response Cutters (frcs) on a Firm Fixed Price (FFP) Basis With an Economic Price Adjustment (EPA). Phase II of the FRC Program Will Complete the Fleet for a Total of 58 Cutters — $2.1B (Bollinger Shipyards Lockport, L.L.C.)
- Design and Construct NEW Vertical Barrier and Power Distribution, Lighting, Cameras, Equipment Shelters and Linear Ground Detection System (lgds) in Hildago County, NM — $1.8B (Fisher Sand & Gravel CO)
- Production&delivery of National Security Cutter (NSC) 6 — $1.7B (Huntington Ingalls Incorporated)
- YUM-2 Vertical Border and Waterborne Barrier Construction — $1.7B (Fisher Sand & Gravel CO)
- Construct Vertical Border Barrier — $1.6B (Fisher Sand & Gravel CO)