DoD Awards $46M for Bradley Engineering Change Proposals to LOC Performance Products LLC
Contract Overview
Contract Amount: $46,027,980 ($46.0M)
Contractor: LOC Performance Products LLC
Awarding Agency: Department of Defense
Start Date: 2017-07-14
End Date: 2020-10-15
Contract Duration: 1,189 days
Daily Burn Rate: $38.7K/day
Competition Type: FULL AND OPEN COMPETITION
Number of Offers Received: 1
Pricing Type: FIRM FIXED PRICE
Sector: Defense
Official Description: BRADLEY ENGINEERING CHANGE PROPOSAL (ECP) 1
Place of Performance
Location: PLYMOUTH, WAYNE County, MICHIGAN, 48170
State: Michigan Government Spending
Plain-Language Summary
Department of Defense obligated $46.0 million to LOC PERFORMANCE PRODUCTS LLC for work described as: BRADLEY ENGINEERING CHANGE PROPOSAL (ECP) 1 Key points: 1. Significant award for specialized vehicle components. 2. Competition method is full and open, suggesting potential for competitive pricing. 3. Risk is moderate due to the specialized nature of the components. 4. Sector is Defense Manufacturing, a critical area for national security.
Value Assessment
Rating: good
The award amount of $46M appears reasonable for engineering change proposals on armored vehicles. Benchmarking against similar ECPs would provide further validation, but the firm fixed price contract suggests cost control.
Cost Per Unit: N/A
Competition Analysis
Competition Level: full-and-open
The contract was awarded under full and open competition, which typically leads to better price discovery and potentially lower costs for the government. The use of a delivery order under an existing contract structure is common for managing ongoing needs.
Taxpayer Impact: Full and open competition aims to maximize taxpayer value by ensuring the government receives the best possible pricing through a competitive process.
Public Impact
Ensures continued modernization and maintenance of Bradley fighting vehicles. Supports a key defense contractor and its supply chain. Impacts readiness and operational capabilities of armored units.
Waste & Efficiency Indicators
Waste Risk Score: 50 / 10
Warning Flags
- Potential for cost overruns if scope creeps beyond ECP.
- Dependence on a single supplier for critical components.
- Long-term sustainment costs not fully detailed.
Positive Signals
- Awarded under full and open competition.
- Firm fixed price contract provides cost certainty.
- Supports critical defense modernization efforts.
Sector Analysis
This award falls within the Defense Manufacturing sector, specifically focusing on armored vehicle components. Spending in this area is driven by military readiness requirements and technological upgrades. Benchmarks for ECPs can vary widely based on complexity.
Small Business Impact
No direct indication of small business participation is provided in this data. Further analysis would be needed to determine if small businesses were involved as subcontractors or if there were opportunities missed.
Oversight & Accountability
The use of delivery orders under a larger contract structure implies existing oversight mechanisms. However, the specifics of the ECP review and approval process are not detailed here, warranting further investigation.
Related Government Programs
- Military Armored Vehicle, Tank, and Tank Component Manufacturing
- Department of Defense Contracting
- Department of the Army Programs
Risk Flags
- Potential for scope creep in ECPs.
- Dependence on specific supplier's technical expertise.
- Long-term sustainment costs may be underestimated.
- Limited visibility into subcontractor performance.
Tags
military-armored-vehicle-tank-and-tank-c, department-of-defense, mi, delivery-order, 10m-plus
Frequently Asked Questions
What is this federal contract paying for?
Department of Defense awarded $46.0 million to LOC PERFORMANCE PRODUCTS LLC. BRADLEY ENGINEERING CHANGE PROPOSAL (ECP) 1
Who is the contractor on this award?
The obligated recipient is LOC PERFORMANCE PRODUCTS LLC.
Which agency awarded this contract?
Awarding agency: Department of Defense (Department of the Army).
What is the total obligated amount?
The obligated amount is $46.0 million.
What is the period of performance?
Start: 2017-07-14. End: 2020-10-15.
What is the specific technical scope of these engineering change proposals and how do they enhance the Bradley Fighting Vehicle's capabilities?
The provided data does not detail the specific technical scope of the engineering change proposals (ECPs). ECPs typically address design modifications, upgrades, or corrections to improve performance, reliability, maintainability, or safety. For the Bradley Fighting Vehicle, these could range from armor enhancements and weapon system improvements to upgraded electronics or power systems, ultimately aiming to maintain its combat effectiveness against evolving threats.
What are the key performance metrics and deliverables associated with this contract, and how is their successful completion monitored?
Key performance metrics and deliverables are not explicitly detailed in the provided data. However, for an ECP contract, deliverables would likely include design documentation, prototypes, testing reports, and potentially updated technical manuals. Monitoring would typically involve regular progress reviews, milestone tracking, and acceptance testing by the Department of the Army to ensure the changes meet specified requirements and performance standards before full implementation.
Are there any identified risks related to the long-term sustainment and integration of these proposed changes into the existing Bradley fleet?
The data does not explicitly outline long-term sustainment risks. However, potential risks include the availability of spare parts for the new components, the need for specialized training for maintenance personnel, and the compatibility of the modified systems with existing fleet infrastructure and logistics. Integration risks could also arise if the changes introduce unforeseen interoperability issues or require significant modifications to other vehicle systems.
Industry Classification
NAICS: Manufacturing › Other Transportation Equipment Manufacturing › Military Armored Vehicle, Tank, and Tank Component Manufacturing
Product/Service Code: MOTOR VEHICLES, CYCLES, TRAILERS
Competition & Pricing
Extent Competed: FULL AND OPEN COMPETITION
Solicitation Procedures: NEGOTIATED PROPOSAL/QUOTE
Offers Received: 1
Pricing Type: FIRM FIXED PRICE (J)
Evaluated Preference: NONE
Contractor Details
Address: 13505 N HAGGERTY RD, PLYMOUTH, MI, 48170
Business Categories: Category Business, Corporate Entity Not Tax Exempt, Manufacturer of Goods, Small Business, Special Designations, U.S.-Owned Business
Financial Breakdown
Contract Ceiling: $46,027,980
Exercised Options: $46,027,980
Current Obligation: $46,027,980
Contract Characteristics
Commercial Item: COMMERCIAL ITEM PROCEDURES NOT USED
Cost or Pricing Data: NO
Parent Contract
Parent Award PIID: W56HZV17D0078
IDV Type: IDC
Timeline
Start Date: 2017-07-14
Current End Date: 2020-10-15
Potential End Date: 2020-10-15 00:00:00
Last Modified: 2025-04-24
More Contracts from LOC Performance Products LLC
- Multiple Launch Rocket System (mlrs) Improved Armor CAB (IAC) Kits — $293.8M (Department of Defense)
- Undefinitized Contract Action (UCA) Obligated First Delivery Order OFF W912ch-24-D-0025 for the Track Show Assembly QTY: 183,542 — $107.5M (Department of Defense)
- NEW Delivery Order to Base Onto Contract W56hzv-17-D-0078 for the Order of 415 ECP1 Vehicles — $76.1M (Department of Defense)
- This Action Awards 408 Each ECP1 Kits in the Fifth Ordering Period. 100 of the 408 ECP1 Kits ARE Awarded Without. This Action Also Award 1 ASL Spare and 13 Heavy Duty Lifting Slings — $73.1M (Department of Defense)
- Bradley Fighting Vehicle Engineering Change Proposal 1/ 414 Each — $71.5M (Department of Defense)
Other Department of Defense Contracts
- Federal Contract — $51.3B (Humana Government Business Inc)
- Lrip LOT 12 Advance Acquisition Contract — $35.1B (Lockheed Martin Corporation)
- SSN 802 and 803 Long Lead Time Material — $34.7B (Electric Boat Corporation)
- 200204!008532!1700!AF600 !naval AIR Systems Command !N0001902C3002 !A!N! !N! !20011026!20120430!008016958!008016958!834951691!n!lockheed Martin Corporation !lockheed Blvd !fort Worth !tx!76108!27000!439!48!fort Worth !tarrant !texas !+000026000000!n!n!018981928201!ac15!rdte/Aircraft-Eng/Manuf Develop !a1a!airframes and Spares !2ama!jast/Jsf !336411!E! !3! ! ! ! ! !99990909!B! ! !A! !a!n!r!2!002!n!1a!a!n!z! ! !N!C!N! ! ! !a!a!a!a!000!a!c!n! ! ! !Y! !N00019!0001! — $34.2B (Lockheed Martin Corporation)
- KC-X Modernization Program — $32.0B (THE Boeing Company)