Gulf Islands National Seashore Road Repair Contract Awarded for $2.5M to Central Southern Construction Corp
Contract Overview
Contract Amount: $2,534,156 ($2.5M)
Contractor: Central Southern Construction Corp.
Awarding Agency: Department of Transportation
Start Date: 2021-07-28
End Date: 2023-09-30
Contract Duration: 794 days
Daily Burn Rate: $3.2K/day
Competition Type: FULL AND OPEN COMPETITION AFTER EXCLUSION OF SOURCES
Pricing Type: FIRM FIXED PRICE
Sector: Construction
Official Description: FL ERFO NPS GUIS 2020-1(1) THE PROJECT CONSISTS OF THE REPAIR STORM DAMAGE ON J. EARLE BOWDEN WAY, FORT PICKENS ROAD, JOHNSON BEACH ROAD, AND BEACH PARKING #6 WITHIN THE GULF ISLANDS NATIONAL SEASHORE, FLORIDA DISTRICT. THE WORK INCLUDES ASPHALT PA
Place of Performance
Location: PENSACOLA, ESCAMBIA County, FLORIDA, 32514
State: Florida Government Spending
Plain-Language Summary
Department of Transportation obligated $2.5 million to CENTRAL SOUTHERN CONSTRUCTION CORP. for work described as: FL ERFO NPS GUIS 2020-1(1) THE PROJECT CONSISTS OF THE REPAIR STORM DAMAGE ON J. EARLE BOWDEN WAY, FORT PICKENS ROAD, JOHNSON BEACH ROAD, AND BEACH PARKING #6 WITHIN THE GULF ISLANDS NATIONAL SEASHORE, FLORIDA DISTRICT. THE WORK INCLUDES ASPHALT PA Key points: 1. The contract addresses critical storm damage repairs to key roads within the national seashore. 2. Central Southern Construction Corp. secured the award through full and open competition. 3. The project duration of 794 days suggests a potentially complex or lengthy repair process. 4. The sector is dominated by large prime contractors, with limited opportunities for smaller specialized firms.
Value Assessment
Rating: good
The contract value of $2.5M appears reasonable for extensive road repair work within a national park setting. Benchmarking against similar federal highway repair contracts of comparable scope and complexity would provide further validation.
Cost Per Unit: N/A
Competition Analysis
Competition Level: full-and-open
The contract was awarded under 'full and open competition after exclusion of sources,' indicating a competitive bidding process was utilized. This method generally promotes price discovery and ensures fair market value.
Taxpayer Impact: The use of competitive bidding is expected to result in a fair price for taxpayers, avoiding unnecessary costs associated with sole-source or limited competition awards.
Public Impact
Restoration of essential access routes within Gulf Islands National Seashore. Improved safety and usability for visitors and park staff. Preservation of critical infrastructure damaged by severe weather events. Support for local and regional economic activity through construction services.
Waste & Efficiency Indicators
Waste Risk Score: 50 / 10
Warning Flags
- Extended project duration may lead to cost overruns.
- Potential for scope creep if unforeseen issues arise during repairs.
Positive Signals
- Competitive award process.
- Focus on critical infrastructure repair.
Sector Analysis
Highway, Street, and Bridge Construction is a significant sector within federal contracting, often involving large-scale infrastructure projects. Spending benchmarks vary widely based on project scope, location, and complexity.
Small Business Impact
While the contract was awarded through full and open competition, the prime contractor is not identified as a small business. Analysis of subcontracting opportunities for small businesses would be beneficial to assess their participation.
Oversight & Accountability
The Federal Highway Administration, under the Department of Transportation, is responsible for overseeing this contract. Standard oversight mechanisms for construction projects should be in place to monitor progress and ensure compliance.
Related Government Programs
- Highway, Street, and Bridge Construction
- Department of Transportation Contracting
- Federal Highway Administration Programs
Risk Flags
- Extended project duration.
- Potential for unforeseen site conditions.
- Environmental sensitivities of the location.
- Reliance on a single prime contractor.
Tags
highway-street-and-bridge-construction, department-of-transportation, fl, delivery-order, 1m-plus
Frequently Asked Questions
What is this federal contract paying for?
Department of Transportation awarded $2.5 million to CENTRAL SOUTHERN CONSTRUCTION CORP.. FL ERFO NPS GUIS 2020-1(1) THE PROJECT CONSISTS OF THE REPAIR STORM DAMAGE ON J. EARLE BOWDEN WAY, FORT PICKENS ROAD, JOHNSON BEACH ROAD, AND BEACH PARKING #6 WITHIN THE GULF ISLANDS NATIONAL SEASHORE, FLORIDA DISTRICT. THE WORK INCLUDES ASPHALT PA
Who is the contractor on this award?
The obligated recipient is CENTRAL SOUTHERN CONSTRUCTION CORP..
Which agency awarded this contract?
Awarding agency: Department of Transportation (Federal Highway Administration).
What is the total obligated amount?
The obligated amount is $2.5 million.
What is the period of performance?
Start: 2021-07-28. End: 2023-09-30.
What is the specific breakdown of repair costs for each road segment, and how does this align with the overall project scope?
A detailed breakdown of repair costs per road segment is not provided in the available data. Understanding the specific work required for J. Earle Bowden Way, Fort Pickens Road, Johnson Beach Road, and Beach Parking #6, along with their respective cost allocations, would offer greater insight into the project's value proposition and ensure equitable distribution of funds.
What are the key performance indicators (KPIs) for this project, and how will contractor performance be measured against them?
Key performance indicators for this highway repair project would likely include adherence to schedule, quality of materials and workmanship, safety compliance, and completion within budget. The contract's firm fixed price structure incentivizes the contractor to manage costs effectively. Performance will be monitored through regular site inspections, progress reports, and final acceptance criteria.
Are there any provisions for environmental mitigation or monitoring during the construction period, given the location within a national seashore?
While not explicitly detailed in the provided summary, projects within national park boundaries typically require stringent environmental impact assessments and mitigation plans. It is highly probable that the contract includes clauses for environmental protection, waste management, and potentially monitoring to minimize disruption to the sensitive ecosystem of the Gulf Islands National Seashore.
Industry Classification
NAICS: Construction › Highway, Street, and Bridge Construction › Highway, Street, and Bridge Construction
Product/Service Code: CONSTRUCT OF STRUCTURES/FACILITIES › CONSTRUCTION OF BUILDINGS
Competition & Pricing
Extent Competed: FULL AND OPEN COMPETITION AFTER EXCLUSION OF SOURCES
Solicitation Procedures: NEGOTIATED PROPOSAL/QUOTE
Solicitation ID: 693C7321R000022
Pricing Type: FIRM FIXED PRICE (J)
Evaluated Preference: NONE
Contractor Details
Address: 2410 HARPER ST, JACKSONVILLE, FL, 32204
Business Categories: 8(a) Program Participant, Category Business, Corporate Entity Not Tax Exempt, DoT Certified Disadvantaged Business Enterprise, Economically Disadvantaged Women Owned Small Business, Hispanic American Owned Business, HUBZone Firm, Minority Owned Business, Self-Certified Small Disadvantaged Business, Small Business, Special Designations, Subchapter S Corporation, U.S.-Owned Business, Woman Owned Business, Women Owned Small Business
Financial Breakdown
Contract Ceiling: $2,534,156
Exercised Options: $2,534,156
Current Obligation: $2,534,156
Contract Characteristics
Commercial Item: COMMERCIAL PRODUCTS/SERVICES PROCEDURES NOT USED
Cost or Pricing Data: NO
Parent Contract
Parent Award PIID: 693C7320D000015
IDV Type: IDC
Timeline
Start Date: 2021-07-28
Current End Date: 2023-09-30
Potential End Date: 2026-02-10 00:00:00
Last Modified: 2026-02-23
More Contracts from Central Southern Construction Corp.
- This Project Consists of Resurfacing the Natchez Trace Parkway, Including Ramps, Bridges, Intersections, Various Access Roads, and Parking/Pull-Off Areas. the Work Will Include Asphalt Overlay, Sideslope Repairs, Wedge and Leveling, Spot Patching, an — $19.4M (Department of Transportation)
- Project NC Erfo NP Blri 2024-1(1): the Project Consists of Repairing Damage to the Blue Ridge Parkway Caused by Hurricane Helene. the Work Includes TWO Slide Repairs With Reinforced Soil Slope (RSS), Deep Patch, Minimal Tree Removal for Access, Ditc — $14.7M (Department of Transportation)
- Funds Construction Project TX NP Multi PMS(1) ), Pavement Preservation Texas. This Work Consists of Crack Sealing, Patching, Application of Chip Seal and Micro Surface Treatments and Pavement Marking — $10.5M (Department of Transportation)
- Project MS Erfo NPS Vick 2020-1(2) the Project Consists of Slide Repairs on Grant Avenue and Union Avenue. the Work Includes Clearing and Grubbing, Roadway Excavation and Embankment Construction, Geogrid, Gabions, Aggregate Base, Mechanically Compac — $8.9M (Department of Transportation)
- Project NC Erfo NP Blri 2024-1(5) the Project Consists of Slide Repairs, Culvert Replacement, Stone Masonry Headwall Repair, Pavement Reconstruction, Pavement Markings and Other Miscellaneous Work — $8.2M (Department of Transportation)
View all Central Southern Construction Corp. federal contracts →
Other Department of Transportation Contracts
- Dafis UDO Reconstruct W/O Advance — $3.8B (Lockheed Martin Services, LLC)
- THE Purpose of This Delivery Order Award IS to ADD Funding for FTI Telecommunications Services — $1.9B (Harris Corporation)
- Provide Funding for Clin 302 for Pre-Flight and In-Flight Services. Contract Number Dtfawa-05-C-00031, Lockheed Martin. POP 01/16/08-03/31/08 — $1.9B (Leidos, Inc.)
- Center for Advanced Aviation Development (caasd) Ffrdc Mitre — $1.7B (THE Mitre Corporation)
- Dafis UDO Reconstruct W/O Advance — $1.5B (Harris Corporation)