DOT Awards $3.48M for Olympic Peninsula Roadway Repairs Under Full and Open Competition
Contract Overview
Contract Amount: $3,475,869 ($3.5M)
Contractor: Bruch & Bruch Construction, Inc
Awarding Agency: Department of Transportation
Start Date: 2026-01-26
End Date: 2026-10-15
Contract Duration: 262 days
Daily Burn Rate: $13.3K/day
Competition Type: FULL AND OPEN COMPETITION AFTER EXCLUSION OF SOURCES
Number of Offers Received: 2
Pricing Type: FIRM FIXED PRICE
Sector: Transportation
Official Description: FUNDS CONSTRUCTION PROJECT WA ERFO FS OLYMP609 2022-1(1), OLYMPIC FS ERFO REPAIRS 2022. WORK INCLUDES ROADWAY RECONSTRUCTION, CULVERT UPSIZING AND REPLACEMENT, SLOPE STABILIZATION, EMBANKMENT REPAIR, SPECIAL ROCK EMBANKMENT, AND REINFORCED SOIL SLOPE
Place of Performance
Location: FORKS, CLALLAM County, WASHINGTON, 98331
Plain-Language Summary
Department of Transportation obligated $3.5 million to BRUCH & BRUCH CONSTRUCTION, INC for work described as: FUNDS CONSTRUCTION PROJECT WA ERFO FS OLYMP609 2022-1(1), OLYMPIC FS ERFO REPAIRS 2022. WORK INCLUDES ROADWAY RECONSTRUCTION, CULVERT UPSIZING AND REPLACEMENT, SLOPE STABILIZATION, EMBANKMENT REPAIR, SPECIAL ROCK EMBANKMENT, AND REINFORCED SOIL SLOPE Key points: 1. Project focuses on critical infrastructure repair and upgrades for roadways and drainage systems. 2. Competition method aimed for broad participation but excluded specific sources, warranting review. 3. Risk of cost overruns exists due to the complexity of reconstruction and stabilization work. 4. Spending falls within the Highway, Street, and Bridge Construction sector.
Value Assessment
Rating: fair
The contract value of $3.48M for a 262-day project appears reasonable given the scope of roadway reconstruction, culvert work, and slope stabilization. Benchmarking against similar federal infrastructure projects would provide a more definitive assessment.
Cost Per Unit: N/A
Competition Analysis
Competition Level: limited
The 'FULL AND OPEN COMPETITION AFTER EXCLUSION OF SOURCES' indicates a competitive process but with specific limitations. Understanding the rationale for source exclusion is crucial to assess if it impacted price discovery and overall value.
Taxpayer Impact: Taxpayer funds are being used for essential infrastructure maintenance, which is a necessary public expenditure. The effectiveness of the competition method will determine the ultimate value for taxpayers.
Public Impact
Improved transportation infrastructure on the Olympic Peninsula, enhancing safety and efficiency for residents and businesses. Potential for localized traffic disruptions during the construction period. Investment in resilient infrastructure to withstand environmental factors and reduce future repair needs.
Waste & Efficiency Indicators
Waste Risk Score: 50 / 10
Warning Flags
- Limited competition due to source exclusion
- Potential for scope creep in complex reconstruction projects
- Firm Fixed Price contract may not fully account for unforeseen site conditions
Positive Signals
- Addresses critical infrastructure needs
- Clear project scope and defined end date
- Experienced contractor likely selected through a competitive process
Sector Analysis
This project falls under the Highway, Street, and Bridge Construction sector, which is a significant area of federal spending for maintaining and upgrading national transportation networks. Benchmarks for similar reconstruction projects vary widely based on location and complexity.
Small Business Impact
The data does not indicate if small businesses were involved as prime contractors or subcontractors. Further analysis would be needed to determine the extent of small business participation in this contract.
Oversight & Accountability
The Federal Highway Administration is the contracting agency, suggesting established oversight mechanisms. However, the specific details of project monitoring and accountability for this contract are not provided.
Related Government Programs
- Highway, Street, and Bridge Construction
- Department of Transportation Contracting
- Federal Highway Administration Programs
Risk Flags
- Limited competition due to source exclusion
- Potential for cost overruns on complex infrastructure projects
- Firm Fixed Price contract may not fully cover unforeseen site conditions
- Lack of detail on small business participation
- Need for clarity on specific oversight and accountability measures
Tags
highway-street-and-bridge-construction, department-of-transportation, wa, definitive-contract, 1m-plus
Frequently Asked Questions
What is this federal contract paying for?
Department of Transportation awarded $3.5 million to BRUCH & BRUCH CONSTRUCTION, INC. FUNDS CONSTRUCTION PROJECT WA ERFO FS OLYMP609 2022-1(1), OLYMPIC FS ERFO REPAIRS 2022. WORK INCLUDES ROADWAY RECONSTRUCTION, CULVERT UPSIZING AND REPLACEMENT, SLOPE STABILIZATION, EMBANKMENT REPAIR, SPECIAL ROCK EMBANKMENT, AND REINFORCED SOIL SLOPE
Who is the contractor on this award?
The obligated recipient is BRUCH & BRUCH CONSTRUCTION, INC.
Which agency awarded this contract?
Awarding agency: Department of Transportation (Federal Highway Administration).
What is the total obligated amount?
The obligated amount is $3.5 million.
What is the period of performance?
Start: 2026-01-26. End: 2026-10-15.
What was the specific justification for excluding certain sources in the 'FULL AND OPEN COMPETITION AFTER EXCLUSION OF SOURCES' process, and how did this impact the final contract price?
The justification for excluding sources is critical for understanding the competitive landscape. If exclusions were based on specific technical requirements or past performance, it might be warranted. However, if arbitrary, it could limit competition and potentially lead to higher prices. A thorough review of the solicitation documents and award justification would be necessary to assess the impact on price discovery and taxpayer value.
What are the key performance indicators (KPIs) for this construction project, and how will their achievement be measured to ensure effectiveness and value for money?
Key performance indicators for such a project typically include adherence to schedule, budget, quality standards (e.g., material specifications, workmanship), and safety compliance. Effectiveness would be measured by the successful completion of all specified work, including roadway reconstruction, culvert upgrades, and slope stabilization, meeting all engineering and environmental requirements. Regular site inspections, progress reports, and final acceptance testing by the contracting agency are crucial for ensuring accountability and value.
Given the firm-fixed-price nature of the contract, what contingency plans are in place to manage unforeseen site conditions or material price fluctuations that could impact the project's overall cost
A firm-fixed-price contract generally places the risk of unforeseen conditions on the contractor. However, contracts often include clauses for equitable adjustments in cases of differing site conditions or significant, unallowable cost increases. The agency should have a robust change order process and potentially a small contingency fund. The contractor's own risk assessment and bidding strategy would have factored in potential issues. Monitoring progress closely and proactive communication are key to managing these risks.
Industry Classification
NAICS: Construction › Highway, Street, and Bridge Construction › Highway, Street, and Bridge Construction
Product/Service Code: CONSTRUCT OF STRUCTURES/FACILITIES › CONSTRUCTION OF BUILDINGS
Competition & Pricing
Extent Competed: FULL AND OPEN COMPETITION AFTER EXCLUSION OF SOURCES
Solicitation Procedures: SEALED BID
Solicitation ID: 69056725B000016
Offers Received: 2
Pricing Type: FIRM FIXED PRICE (J)
Evaluated Preference: NONE
Contractor Details
Address: 1706 W HIGHWAY 101, PORT ANGELES, WA, 98363
Business Categories: Category Business, Corporate Entity Not Tax Exempt, Small Business, Special Designations, U.S.-Owned Business
Financial Breakdown
Contract Ceiling: $3,475,869
Exercised Options: $3,475,869
Current Obligation: $3,475,869
Subaward Activity
Number of Subawards: 3
Total Subaward Amount: $388,550
Contract Characteristics
Commercial Item: COMMERCIAL PRODUCTS/SERVICES PROCEDURES NOT USED
Cost or Pricing Data: NO
Timeline
Start Date: 2026-01-26
Current End Date: 2026-10-15
Potential End Date: 2026-10-15 00:00:00
Last Modified: 2026-01-26
Other Department of Transportation Contracts
- Dafis UDO Reconstruct W/O Advance — $3.8B (Lockheed Martin Services, LLC)
- THE Purpose of This Delivery Order Award IS to ADD Funding for FTI Telecommunications Services — $1.9B (Harris Corporation)
- Provide Funding for Clin 302 for Pre-Flight and In-Flight Services. Contract Number Dtfawa-05-C-00031, Lockheed Martin. POP 01/16/08-03/31/08 — $1.9B (Leidos, Inc.)
- Center for Advanced Aviation Development (caasd) Ffrdc Mitre — $1.7B (THE Mitre Corporation)
- Dafis UDO Reconstruct W/O Advance — $1.5B (Harris Corporation)